 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 11/29/2017 |
220376215 |
PR |
E LAA FILED |
12/05/2017 |
OBI 005352 |
BAUER |
|
EWN #14770: INSTALLATION OF A TEMPORARY MOBILE BOILER (NYC #166577-01)
|
|
Work on Floor(s): OSP
|
| 08/30/2016 |
220371292 |
PR |
I LAA SIGNED OFF |
06/14/2018 |
MP 001167 |
MARKOWIT |
|
REPLACE (51) METER BARS FOR EXISTING METERS IN THE CELLAR FOR EXISTING STO
|
|
Work on Floor(s): CEL 001 thru 005
|
| 09/11/2014 |
240072201 |
PR |
I LAA SIGNED OFF |
04/10/2017 |
OBI 005352 |
BAUER |
|
REPLACE OIL BURNER, EXISTING BOILER(NYC# 73328-01) EMERGENCY FILINGALTII&2
|
|
Work on Floor(s): CEL
|
| 03/21/2014 |
210185985 |
PR |
I LAA SIGNED OFF |
04/17/2014 |
MP 000239 |
LEMANSKI |
|
REPIPE METER BAR. REPIPE APPROX. 20-30FT. OF 3/4" GAS PIPING FROM METER IN
|
|
Work on Floor(s): 002
|
| 02/13/2013 |
210174737 |
PR |
E LAA FILED |
02/20/2013 |
MP 000239 |
LEMANSKI |
|
REPIPE METER BAR. REPIPE APPROX 20-30' X 3/4" GAS PIPING FROM METER IN APT
|
|
Work on Floor(s): 002
|
| 07/20/2011 |
210165541 |
PR |
I LAA SIGNED OFF |
09/02/2011 |
MP 000239 |
LEMANSKI |
|
REPIPE METER BAR. REPIPE APPROX 20-30'X3/4" GAS PIPING FROM METER IN APT #
|
|
Work on Floor(s): 002
|