 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/01/2019 |
121187429 |
10 |
NB |
P APPROVED |
12/16/2019 |
|
KAUFMAN |
|
AMENDED 09/21/2015
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 07/26/2019 |
140321195 |
03 |
A2 |
P APPROVED |
08/08/2019 |
|
KAUFMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 03/26/2019 |
140417378 |
02 |
A2 |
G PAA FEE DUE |
03/26/2019 |
|
KAUFMAN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/26/2019
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 02/13/2019 |
121187429 |
09 |
NB |
P APPROVED |
06/21/2019 |
|
KAUFMAN |
|
AMENDED 09/21/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 021
|
| 12/14/2018 |
140321195 |
02 |
A2 |
P APPROVED |
04/24/2019 |
|
KAUFMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 HEREBY FILING FOR NEW SPRINKLER/STANDPIPE S
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 11/20/2017 |
140718187 |
01 |
A3 |
X SIGNED OFF |
05/01/2019 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
INSTALLATION OF ROOF PROTECTION & OVERHEAD PROTECTION WITH NETTING AS PER
|
|
Work on Floor(s): OSP
|
| 11/16/2017 |
123242348 |
01 |
A2 |
X SIGNED OFF |
08/16/2019 |
0017030 RA |
KAUFMAN |
|
NOT APPLICABLE
|
|
HEREBY FILING FOR TEMPORARY STANDPIPE ALARM SYSTEM AS PER LOCAL LAW 63 & 6
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 11/15/2017 |
140716740 |
01 |
A3 |
H P/E IN PROCESS |
11/15/2017 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 01/14/2018 INSTALLATION OF ROOF PROTECTION & OVERHEAD PROTECT
|
|
Work on Floor(s): OSP
|
| 09/18/2017 |
140694602 |
01 |
A2 |
X SIGNED OFF |
05/15/2019 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
INSTALLATION OF BRIDGE BRACKET AS PER PLAN FILED HEREWITH. NO CHANGE IN US
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 09/11/2017 |
140692819 |
01 |
A3 |
X SIGNED OFF |
09/30/2019 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY ROOF PROTECTION AS PER PLAN SUBMITTED. WORK SHAL
|
|
Work on Floor(s): OSP
|
| 08/30/2017 |
140669275 |
02 |
A3 |
P APPROVED |
09/01/2017 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF ALIMAK SCANDO 20/30 4,400 L
|
|
Work on Floor(s): OSP
|
| 07/31/2017 |
140671057 |
01 |
A3 |
X SIGNED OFF |
04/15/2019 |
0075541 PE |
LOKE |
|
NOT APPLICABLE
|
|
INSTALLATION AND USE OF SCAFFOLD AS PER PLANS SUBMITTED.SCAFFOLD SHALL COM
|
|
Work on Floor(s): 001 thru 022
|
| 07/17/2017 |
140669275 |
01 |
A3 |
X SIGNED OFF |
09/26/2019 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF ALIMAK SCANDO 20/30 4,400 LBS SINGLE CAGE PERSONNEL & MATE
|
|
Work on Floor(s): OSP
|
| 03/27/2017 |
140621842 |
01 |
A3 |
X SIGNED OFF |
09/24/2019 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY SIDEWALK SHED IN CONJUNCTION NB CONSTRUCTION AS
|
|
Work on Floor(s): OSP
|
| 06/13/2016 |
120995165 |
02 |
A3 |
D A/P ENTIRE |
07/13/2016 |
|
KAUFMAN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/10/2019
|
|
Work on Floor(s): OSP
|
| 02/02/2016 |
122677013 |
01 |
A2 |
X SIGNED OFF |
07/26/2019 |
0017030 RA |
KAUFMAN |
|
NOT APPLICABLE
|
|
HEREBY FILING NEW INSTALLATION OF MANUAL & AUTOMATIC SMOKE/HEAT/CO DETECTI
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 11/02/2015 |
140417378 |
01 |
A2 |
P APPROVED |
03/03/2016 |
0017030 RA |
KAUFMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/26/2019 HEREBY FILING FOR NEW BOILER SYSTEMS IN CONJUNCTI
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 09/30/2015 |
140405853 |
01 |
A2 |
X SIGNED OFF |
09/04/2019 |
0017030 RA |
KAUFMAN |
|
NOT APPLICABLE
|
|
HEREBY FILING EMERGENCY GENERATOR IN CONJUNCTION WITH NEW BUILDING # 12118
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 09/30/2015 |
140405826 |
01 |
A2 |
F ASSIGNED TO P/E |
10/02/2015 |
0017030 RA |
KAUFMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/13/2015 HEREBY FILING EMERGENCY GENERATOR IN CONJUNCTION
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 09/16/2015 |
140403481 |
01 |
A2 |
D A/P ENTIRE |
09/16/2015 |
0017030 RA |
KAUFMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/22/2015 HEREBY FILING FOR NEW BOILER SYSTEM IN CONJUNCTIO
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 07/20/2015 |
121187429 |
08 |
NB |
P APPROVED |
07/21/2015 |
0060005 PE |
WEXLER |
|
AMENDED 09/21/2015
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 021
|
| 05/29/2015 |
121187429 |
07 |
NB |
P APPROVED |
09/30/2015 |
|
KAUFMAN |
|
AMENDED 09/21/2015
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,ROF 001 thru 021
|
| 05/28/2015 |
121187429 |
06 |
NB |
P APPROVED |
09/30/2015 |
|
KAUFMAN |
|
AMENDED 09/21/2015
|
|
POST APPROVAL AMENDMENT FOR 01 HEREBY FILING FOR NEW 22 STORY HOTEL BOUTIQ
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 03/16/2015 |
140321195 |
01 |
A2 |
X SIGNED OFF |
08/20/2019 |
0017030 RA |
KAUFMAN |
|
NOT APPLICABLE
|
|
HEREBY FILING FOR NEW SPRINKLER/STANDPIPE SYSTEM. THIS FILINF IS IN CONJUN
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 03/12/2015 |
121187429 |
05 |
NB |
P APPROVED |
03/24/2015 |
0060005 PE |
WEXLER |
|
AMENDED 09/21/2015
|
|
POST APPROVAL AMENDMENT FOR 03 HEREBY FILING FOR RELATED STRUCTURAL/SOE WO
|
|
Work on Floor(s): CEL,ROF 001 thru 021
|
| 02/05/2015 |
140294811 |
01 |
A2 |
D A/P ENTIRE |
02/05/2015 |
0017030 RA |
KAUFMAN |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 03/02/2015 HEREBY FILING FOR SPRINKLER/STANDPIPE & STANDPIPE
|
|
Work on Floor(s): CEL,ROF 001 thru 021
|
| 01/12/2015 |
121187429 |
04 |
NB |
P APPROVED |
03/16/2015 |
|
KAUFMAN |
|
AMENDED 09/21/2015
|
|
POST APPROVAL AMENDMENT FOR 01 SEE SECTION 24.
|
|
Work on Floor(s): CEL,ROF 001 thru 021
|
| 11/10/2014 |
121187429 |
03 |
NB |
X SIGNED OFF |
03/27/2020 |
0060005 PE |
WEXLER |
|
AMENDED 09/21/2015
|
|
HEREBY FILING FOR RELATED STRUCTURAL/SOE WORK FOR NB.
|
|
Work on Floor(s): CEL,ROF 001 thru 021
|
| 11/10/2014 |
121187429 |
02 |
NB |
X SIGNED OFF |
03/27/2020 |
0017030 RA |
KAUFMAN |
|
AMENDED 09/21/2015
|
|
HEREBY FILING MECHANICAL & PLUMBING WORK FOR NEW BUILDING
|
|
Work on Floor(s): CEL,ROF 001 thru 021
|
| 11/06/2014 |
121187429 |
01 |
NB |
X SIGNED OFF |
03/27/2020 |
0017030 RA |
KAUFMAN |
|
AMENDED 09/21/2015
|
|
HEREBY FILING FOR NEW 22 STORY HOTEL BOUTIQUE
|
|
Work on Floor(s): CEL,ROF 001 thru 022
|
| 02/11/2014 |
121919843 |
01 |
A3 |
J P/E DISAPPROVED |
02/11/2014 |
0081273 PE |
MORRIS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/02/2019 PROPOSED SHORING EXCAVATION AND UNDERPINNING SUPP
|
|
Work on Floor(s): OSP
|
| 05/13/2013 |
121617152 |
01 |
DM |
X SIGNED OFF |
12/18/2013 |
0081742 PE |
BENABDEL |
|
NOT APPLICABLE
|
|
DEMOLITION OF EXISTING 5 STORY BUILDING AS PER PLAN. NO CHANGE OF USE OR
|
|
Work on Floor(s): CEL,RF 001 thru 005
|
| 09/10/2012 |
121371425 |
01 |
A2 |
R PERMIT-ENTIRE |
10/19/2012 |
0071083 PE |
SALAM |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/13/2013 PARTIAL DEMOLITION OF EXISTING 2 STORY ATTACHED B
|
|
Work on Floor(s): CEL,001,002,RF
|
| 08/31/2012 |
121362328 |
01 |
DM |
E AP-NPE |
08/31/2012 |
0071083 PE |
SALAM |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/12/2012 PARTIAL DEMOLITION OF EXISTING 2 STORY ATTACHED B
|
|
Work on Floor(s): CEL,001,002,RF
|
| 08/31/2012 |
121362337 |
01 |
DM |
E AP-NPE |
08/31/2012 |
0071083 PE |
SALAM |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/24/2013 DEMOLITION OF EXISTING 5 STORY BUILDING.
|
|
Work on Floor(s): CEL,RF 001 thru 005
|
| 07/27/2012 |
121165773 |
01 |
A3 |
X SIGNED OFF |
01/15/2014 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF A DEBRIS CHUTE AS PER DRAWINGS. DEBRIS CHUTE SHALL COMPLY
|
|
Work on Floor(s): OSP
|
| 07/27/2012 |
121165782 |
01 |
A3 |
X SIGNED OFF |
01/15/2014 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPT
|
|
Work on Floor(s): OSP
|
| 07/20/2012 |
121154954 |
01 |
A3 |
X SIGNED OFF |
12/31/2013 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF PLYWOOD FENCE, AS PER DRAWINGS.PLYWOOD FENCE SHALL COMPLY
|
|
Work on Floor(s): OSP
|
| 07/20/2012 |
121154945 |
01 |
A3 |
X SIGNED OFF |
01/17/2014 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
INSTALLATION OF 35 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 07/16/2012 |
121152448 |
01 |
A2 |
X SIGNED OFF |
10/18/2012 |
0071083 PE |
SALAM |
|
NOT APPLICABLE
|
|
REMOVAL OF INTERIOR NON-BEARING PARTITIONS AS PER PLANS.
|
|
Work on Floor(s): CEL,001,002,003,004,005
|