| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/03/2023 |
140940338 |
02 |
A3 |
P APPROVED |
07/10/2023 |
0089438 PE |
SAAVEDRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 07/03/2023 |
140682508 |
02 |
A3 |
P APPROVED |
07/10/2023 |
0089438 PE |
SAAVEDRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 07/03/2023 |
140827639 |
02 |
A3 |
P APPROVED |
07/03/2023 |
0089438 PE |
SAAVEDRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 05/30/2023 |
140343590 |
06 |
A2 |
P APPROVED |
06/07/2023 |
|
ETTINGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 05/18/2023 |
121186518 |
15 |
NB |
P APPROVED |
06/07/2023 |
0060293 PE |
ETTINGER |
|
GRANTED 03/13/2015
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,MEZ,PT1,PT3,ROF 001 thru 032
|
| 03/09/2023 |
121186518 |
14 |
NB |
P APPROVED |
03/21/2023 |
0060293 PE |
ETTINGER |
|
GRANTED 03/13/2015
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,MEZ,ROF 001 thru 031
|
| 01/11/2023 |
121186518 |
13 |
NB |
P APPROVED |
01/12/2023 |
|
O'HARA |
|
GRANTED 03/13/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 08/05/2022 |
121186518 |
12 |
NB |
P APPROVED |
01/06/2023 |
|
O'HARA |
|
GRANTED 03/13/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 05/14/2021 |
121186518 |
11 |
NB |
P APPROVED |
06/17/2021 |
|
O'HARA |
|
GRANTED 03/13/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 01/13/2021 |
140343590 |
05 |
A2 |
P APPROVED |
01/14/2021 |
|
ETTINGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 12/11/2020 |
140343590 |
04 |
A2 |
P APPROVED |
12/18/2020 |
|
ETTINGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 10/15/2020 |
140966480 |
01 |
A3 |
H P/E IN PROCESS |
10/15/2020 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 01/13/2021 INSTALLATION OF SUSPENDED SCAFFOLD FILED HEREWITHI
|
|
Work on Floor(s): ROF
|
| 08/20/2020 |
140940338 |
01 |
A3 |
X SIGNED OFF |
07/12/2023 |
0089438 PE |
SAAVEDRA |
|
NOT APPLICABLE
|
|
USE OF EXISTING RIGGING PLATFORMS AND DAVIT SYSTEM. NO CHANGE TO USE, EGRE
|
|
Work on Floor(s): ROF
|
| 12/24/2019 |
140882043 |
01 |
A3 |
X SIGNED OFF |
11/12/2021 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS. TEMPORARY
|
|
Work on Floor(s): OSP
|
| 12/16/2019 |
123592914 |
01 |
A2 |
X SIGNED OFF |
11/04/2020 |
0078527 PE |
SHAFEI |
|
NOT APPLICABLE
|
|
INSTALL (1) NEW GAS FIRED FIREPLACE. ALL STRUCTURAL DETAILS, SUPPORTS AND
|
|
Work on Floor(s): 001
|
| 12/12/2019 |
121186518 |
10 |
NB |
P APPROVED |
01/13/2020 |
|
O'HARA |
|
GRANTED 03/13/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 09/24/2019 |
122758676 |
02 |
A2 |
P APPROVED |
04/23/2020 |
0060293 PE |
ETTINGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DET
|
|
Work on Floor(s): CEL,PT1,PT2,PT3,ROF 001 thru 032
|
| 09/16/2019 |
140869139 |
01 |
A3 |
X SIGNED OFF |
07/01/2020 |
0079601 PE |
MC ERLEA |
|
NOT APPLICABLE
|
|
TEMPORARY SHORING AS PER DRAWINGS. TEMPORARY SHORING SHALL COMPLY WITH CHA
|
|
Work on Floor(s): 011,012
|
| 09/04/2019 |
140867587 |
01 |
A2 |
X SIGNED OFF |
01/24/2023 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
INSTALLATION AND USE OF MINI CRANE AS PER PLANS FILED HEREWITH. NO CHANGE
|
|
Work on Floor(s): 030
|
| 05/13/2019 |
123902410 |
01 |
A2 |
R PERMIT-ENTIRE |
11/04/2019 |
0029753 RA |
DIAZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/27/2021 THIS APPLICATION IS FILED FOR TEMPORARY USE PERMI
|
|
Work on Floor(s): 003,012
|
| 04/18/2019 |
123737885 |
01 |
A3 |
X SIGNED OFF |
05/22/2023 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
TENANT PROTECTION PLAN FILED IN CONJUNCTION WITH NB# 121186518
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 04/08/2019 |
123654517 |
01 |
A2 |
X SIGNED OFF |
02/10/2023 |
0060293 PE |
ETTINGER |
|
NOT APPLICABLE
|
|
INSTALL NEW BOILER (S) IN CONJUNCTION WITH NB 121186518
|
|
Work on Floor(s): 014
|
| 04/04/2019 |
140841301 |
01 |
A3 |
X SIGNED OFF |
07/02/2020 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER DRAWINGS (DEBRIS NETT
|
|
Work on Floor(s): OSP
|
| 03/26/2019 |
123707408 |
01 |
A3 |
P APPROVED |
06/22/2020 |
0025215 RA |
O'HARA |
|
NOT APPLICABLE
|
|
FIRE PROTECTION PLAN_FILED IN CONJUCTION WITH NB #121186618
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 03/25/2019 |
121205016 |
01 |
SC |
U COMPLETED |
04/18/2019 |
0025215 RA |
O'HARA |
|
NOT APPLICABLE
|
|
THIS IS A NO WORK APPLICATION TO SUBDIVIDE TAX LOT 37 INTO 49 CONDO LOTS,
|
|
Work on Floor(s): CEL,M14,ROF 001 thru 032
|
| 03/22/2019 |
140343590 |
03 |
A2 |
P APPROVED |
04/08/2019 |
|
ETTINGER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 03/21/2019 |
121186518 |
09 |
NB |
P APPROVED |
04/03/2019 |
|
O'HARA |
|
GRANTED 03/13/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,PT1,PT2,PT3 001 thru 032
|
| 01/17/2019 |
140827639 |
01 |
A3 |
X SIGNED OFF |
07/10/2023 |
0089438 PE |
SAAVEDRA |
|
NOT APPLICABLE
|
|
INSTALLATION OF EASY SCALE HANGING SYSTEM AS PER PLANS. NO CHANGE IN USE,
|
|
Work on Floor(s): OSP
|
| 11/02/2018 |
140816026 |
01 |
A3 |
X SIGNED OFF |
07/02/2020 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CHAPTER
|
|
Work on Floor(s): 014
|
| 10/29/2018 |
140814983 |
01 |
A3 |
X SIGNED OFF |
07/02/2020 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CHAPTER
|
|
Work on Floor(s): 029
|
| 09/27/2018 |
140806885 |
01 |
A3 |
X SIGNED OFF |
07/02/2020 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CHAPTER
|
|
Work on Floor(s): 014
|
| 06/01/2018 |
121186518 |
08 |
NB |
P APPROVED |
08/15/2018 |
|
O'HARA |
|
GRANTED 03/13/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,M14,ROF 001 thru 032
|
| 06/01/2018 |
140771083 |
01 |
A3 |
X SIGNED OFF |
07/02/2020 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CHAPTER
|
|
Work on Floor(s): 013
|
| 05/18/2018 |
140767695 |
01 |
A3 |
X SIGNED OFF |
07/02/2020 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SHORING AS PER DRAWINGS. SHORING SHALL COMPLY WITH CHAPTER
|
|
Work on Floor(s): 014
|
| 05/16/2018 |
140766598 |
01 |
A3 |
X SIGNED OFF |
11/15/2021 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY ROOF PROTECTION AT THE ADJACENT BUILDING DURING
|
|
Work on Floor(s): OSP
|
| 03/20/2018 |
123070149 |
02 |
A3 |
F ASSIGNED TO P/E |
03/30/2018 |
|
AMMIANO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/27/2023
|
|
Work on Floor(s): 013 thru 030
|
| 10/12/2017 |
123005327 |
04 |
A3 |
P APPROVED |
11/03/2017 |
|
BLINN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 08/16/2017 |
140682508 |
01 |
A3 |
X SIGNED OFF |
07/12/2023 |
0089438 PE |
SAAVEDRA |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF EASY SCALE SCAFFOLD AS PER PLANS. NO CHANGE IN US
|
|
Work on Floor(s): OSP
|
| 08/11/2017 |
123005327 |
03 |
A3 |
P APPROVED |
08/18/2017 |
|
BLINN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/01/2017 |
121186518 |
07 |
NB |
P APPROVED |
06/13/2017 |
|
O'HARA |
|
GRANTED 03/13/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,MEZ,ROF 001 thru 031
|