![]() |
|
|
| NYC Department of Buildings | ||
| Electrical Application Details for App #: B336095 | ||
| NO JOBS FOUND WITH YOUR CRITERIA | ||
| Premises: 1715 KINGS HIGHWAY BROOKLYN | BIN: 3182465 Block: 6780 Lot: 12 |
| Printable (PDF) version of this Permit | |||||||||||
| DOB NOW: Inspections | |||||||||||
| Filed: | 1632 E 18ST | Census Tract: 5520 | Health Area: 7320 | |
| BASEMENT | Admin Area: B - BROOKLYN | Inspection Area: T | ||
| BROOKLYN, NY 11229 | Community Board: 315 | |||
| DOB Cross Street(s): AVENUE P, KINGS HIGHWAY | |||
| Status: E - ABANDONED 08/22/2025 | |||
| Request Type: A - APPLICATION | eFiled: YES | Permit Issued: 02/18/2011 11:06 AM | |
| Application Entered: 02/18/2011 | Job Start Date: 02/18/2011 | ||
| Last Change: 08/22/2025 | Job End Date: 12/15/2011 | ||
| Appointment Status: | |||
| Last Inspection By: PETER GREENE On 08/15/2011 | |||
| Field Disp: V - OBJCTN ISSD: JOB INCOMPLT | |||
| Energize Recommendation: E - ISSUE POWER AUTH | |||
| Objection Disposition: | |||
| License #: | 011212 | Licensee Name: | PAUL LEFKOWITZ | |
| Firm: | 001756 | Firm Name: | BLZ ELECTRIC INC. | |
| Firm Phone: | 718-677-5900 | Firm Address: | 1243 EAST 15TH STREET BROOKLYN NY 11230 | |
| Work Started or Filed by Others: NO | ||||||||
| Work Category: R - REHABILITATION | Work To Be Done:
8 - BOILER/BURNER WIRING |
Total Fee: $52.00 | ||||||
| Other Work: | ||||||||
| Work Related to a New or Amended Certificate of Occupancy: NO | ||||||||
| This Job Regulated by the NYC Energy Conservation Code: No | ||||||||
| Building Used As: L - Five Or More Family | |||||||
| Special Cert Approval: B - BOILER CONTROLS J-51 CERTIFICATION | |||||||
| Advisory Board Approval: NOT APPLICABLE | |||||||
| Owner / Occup: | |||||||
| Owner Business Name: | BRG 18 LLC | ||||||
| Authorized Representative: R BAUER | |||||||
| Relationship To Owner: REP | |||||||
|
|
| Floor | Apt. | Number Of Outlets | No. Of Fixtures |
Motors / Generators | Heaters | Transformers | ||||||
| Fixt | Receptacles | Switch | Num | Total HP KW | Num | Total KW | Num | Total KVA | ||||
| ATT | A/C | |||||||||||
| BAS | 2 | 3 | ||||||||||
| Buildings Total | 3 | |||||||||||
| Total Units : 3 units | ||||||||||||
| Signs: | Field Connect: | 0 | Field Inspect: | 0 | Tags: | ||
| Meter Request to Utility | #3-Wire | 0 | #4-Wire | 0 | #10-Wire | 0 | |
| Existing Meters | 0 | + New Meters | 0 | - Removed Meters | 0 | = Total Meters | 0 |
| Power Auth Flag: | I - ISSUED | Objection Flag: | V - OBJECTION(S) EXIST |
| Power Requested: | 08/22/2011 | Notice: | 1 - FIRST NOTICE 08/22/2011 |
| Power Issued: | 08/22/2011 | Response: |
| Follow-Up: | |||
| Contractor's Comments: | |||
|
|
| *NO JOBS FOUND WITH YOUR CRITERIA |
| INSP ID |
FIELD DATE |
DISP DATE |
INSP ID |
FLD DISP |
OBJ DISP |
ENRG REC |
TIME INSP |
REINSP DATE |
NEW OBJ |
APPT FLAG |
| (1) | 08/15/2011 | 08/22/2011 | PGR | V | E | (55) | (3) | Y | ||
| INSPECTION COMMENTS: | BOILER MOTOR 3 PHASE PLP IS 2 PHASE | |||||||||