| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/31/2023 |
220095019 |
02 |
A2 |
P APPROVED |
11/08/2023 |
|
BENABDEL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 10/26/2022 |
220705663 |
02 |
A2 |
P APPROVED |
12/23/2022 |
|
MIELES |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROO 001 thru 005
|
| 08/22/2019 |
240260677 |
01 |
A2 |
H P/E IN PROCESS |
08/22/2019 |
0087310 PE |
GUNAL |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 10/21/2019 REMOVAL OF ONE OF THE EXISTING OIL-FIRED BOILER, I
|
|
Work on Floor(s): CEL
|
| 06/04/2019 |
220705663 |
01 |
A2 |
X SIGNED OFF |
06/14/2024 |
0020526 RA |
MIELES |
|
NOT APPLICABLE
|
|
HEREWITH FILE APPLICATION AND DRAWINGS TO MODERATELY RENOVATE APARTMENTS R
|
|
Work on Floor(s): CEL,ROO 001 thru 005
|
| 11/18/2016 |
240164184 |
01 |
A3 |
X SIGNED OFF |
10/23/2017 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN SUBMITTED. WORK SHALL
|
|
Work on Floor(s): OSP
|
| 11/04/2016 |
240162328 |
01 |
A2 |
R PERMIT-ENTIRE |
11/07/2016 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
RE-LINE EXISTING EXTERIOR METAL CHIMNEY AS PER PLANS. NO CHANGE IN USE,
|
|
Work on Floor(s): OSP,ROF
|
| 11/30/2010 |
220095019 |
01 |
A2 |
R PERMIT-ENTIRE |
12/02/2011 |
0081742 PE |
BENABDEL |
|
NOT APPLICABLE
|
|
PROPOSED CONSTRUCTION OF NEW LINER CONCRETE RETAINING WALL, & REMAIN EXIST
|
|
Work on Floor(s): OSP
|
| 12/29/2005 |
200906403 |
01 |
A2 |
R PERMIT-ENTIRE |
01/12/2006 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER ON RIGHT HAND BOILER (BOILER NO. MD66032-02). NO CHANGE
|
|
Work on Floor(s): CEL
|
| 05/20/2003 |
200610302 |
07 |
A1 |
P APPROVED |
05/20/2003 |
0019304 RA |
DEPASQUA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 005
|
| 08/30/2001 |
200610302 |
06 |
A1 |
P APPROVED |
09/06/2001 |
0019304 RA |
DEPASQUA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001 thru 004
|
| 08/30/2001 |
200610302 |
05 |
A1 |
P APPROVED |
09/06/2001 |
0019304 RA |
DEPASQUA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 08/15/2001 |
200681654 |
01 |
A2 |
J P/E DISAPPROVED |
08/20/2001 |
0061693 PE |
DURGANA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/26/2003 INSTALL FIRE ALARM SYSTEM
|
|
Work on Floor(s): BAS,ROF 001 thru 005
|
| 07/17/2001 |
200610302 |
04 |
A1 |
P APPROVED |
07/17/2001 |
0019304 RA |
DEPASQUA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 004
|
| 07/17/2001 |
200610302 |
03 |
A1 |
P APPROVED |
07/17/2001 |
0019304 RA |
DEPASQUA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001 thru 004
|
| 01/19/2001 |
200655567 |
01 |
A3 |
X SIGNED OFF |
04/30/2003 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SHED 50'DUR ING FACADE REPAIR.NO CHANGE IN
|
|
Work on Floor(s): GRD
|
| 07/03/2000 |
200610302 |
02 |
A1 |
X SIGNED OFF |
05/23/2003 |
0019304 RA |
DEPASQUA |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER SYSTEM.TOTAL N UMBER OF SPRINKLER HEADS :108
|
|
Work on Floor(s): 001 thru 004
|
| 02/18/2000 |
200610302 |
01 |
A1 |
X SIGNED OFF |
05/23/2003 |
0019304 RA |
DEPASQUA |
|
NOT APPLICABLE
|
|
NEW INTERIOR WORK, SHEETROCK, MASONARY , ROOF, REPLACEMENT, WOOD, JOIST
|
|
Work on Floor(s): 001 thru 005
|
| 12/13/1989 |
200020397 |
01 |
A2 |
X SIGNED OFF |
05/08/1990 |
0056795 PE |
VARGAS |
|
NOT APPLICABLE
|
|
REPIPE ENTIRE BUILDING W/TYPE"L"COPPER TUBING FOR DOMESTIC WATER, BLACK IR
|
|
Work on Floor(s): 1ST,THR,5TH
|