FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
04/05/2024 |
240349716 |
03 |
A2 |
P APPROVED |
05/31/2024 |
|
MAHANGU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
07/24/2023 |
240349716 |
02 |
A2 |
P APPROVED |
10/06/2023 |
|
MAHANGU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
06/14/2023 |
240349716 |
01 |
A2 |
X SIGNED OFF |
08/21/2024 |
0089068 PE |
MAHANGU |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY
|
|
Work on Floor(s): ROF
|
08/13/2020 |
240279523 |
01 |
A2 |
R PERMIT-ENTIRE |
01/25/2021 |
0073223 PE |
KUSI |
|
NOT APPLICABLE
|
|
APPLICATION BEING FILED TO REMOVE CELLAR INTERIOR WALL PARTITIONS BUILT WI
|
|
Work on Floor(s): CEL
|
09/08/2020 |
240281814 |
01 |
A1 |
J P/E DISAPPROVED |
12/09/2020 |
0020478 RA |
LEDER-LU |
|
NOT APPLICABLE
|
|
DIVIDE APARTMENT ON FIRST FLOOR INTO TWO APARTMENTS, DIVIDE APARTMENT ON F
|
|
Work on Floor(s): 001,005
|
05/15/2019 |
220682027 |
01 |
A2 |
R PERMIT-ENTIRE |
08/27/2019 |
0073223 PE |
KUSI |
|
NOT APPLICABLE
|
|
APLLICATION BEING FILED TO REPAIR FACADE INCLUDING BRICK MASONRY REPOINTIN
|
|
Work on Floor(s): 006 thru 007
|
08/03/2018 |
240231824 |
01 |
A2 |
X SIGNED OFF |
08/11/2021 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
EXTEND TWO (2) HOT WATER HEATER VENTS TO ROOF PER PLANS.
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
07/26/2016 |
220469981 |
02 |
A2 |
P APPROVED |
07/26/2016 |
|
CHRYSLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSED (2) DIRECT-VENT, HIGH EFFICIENCY D
|
|
Work on Floor(s): CEL
|
08/18/2015 |
220469981 |
01 |
A2 |
X SIGNED OFF |
04/10/2017 |
0076805 PE |
CHRYSLER |
|
NOT APPLICABLE
|
|
PROPOSED (2) DIRECT-VENT, HIGH EFFICIENCY DOMESTIC HOT WATER HEATERS. NO C
|
|
Work on Floor(s): CEL
|
06/16/2015 |
220247418 |
02 |
A2 |
P APPROVED |
06/16/2015 |
|
RUDIKOFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
04/28/2015 |
220426153 |
02 |
A2 |
P APPROVED |
05/01/2015 |
|
LEDER-LU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
02/10/2015 |
220426153 |
01 |
A2 |
X SIGNED OFF |
11/05/2015 |
0020478 RA |
LEDER-LU |
|
NOT APPLICABLE
|
|
GAS RE PIPING OF ENTIRE BUILDING. REMOVE METERS FROM APARTMENTS AND REPLA
|
|
Work on Floor(s): BAS 001 thru 006
|
12/05/2014 |
220416841 |
01 |
A2 |
X SIGNED OFF |
09/16/2015 |
0034135 RA |
ZAPATA |
|
NOT APPLICABLE
|
|
HEREWITH TO PROPOSE INTERIOR RENOVATION BATH ROOMS AND KITCHENS INCLUDE TH
|
|
Work on Floor(s): 001 thru 006
|
01/15/2013 |
220247418 |
01 |
A2 |
X SIGNED OFF |
06/17/2016 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE OIL BURNER WITH GAS/OIL BURNER ON NYC BOILER NO. MD 2878-01. INSTA
|
|
Work on Floor(s): CEL
|
12/05/2011 |
220158889 |
01 |
A3 |
R PERMIT-ENTIRE |
12/05/2011 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
11/29/2011 |
220157728 |
01 |
A2 |
R PERMIT-ENTIRE |
01/11/2012 |
0059160 PE |
LAVON |
|
NOT APPLICABLE
|
|
FILING FACADE REPAIR WORK AS SHOWN ON DWGS S-001.00 TO S-011.00 NO CHANGE
|
|
Work on Floor(s): 001 thru 006
|
10/04/1993 |
200270152 |
01 |
A2 |
R PERMIT-ENTIRE |
10/05/1993 |
0047135 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REPLACE 1 L.P. BOILER AND OIL BURNER NO CHANGE IN MEANS OF EGRESS,
|
|
Work on Floor(s): CEL
|