| | | | | | | |
FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
03/07/2017 |
220280014 |
PR |
E LAA FILED |
06/22/2017 |
MP 000699 |
CALIX |
|
CAP AND REMOVE IN BASEMENT: 3PC BATHROOM (SINK, TOILET, SHOWER) AND 1PC KI
|
|
Work on Floor(s): BAS
|
06/23/2014 |
220310768 |
PR |
I LAA SIGNED OFF |
11/23/2015 |
MP 002157 |
TRAUM |
|
INSTALL METER BAR AND RUN APPROX 50'X4" AND 15'X3" BLACK PIPE FOR EXISTING
|
|
Work on Floor(s): CEL
|
12/28/2012 |
210173328 |
PR |
I LAA SIGNED OFF |
11/13/2015 |
OBI 005355 |
CAPPUCCI |
|
CHANGE GRADE OF FUEL FROM #6 TO #4. A PRE-HEATER WILL BE REMOVED AND AN AN
|
|
Work on Floor(s): CEL
|