 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/01/2024 |
220633376 |
08 |
A1 |
P APPROVED |
01/23/2025 |
|
MUROFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 11/13/2023 |
220633376 |
07 |
A1 |
P APPROVED |
09/17/2024 |
0015011 RA |
MUROFF |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 09/22/2023 |
220633376 |
06 |
A1 |
P APPROVED |
10/10/2023 |
|
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 04/24/2023 |
220633376 |
05 |
A1 |
P APPROVED |
04/26/2023 |
|
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 08/25/2022 |
220633376 |
04 |
A1 |
P APPROVED |
03/15/2023 |
|
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 08/10/2022 |
220685863 |
08 |
A2 |
P APPROVED |
08/11/2022 |
|
TRAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF,UDG 001 thru 004
|
| 07/15/2022 |
220685863 |
07 |
A2 |
P APPROVED |
08/02/2022 |
|
TRAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF,UDG 001 thru 004
|
| 03/07/2022 |
220685863 |
06 |
A2 |
P APPROVED |
03/08/2022 |
|
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 02/22/2022 |
220633376 |
03 |
A1 |
P APPROVED |
02/28/2022 |
|
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 02/11/2022 |
220685863 |
05 |
A2 |
P APPROVED |
02/28/2022 |
|
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 11/02/2020 |
240292376 |
01 |
A2 |
X SIGNED OFF |
02/18/2022 |
0019542 RA |
GROSS |
|
NOT APPLICABLE
|
|
HEREWITH FILING ARCHITECTURAL WORK RELATED TO CONSTRUCTION OF ELEVATOR SHA
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 10/25/2019 |
220633376 |
02 |
A1 |
P APPROVED |
10/28/2019 |
|
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 08/06/2019 |
220633367 |
02 |
A2 |
P APPROVED |
08/07/2019 |
|
TRAN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/16/2022
|
|
Work on Floor(s): CEL 001 thru 004
|
| 08/06/2019 |
220685863 |
04 |
A2 |
P APPROVED |
08/07/2019 |
|
TRAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF,UDG 001 thru 004
|
| 06/21/2019 |
220685863 |
03 |
A2 |
P APPROVED |
06/21/2019 |
0019542 RA |
GROSS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 04/23/2019 |
220633376 |
01 |
A1 |
X SIGNED OFF |
08/11/2025 |
0015011 RA |
MUROFF |
|
NOT APPLICABLE
|
|
HEREWITH FILING ALTERATION TYPE 1 FOR MINOR PARTITION WORK TO CHANGE USE O
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/18/2019 |
220685845 |
01 |
A2 |
J P/E DISAPPROVED |
05/07/2020 |
0097665 PE |
TRAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/13/2022 INSTALLATION OF MANUAL, AUTOMATIC SMOKE/HEAT/CO D
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/18/2019 |
220685854 |
01 |
A2 |
X SIGNED OFF |
10/05/2022 |
0069183 PE |
FRIEDMAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING STRUCTURAL WORK FOR ELEVATOR SHAFT, CONVENIENCE STAIRS AND
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/18/2019 |
220633367 |
01 |
A2 |
P APPROVED |
01/18/2019 |
0097665 PE |
TRAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/16/2022 HEREWITH FILING PSRINKLER MODIFICATIONS RELATED T
|
|
Work on Floor(s): CEL 001 thru 004
|
| 01/18/2019 |
220685863 |
01 |
A2 |
X SIGNED OFF |
11/16/2022 |
0019542 RA |
GROSS |
|
NOT APPLICABLE
|
|
HEREWITH FILING ARCHITECTURAL WORK FOR INTERIOR DEMOLITION AND CONSTRUCTIO
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 01/18/2019 |
220685863 |
02 |
A2 |
X SIGNED OFF |
11/16/2022 |
0097665 PE |
TRAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING MECHANICAL AND PLUMBING WORK RELATED TO OFFICE RENOVATION
|
|
Work on Floor(s): CEL,ROF,UDG 001 thru 004
|
| 05/22/2017 |
220361132 |
02 |
A3 |
P APPROVED |
06/29/2017 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 05/22/2017 |
220355693 |
02 |
A3 |
P APPROVED |
06/29/2017 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 05/23/2014 |
220355693 |
01 |
A3 |
X SIGNED OFF |
07/03/2017 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SIDEWALK SHED APPROXIMATELY 62'LONG AS PER PLANS DURING
|
|
Work on Floor(s): 001
|
| 05/23/2014 |
220361132 |
01 |
A3 |
X SIGNED OFF |
06/30/2017 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD AS PER PLANS DURING GENERAL CONSTRUCTION WORK.
|
|
Work on Floor(s): 001
|
| 06/28/2012 |
220194448 |
01 |
A2 |
P APPROVED |
07/11/2012 |
0012737 RA |
ELKIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/05/2022 INSTALL NEW CLADDING ON EXISTING FACADE AND NEW S
|
|
Work on Floor(s): 001,002,003,004,ROF
|
| 10/14/2009 |
200796415 |
03 |
PA |
P APPROVED |
10/14/2009 |
|
VARGAS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 2
|
| 11/13/2008 |
210078360 |
01 |
A2 |
P APPROVED |
11/13/2008 |
0018684 RA |
MONTOYA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/05/2022 NO WORK APPLICATION FILED TO DEPICT EXISTING COND
|
|
Work on Floor(s): 002
|
| 03/21/2007 |
200660285 |
04 |
A1 |
P APPROVED |
04/19/2007 |
0011145 RA |
BUTTERFI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF,004
|
| 03/31/2006 |
200368440 |
02 |
A2 |
P APPROVED |
04/06/2006 |
0056795 PE |
VARGAS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 4
|
| 04/26/2005 |
200660285 |
03 |
A1 |
P APPROVED |
06/30/2005 |
0011145 RA |
BUTTERFI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF,004
|
| 04/11/2005 |
200944167 |
01 |
A2 |
X SIGNED OFF |
07/13/2006 |
0011145 RA |
BUTTERFI |
|
NOT APPLICABLE
|
|
PROVIDE NEW TOILET, LAVATORY AND SINK; PARTITIONS; DOORS; EXHUAST DUCT
|
|
Work on Floor(s): 004
|
| 03/10/2005 |
200937157 |
01 |
PA |
U COMPLETED |
11/20/2006 |
0011145 RA |
BUTTERFI |
|
NOT APPLICABLE
|
|
Work on Floor(s): 004
|
| 12/03/2004 |
200796415 |
02 |
PA |
P APPROVED |
01/07/2005 |
0024093 RA |
WEISBERG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 2
|
| 03/29/2004 |
200841937 |
02 |
A2 |
P APPROVED |
04/29/2004 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 2ND
|
| 03/05/2004 |
200841937 |
01 |
A2 |
X SIGNED OFF |
07/18/2006 |
0018233 RA |
GUTHARTZ |
|
NOT APPLICABLE
|
|
INSTALL 2 MODINE U NIT HEATERS ON 1ST FL NO CHANGE TO USE EGRESS OR OCCU
|
|
Work on Floor(s): 2ND
|
| 02/24/2004 |
200660285 |
02 |
A1 |
X SIGNED OFF |
04/19/2007 |
0039888 PE |
BUTTERFI |
|
NOT APPLICABLE
|
|
INSTALL DUCT AND DIFFUSERS ON 4TH FLOOR AND A 15 TON AIR CONDITIONER AND
|
|
Work on Floor(s): 004,ROF
|
| 11/25/2003 |
200817438 |
01 |
A2 |
X SIGNED OFF |
11/16/2006 |
0240931 RA |
WEISBERG |
|
NOT APPLICABLE
|
|
RESPECTFULLY SUBMIT AS BUILT DRAWINGS TO LEGALIZE THE INSTALLATION AND
|
| 07/07/2003 |
200796415 |
01 |
PA |
U COMPLETED |
01/10/2005 |
0056795 PE |
VARGAS |
|
NOT APPLICABLE
|
|
Work on Floor(s): 2
|
| 03/06/2001 |
200660285 |
01 |
A1 |
X SIGNED OFF |
04/19/2007 |
0011145 RA |
BUTTERFI |
|
NOT APPLICABLE
|
|
PROPOSE CHANGE OF USE FROM FACTORY TO PH YSICAL CULTURE ESTABLISHMENT O
|
|
Work on Floor(s): ROF,004
|