 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/20/2016 |
220551310 |
01 |
A3 |
X SIGNED OFF |
12/19/2017 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. ALL WORK
|
|
Work on Floor(s): OSP
|
| 08/30/2016 |
220547674 |
02 |
A3 |
P APPROVED |
08/30/2016 |
|
HOQUE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PROPOSED INSTALLATION OF HEAVY DUTY SIDEWAL
|
|
Work on Floor(s): OSP
|
| 08/26/2016 |
220547674 |
01 |
A3 |
R PERMIT-ENTIRE |
08/30/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 05/19/2015 |
240049639 |
02 |
A2 |
G PAA FEE DUE |
05/19/2015 |
|
PACIFICO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 08/24/2015
|
|
Work on Floor(s): ROF
|
| 05/13/2015 |
240055836 |
02 |
A2 |
P APPROVED |
05/13/2015 |
|
MESZAROS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 04/22/2014 |
240055836 |
01 |
A2 |
X SIGNED OFF |
03/07/2017 |
0088892 PE |
MESZAROS |
|
NOT APPLICABLE
|
|
CONVERSION OF HEATING PLANT AND SYSTEM FROM LOW PRESSURE STEAM TO HOT WATE
|
|
Work on Floor(s): CEL
|
| 04/17/2014 |
240049639 |
01 |
A2 |
X SIGNED OFF |
09/14/2016 |
0066182 PE |
PACIFICO |
|
NOT APPLICABLE
|
|
INSTALLATION OF SOLAR ENERGY SYSTEM
|
|
Work on Floor(s): ROF
|
| 03/11/2004 |
200843178 |
01 |
A3 |
R PERMIT-ENTIRE |
01/20/2005 |
0075876 PE |
Yusaf |
|
NOT APPLICABLE
|
|
Repair exterior building wall defects and replaced deteriorated lintels an
|
|
Work on Floor(s): OSP
|
| 01/27/2004 |
200826133 |
01 |
A3 |
R PERMIT-ENTIRE |
04/05/2004 |
0654301 PE |
HICKEY |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 50', DURING FACADE REPAIR.
|
|
Work on Floor(s): GRO
|
| 11/22/1989 |
200017034 |
01 |
A2 |
Q PERMIT-PARTIAL |
12/08/1989 |
0038313 PE |
CHIARO |
|
NOT APPLICABLE
|
|
BOILER/BURNER REPLACEMENT CHKANGE OF OIL FROM #6 TO #2 STRUCTURAL STABILIT
|
|
Work on Floor(s): C
|