| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/12/2018 |
240224379 |
01 |
A2 |
R PERMIT-ENTIRE |
06/29/2018 |
0032789 RA |
AUFGANG |
|
NOT APPLICABLE
|
|
RENOVATION OF BATHROOMS AND KITCHENS IN 1 APARTMENT TO COMPLY WITH UFAS MO
|
|
Work on Floor(s): 001
|
| 10/05/2017 |
240153310 |
03 |
A2 |
P APPROVED |
10/05/2017 |
|
DIBARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 09/26/2017 |
240153310 |
02 |
A2 |
P APPROVED |
10/05/2017 |
|
DIBARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 10/12/2016 |
240153310 |
01 |
A2 |
X SIGNED OFF |
07/26/2018 |
0062063 PE |
DIBARI |
|
NOT APPLICABLE
|
|
INSTALLATION OF BOILER SYSTEM IN CONJUNCTION WITH JOB NO. 240126029. NO CH
|
|
Work on Floor(s): CEL
|
| 06/08/2016 |
240144642 |
01 |
A2 |
H P/E IN PROCESS |
06/08/2016 |
0062063 PE |
DIBARI |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 08/07/2016 INSTALLATION OF NEW BOILER AND HOT WATER HEATING S
|
|
Work on Floor(s): BAS
|
| 12/15/2015 |
240126029 |
01 |
A2 |
X SIGNED OFF |
12/21/2017 |
0032789 RA |
AUFGANG |
|
NOT APPLICABLE
|
|
MODERATE INTERIOR RENOVATION OF APARTMENTS AND COMMON AREAS. MODERATE EXT
|
|
Work on Floor(s): BAS,ROF 001 thru 004
|
| 06/28/1995 |
200119193 |
04 |
A1 |
P APPROVED |
06/28/1995 |
0012493 RA |
HURTIBIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 SUBSTANTIAL REHAB. OF EXISTING 8 APTS--- RE
|
|
Work on Floor(s): CEL,1, 2, 3, 4
|
| 03/16/1994 |
200119193 |
03 |
A1 |
D A/P ENTIRE |
03/16/1994 |
0007645 RA |
RAUNSTEI |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/21/1994 REHAB. OF EXIST' 8 APTS. RESIDENTAIL - BLGD. WO
|
|
Work on Floor(s): CEL 1 thru 4
|
| 09/20/1991 |
200119193 |
02 |
A1 |
X SIGNED OFF |
09/20/1995 |
0007645 RA |
CHARLES |
|
NOT APPLICABLE
|
|
SEE SEC. 16 - COMMENTS
|
|
Work on Floor(s): CEL,1, 2, 3, 4
|
| 06/28/1991 |
200119193 |
01 |
A1 |
X SIGNED OFF |
09/20/1995 |
0007645 RA |
BRAUNSTE |
|
NOT APPLICABLE
|
|
SUBSTANTIAL REHAB. OF EXISTING 8 APTS--- RESIDENTIAL BLDG. WORK TO
|
|
Work on Floor(s): CEL,1, 2, 3, 4
|
| 05/10/1991 |
200114241 |
01 |
A3 |
X SIGNED OFF |
07/22/1991 |
0025706 PE |
KAMHOLTZ |
|
NOT APPLICABLE
|
|
ERECT SHORING FOR STABILIZATION OF FACA- DES. NO CHANGE IN USE ,EGRESS O
|
|
Work on Floor(s): GRD
|
| 03/11/1991 |
200106241 |
01 |
A3 |
R PERMIT-ENTIRE |
09/20/1995 |
0025706 PE |
KAMHOLTZ |
|
NOT APPLICABLE
|
|
ERECTING 48' FT. BY 30' FT. SAFFOLD DURING FACADE REPAIR. NO CHANGE
|
|
Work on Floor(s): G
|
| 03/08/1991 |
200105938 |
01 |
A3 |
R PERMIT-ENTIRE |
09/01/1992 |
0014984 RA |
LEE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/12/1995 REPLACEMENT OF DAMAGED WOOD FLOOR JOISTS FROM
|
|
Work on Floor(s): 1ST,2, 3RD,4TH
|
| 09/27/1990 |
200080081 |
01 |
A3 |
R PERMIT-ENTIRE |
07/24/1991 |
0014984 RA |
LEE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/12/1995 REMOVAL OF NON-BEARING PARTITIONS AND DE BRIS FRO
|
|
Work on Floor(s): 1 thru 4
|