| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/28/2018 |
240183804 |
04 |
A2 |
P APPROVED |
04/02/2018 |
|
AKERMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003,004,005
|
| 02/09/2018 |
240183804 |
03 |
A2 |
P APPROVED |
02/09/2018 |
|
AKERMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003,004,005
|
| 12/21/2017 |
240183804 |
02 |
A2 |
P APPROVED |
12/21/2017 |
|
AKERMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002,003,004,005
|
| 05/19/2017 |
240183804 |
01 |
A2 |
X SIGNED OFF |
04/03/2018 |
0039316 RA |
AKERMAN |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION AS SHOWN ON PLANS FILED HEREWITH.
|
|
Work on Floor(s): 002,003,004,005
|
| 02/02/2017 |
240172059 |
01 |
A3 |
R PERMIT-ENTIRE |
02/06/2017 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
PROPOSED ROOF JOIST AND ROOFING REPAIR WORK AS PER PLANS. NO CHANGE IN USE
|
|
Work on Floor(s): ROF
|
| 12/19/2016 |
240167270 |
01 |
A3 |
R PERMIT-ENTIRE |
12/22/2016 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
PROPOSED EXTERIOR FACADE REPAIR WORK OAS PER PLANS. NO CHANGE IN USE EGRES
|
|
Work on Floor(s): ROF
|
| 12/07/2016 |
240165860 |
01 |
A2 |
X SIGNED OFF |
12/12/2016 |
0088704 PE |
SHEYMAN |
|
NOT APPLICABLE
|
|
NO CHANGE IN USE, OCCUPANCY OR EGRESS. EMERGENCY ROOF REPAIR DUE TO FIRE,
|
|
Work on Floor(s): 005,ROF
|
| 12/01/2016 |
240165049 |
01 |
A3 |
X SIGNED OFF |
06/01/2018 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY 48'HIGH PIPE SCAFFOLD ORIGINATING OFF SHED AS PE
|
|
Work on Floor(s): ROF 001 thru 005
|
| 11/30/2016 |
240164941 |
01 |
A3 |
X SIGNED OFF |
06/01/2018 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|