| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 08/20/2015 |
140393081 |
PR |
E LAA FILED |
08/20/2015 |
FSC 001038 |
MACKIN |
|
REMOVE AND REPLACE TWO (2) EXISTING SPRINKLER HEADS WITH TWO (2) NEW HEADS
|
|
Work on Floor(s): 006
|
| 10/12/2011 |
110558888 |
PR |
E LAA FILED |
12/09/2011 |
FSC 000728 |
MCMILLAN |
|
IN SUB-BASEMENT, TO REPLACE 4 OS AND Y VALVES, 60' OF 6" STANDPIPE PIPING
|
|
Work on Floor(s): SUB
|
| 06/22/2010 |
110512918 |
PR |
A LAA PREFILED |
06/22/2010 |
FSC 000728 |
MCMILLAN |
|
IN BAS REPLACE APPROX 92'X1 1/2", 17'X3/4" & 17'X1 1/4" SPRINKLER PIPING &
|
|
Work on Floor(s): BAS
|
| 05/26/2009 |
110267791 |
PR |
E LAA FILED |
05/26/2009 |
FSC 000728 |
MCMILLAN |
|
IN BASEMENT,TO REPLACE APPROX.92'OF 1 1/2",17'OF 1",17'OF 3/4" AND
|
|
Work on Floor(s): BAS
|