 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/07/2014 |
220259887 |
04 |
A2 |
P APPROVED |
11/07/2014 |
|
ZHAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004,005
|
| 10/16/2014 |
220259887 |
03 |
A2 |
P APPROVED |
10/16/2014 |
|
ZHAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004,005
|
| 11/25/2013 |
220259887 |
02 |
A2 |
P APPROVED |
11/25/2013 |
|
ZHAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002,003,004,005
|
| 03/27/2013 |
220259887 |
01 |
A2 |
X SIGNED OFF |
10/14/2016 |
0086301 PE |
ZHAO |
|
NOT APPLICABLE
|
|
LEGALIZE THE METAL STAIRS, INSTALL A NEW GAS BURNER FOR EXISTING BOILER, 2
|
|
Work on Floor(s): CEL,001,002,003,004,005
|
| 11/18/2010 |
220093431 |
01 |
A3 |
R PERMIT-ENTIRE |
11/22/2010 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF 60 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 06/01/2004 |
200859776 |
01 |
A2 |
X SIGNED OFF |
01/03/2005 |
0023793 RA |
LEE |
|
NOT APPLICABLE
|
|
REPLACE OF METAL DUCT AT REAR YARD. NO CHANGE IN USE OF EGRESS & OCCUPANCY
|
|
Work on Floor(s): 001 thru 006
|
| 04/24/1995 |
200322702 |
01 |
A2 |
R PERMIT-ENTIRE |
05/01/1995 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER. NO CHANGE IN EGRESS, OCCUPANCY
|
|
Work on Floor(s): CEL
|
| 02/01/1990 |
200025203 |
01 |
A2 |
R PERMIT-ENTIRE |
04/23/1990 |
0018968 RA |
OCASIO-R |
|
NOT APPLICABLE
|
|
INSTALLATION OF 3 GAS FIRED FRYERS,1 TRI PLE BOWL SINK.INSTALLATION OF
|
|
Work on Floor(s): 1ST
|