| 06/19/2012 |
220056230 |
03 |
A2 |
P APPROVED |
07/26/2012 |
|
HARRIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 08/08/2011 |
220132835 |
01 |
A2 |
X SIGNED OFF |
01/18/2012 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER (NYC BOILER NO: MD923265-01). NO CHANGE IN U
|
|
Work on Floor(s): CEL
|
| 03/18/2011 |
220108899 |
01 |
A3 |
R PERMIT-ENTIRE |
03/18/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF 210 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 12/14/2010 |
220096875 |
01 |
A3 |
X SIGNED OFF |
10/10/2012 |
0080123 PE |
SYED-NA |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE PARAPET WALL APPROX. 240 LFT AS PER PLAN.NO CHANGE IN U
|
|
Work on Floor(s): OSP
|
| 07/01/2010 |
220070312 |
01 |
A2 |
X SIGNED OFF |
04/10/2012 |
0026814 RA |
HARRIS |
|
NOT APPLICABLE
|
|
REHABILITATION OF RESIDENTIAL APARTMENTS AND REPLACEMENT OF PLUMBING FIXT
|
|
Work on Floor(s): 001 thru 006
|
| 06/22/2010 |
220056230 |
02 |
A2 |
P APPROVED |
05/01/2012 |
|
HARRIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSED WORK TO ONLY BE DONE ON THE ROOF O
|
|
Work on Floor(s): ROF
|
| 04/12/2010 |
220056230 |
01 |
A2 |
X SIGNED OFF |
08/07/2012 |
0026814 RA |
HARRIS |
|
NOT APPLICABLE
|
|
PROPOSED WORK TO ONLY BE DONE ON THE ROOF ONLY
|
|
Work on Floor(s): ROF
|
| 04/02/2009 |
220000335 |
01 |
A3 |
R PERMIT-ENTIRE |
03/17/2010 |
0080123 PE |
SYED NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF 210 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL
|
|
Work on Floor(s): OSP
|