| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/19/1995 |
100734118 |
06 |
NB |
P APPROVED |
11/13/1995 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,7FL
|
| 05/09/1995 |
101036031 |
01 |
A2 |
R PERMIT-ENTIRE |
05/11/1995 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/27/1997 HEREWITH FILED IS FIRE ALARM APPLICATION FOR THE
|
|
Work on Floor(s): CEL 1 thru 7
|
| 12/09/1994 |
100952621 |
01 |
A3 |
R PERMIT-ENTIRE |
04/07/1995 |
|
BUTTNER |
|
NOT APPLICABLE
|
|
INSTALL SHED OF 96' ON W 84 ST DUR'G FAC ADE REPAIR. NO CHANGE TO USE EG
|
|
Work on Floor(s): GRO
|
| 01/26/1994 |
100734118 |
05 |
NB |
X SIGNED OFF |
03/25/1999 |
0088991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW STANDPIPE SYSTEM
|
|
Work on Floor(s): CEL,THR,7TH
|
| 01/21/1994 |
100734118 |
04 |
NB |
X SIGNED OFF |
03/25/1999 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER HEADS AS PER PLANS FILED HEREWITH
|
|
Work on Floor(s): CLR,THR,7TH
|
| 11/19/1993 |
100734118 |
03 |
NB |
X SIGNED OFF |
03/25/1999 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
HEREWITH FILED ARE BUILDING AND MECHANICAL WORK TYPES TO GO
|
|
Work on Floor(s): CEL,7FL
|
| 11/19/1993 |
100734118 |
02 |
NB |
X SIGNED OFF |
03/25/1999 |
0041866 PE |
SILMAN |
|
NOT APPLICABLE
|
|
HEREWITH FILED ARE STRUCTURAL DRAWING TO GO WITH PROPOSED NEW BUILDING
|
|
Work on Floor(s): CEL,7FL
|
| 11/10/1993 |
100734118 |
01 |
NB |
X SIGNED OFF |
03/25/1999 |
0000998 RA |
PISCIONE |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL,7FL
|
| 11/10/1993 |
100729197 |
01 |
A2 |
R PERMIT-ENTIRE |
11/23/1993 |
0000998 RA |
PISCIONE |
|
NOT APPLICABLE
|
|
THIS APPL. IS BEING FILED FOR SITE CLEAR ING GRADING & REMOVAL OF DEBRI
|
|
Work on Floor(s): CEL 1 thru 7
|