| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/15/2024 |
121329053 |
13 |
NB |
P APPROVED |
04/19/2024 |
|
KREVLIN |
|
AMENDED 05/12/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 08/02/2021 |
121329053 |
12 |
NB |
P APPROVED |
08/27/2021 |
|
KREVLIN |
|
AMENDED 05/12/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 06/03/2021 |
121329053 |
11 |
NB |
P APPROVED |
06/17/2021 |
|
KREVLIN |
|
AMENDED 05/12/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 10/09/2020 |
121329053 |
10 |
NB |
P APPROVED |
10/29/2020 |
|
KREVLIN |
|
AMENDED 05/12/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 10/08/2020 |
140963928 |
01 |
A2 |
P APPROVED |
10/08/2020 |
0020635 RA |
SCHMERZL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/19/2024 FILING TENANT PROTECTION PLAN IN CONJUNTION WITH
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 09/15/2020 |
123431223 |
01 |
SC |
U COMPLETED |
09/22/2020 |
0015406 RA |
KREVLIN |
|
NOT APPLICABLE
|
|
SUBDIVISION OF CONDOMINIUM FILED FOR NEW BUILDING FILED UNDER DOB # 121329
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 02/04/2020 |
123816852 |
01 |
A2 |
R PERMIT-ENTIRE |
03/17/2020 |
0020635 RA |
SCHMERZL |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/15/2024 THIS APPLICATION IS FILED FOR A TEMPORARY USE PER
|
|
Work on Floor(s): 003
|
| 03/05/2019 |
140835327 |
01 |
A2 |
X SIGNED OFF |
03/15/2024 |
0090287 PE |
LOMBARDO |
|
NOT APPLICABLE
|
|
INSTALLATION OF MINI CRANE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, E
|
|
Work on Floor(s): ROF 002 thru 009
|
| 10/15/2018 |
121329053 |
09 |
NB |
P APPROVED |
10/26/2018 |
|
KREVLIN |
|
AMENDED 05/12/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 02/08/2018 |
123133929 |
01 |
A2 |
X SIGNED OFF |
04/29/2021 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
FILING FOR INSTALLATION OF SPRINKLER-STANDPIPE SYSTEM ON FLOORS: CELLAR, 1
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 01/26/2018 |
123203283 |
02 |
A3 |
P APPROVED |
01/26/2018 |
|
ACAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 01/17/2018 |
140732036 |
01 |
A2 |
D A/P ENTIRE |
01/17/2018 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/12/2018 FILING FOR INSTALLATION OF SPRINKLER-STANDPIPE SY
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 12/07/2017 |
140722939 |
01 |
A2 |
X SIGNED OFF |
06/09/2023 |
0088950 PE |
ACAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF A TEMPORARY OVERHEAD/ROOF PROTECTION AS PER PLANS IN CONJU
|
|
Work on Floor(s): OSP,ROF
|
| 12/06/2017 |
123277140 |
01 |
A2 |
X SIGNED OFF |
10/20/2020 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
HEREWITH FILED INSTALLATION OF TEMPORARY STANDPIPE SYSTEM IN CONJUNCTION W
|
|
Work on Floor(s): CEL,ROF 001 thru 008
|
| 12/01/2017 |
123203283 |
01 |
A3 |
X SIGNED OFF |
12/03/2020 |
0088950 PE |
ACAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF A PERSONNEL/MATERIAL HOIST AS PER PLANS IN CONJUNCTION WIT
|
|
Work on Floor(s): OSP
|
| 10/25/2017 |
121329053 |
08 |
NB |
P APPROVED |
10/02/2020 |
0073548 PE |
GLICKMAN |
|
AMENDED 05/12/2017
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 04/20/2017 |
123088425 |
01 |
A2 |
X SIGNED OFF |
03/27/2024 |
0068504 PE |
WALTERS |
|
NOT APPLICABLE
|
|
JOB BEING FILED IN CONJUCTION WITH NB# 121329053, PROPOSED BRACING OF ADJA
|
|
Work on Floor(s): OSP
|
| 04/20/2017 |
121329053 |
07 |
NB |
P APPROVED |
04/11/2018 |
|
KREVLIN |
|
AMENDED 05/12/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 11/01/2016 |
122931845 |
01 |
A3 |
X SIGNED OFF |
06/26/2023 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF A CONSTRUCTION FENCE AS PER PLANS DURING NEW BUILDING
|
|
Work on Floor(s): 001
|
| 10/11/2016 |
121329053 |
06 |
NB |
P APPROVED |
11/02/2016 |
|
KREVLIN |
|
AMENDED 05/12/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 07/11/2016 |
121329053 |
05 |
NB |
P APPROVED |
09/30/2016 |
|
KREVLIN |
|
AMENDED 05/12/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 03/21/2016 |
122699259 |
01 |
A3 |
P APPROVED |
03/23/2016 |
0016554 RA |
ZENREICH |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/25/2018 FILING FOR FENCE INSTALLATION IN ASSOCIATION WITH
|
|
Work on Floor(s): GRD
|
| 03/21/2016 |
140452953 |
01 |
A3 |
J P/E DISAPPROVED |
04/30/2020 |
0015406 RA |
KREVLIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/11/2023 FILING CURB CUT IN ASSOCIATION WITH NB #121329053
|
|
Work on Floor(s): OSP
|
| 02/04/2016 |
140455479 |
01 |
A3 |
X SIGNED OFF |
01/28/2025 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|
| 11/19/2015 |
140410222 |
01 |
A2 |
J P/E DISAPPROVED |
02/19/2016 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/25/2018 FILING TO SHOW INSTALLATION OF A NEW SPRINKLER AN
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 10/30/2015 |
122544620 |
01 |
A2 |
X SIGNED OFF |
04/01/2021 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
FILING FOR INSTALLATION OF AUTOMATIC SMOKE/HEAT DETECTION/SPRINKLER ALARM/
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 10/29/2015 |
140400974 |
01 |
A3 |
X SIGNED OFF |
06/27/2023 |
0015406 RA |
KREVLIN |
|
NOT APPLICABLE
|
|
BUILDERS PAVEMENT PLAN FILED IN CONJUNCTION WITH NEW BUILDING #121329053
|
|
Work on Floor(s): GRD
|
| 09/01/2015 |
122524385 |
01 |
DM |
X SIGNED OFF |
09/06/2016 |
0087797 PE |
SANTIAGO |
|
NOT APPLICABLE
|
|
FULL DEMOLITION OF 2 STORY BUILDING.
|
| 02/04/2015 |
121329053 |
04 |
NB |
R PERMIT-ENTIRE |
12/23/2016 |
0084812 PE |
PAPP |
|
AMENDED 05/12/2017
|
|
FILING FOR SUPPORT OF EXCAVATION WORK IN CONJUNCTION WITH DOC.1. ALL WORK
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 08/26/2013 |
121329053 |
03 |
NB |
R PERMIT-ENTIRE |
06/14/2017 |
0073548 PE |
GLICKMAN |
|
AMENDED 05/12/2017
|
|
FILING PLUMBING AND MECHANICAL SUBSEQUENT DOCUMENT FOR CONSTRUCTION OF 9 S
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 08/13/2013 |
121329053 |
02 |
NB |
R PERMIT-ENTIRE |
12/23/2016 |
0060728 PE |
SMILOW |
|
AMENDED 05/12/2017
|
|
FILING STRUCTURAL SUBSEQUENT DOCUMENT FOR CONSTRUCTION OF 9 STORY NEW BUIL
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 05/17/2013 |
121329053 |
01 |
NB |
R PERMIT-ENTIRE |
12/16/2020 |
0015406 RA |
KREVLIN |
|
AMENDED 05/12/2017
|
|
CONSTRUCTION OF A NINE (9) STORY NEW BUILDING.
|
|
Work on Floor(s): CEL,ROF 001 thru 009
|
| 12/23/2011 |
120416727 |
04 |
A2 |
P APPROVED |
01/04/2012 |
|
JACOBSON |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/23/2018
|
|
Work on Floor(s): 001,0RF
|
| 09/03/2010 |
120416727 |
03 |
A2 |
P APPROVED |
10/14/2011 |
|
JACOBSON |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/23/2018
|
|
Work on Floor(s): 001,0RF
|
| 09/01/2010 |
120416727 |
02 |
A2 |
P APPROVED |
09/01/2010 |
|
JACOBSON |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/23/2018
|
|
Work on Floor(s): 001,0RF
|
| 07/19/2010 |
120416727 |
01 |
A2 |
R PERMIT-ENTIRE |
10/14/2011 |
0017885 RA |
JACOBSON |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/23/2018 SCOPE OF WORK AT 1ST FLOOR FOR MINOR PARTITION WO
|
|
Work on Floor(s): 001,0RF
|
|
120299006 |
01 |
SG |
A PRE-FILED |
03/19/2010 |
0014883 RA |
BENIC |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/25/2018 TO INSTALL A WALL BUS. ACC. SIGN. WORDING: PAT LA
|
|
Work on Floor(s): 1ST 001 thru 002
|
|
120298917 |
01 |
SG |
A PRE-FILED |
03/19/2010 |
0014883 RA |
BENIC |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/25/2018 TO INSTALL A WALL BUS. ACC. SIGN. WORDING: PAT LA
|
|
Work on Floor(s): 1ST 001 thru 002
|
|
120298926 |
01 |
SG |
A PRE-FILED |
03/19/2010 |
0014883 RA |
BENIC |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/25/2018 TO INSTALL A WALL BUS. ACC. SIGN. WORDING: PAT LA
|
|
Work on Floor(s): 1ST 001 thru 002
|
| 11/16/2009 |
120203109 |
01 |
A3 |
J P/E DISAPPROVED |
11/25/2009 |
0014883 RA |
BENIC |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/26/2010 TO INSTALL A WALL STRUCTURE FOR AN ADVERTISING SI
|
|
Work on Floor(s): 1ST 001 thru 002
|