 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/14/2018 |
240132307 |
04 |
A2 |
P APPROVED |
02/22/2018 |
|
IBRAHIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,1S 001 thru 003
|
| 01/25/2018 |
240132307 |
03 |
A2 |
P APPROVED |
02/09/2018 |
|
IBRAHIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,1S 001 thru 003
|
| 08/15/2017 |
240132307 |
02 |
A2 |
P APPROVED |
11/21/2017 |
|
IBRAHIM |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 APPLICATION IS FILED FOR INTERIOR BUILDING
|
|
Work on Floor(s): CEL,1S 001 thru 003
|
| 02/23/2016 |
240132307 |
01 |
A2 |
X SIGNED OFF |
05/21/2018 |
0093911 PE |
IBRAHIM |
|
NOT APPLICABLE
|
|
APPLICATION IS FILED FOR INTERIOR BUILDING COSMETIC RENOVATION, RESOLVE VI
|
|
Work on Floor(s): CEL,1S 001 thru 003
|
| 03/14/2007 |
201110662 |
01 |
A1 |
J P/E DISAPPROVED |
03/23/2007 |
0065052 PE |
NATION |
|
NOT APPLICABLE
|
|
CONVERTING 2 FAMILY DWELLING TO 3 FAMILY DWELLING, INSTALLATION OF PARTITI
|
|
Work on Floor(s): 001 thru 003
|
| 08/12/1996 |
200378340 |
01 |
A1 |
J P/E DISAPPROVED |
08/15/1996 |
0021308 RA |
CHRISTMA |
|
NOT APPLICABLE
|
|
LEGALIZATION OF EXISTING 2 FAMILY DWELLI NG CONVERTED TO ONE FAMILY &
|
|
Work on Floor(s): CEL,001,002,003
|
| 02/08/1991 |
200102940 |
01 |
A2 |
R PERMIT-ENTIRE |
09/15/1994 |
0052592 PE |
KAUFMAN |
|
NOT APPLICABLE
|
|
INSTALL NEW SPRINKLER SYSTEM 1ST FL.HALL WAY AND ENTIRE SECOND
|
|
Work on Floor(s): 1ST,2ND,3RD
|