| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/11/2017 |
122370567 |
02 |
A3 |
P APPROVED |
12/12/2017 |
|
ZDANCEWI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/13/2017 |
140652764 |
01 |
A3 |
X SIGNED OFF |
08/11/2020 |
0087797 PE |
HELMAN |
|
NOT APPLICABLE
|
|
FILING FOR MECHANICAL EQUIPMENT USE PERMIT IN CONJUNCTION WITH INTERIOR RE
|
|
Work on Floor(s): 001 thru 004
|
| 02/13/2017 |
122563387 |
02 |
A2 |
P APPROVED |
03/01/2017 |
|
CAMBOURA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 004
|
| 08/29/2016 |
120643330 |
10 |
NB |
P APPROVED |
04/10/2017 |
0032709 RA |
ZHITNIK |
|
GRANTED 09/30/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 016
|
| 02/29/2016 |
120643330 |
09 |
NB |
P APPROVED |
03/09/2016 |
|
ZHITNIK |
|
GRANTED 09/30/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 016
|
| 02/29/2016 |
120643330 |
08 |
NB |
P APPROVED |
03/09/2016 |
0060234 PE |
CAMBOURA |
|
GRANTED 09/30/2011
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001 thru 016
|
| 10/23/2015 |
122563387 |
01 |
A2 |
R PERMIT-ENTIRE |
11/21/2018 |
0060234 PE |
CAMBOURA |
|
NOT APPLICABLE
|
|
PROPOSE TO REPAIR EXISTING CONCRETE WORKS ON SOUTH WALLS; TEMPORARY SHORIN
|
|
Work on Floor(s): CEL 001 thru 004
|
| 05/05/2015 |
120643330 |
07 |
NB |
P APPROVED |
06/17/2015 |
0060234 PE |
CAMBOURA |
|
GRANTED 09/30/2011
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001 thru 016
|
| 04/16/2015 |
122370567 |
01 |
A3 |
X SIGNED OFF |
06/18/2018 |
0090372 PE |
ZDANCEWI |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLANS. WORK SHALL COMPLY WITH 2014 BU
|
|
Work on Floor(s): OSP
|
| 09/09/2013 |
121774339 |
01 |
A2 |
J P/E DISAPPROVED |
01/13/2014 |
0071681 PE |
TUCCI |
|
NOT APPLICABLE
|
|
INSTALLATION OF A MANUAL & AUTOMATIC SMOKE/HEAT DETECTION & SPRINKLER FIRE
|
|
Work on Floor(s): CEL,BLK 001 thru 016
|
| 12/21/2012 |
121465253 |
01 |
A3 |
R PERMIT-ENTIRE |
12/21/2012 |
0086757 PE |
PERDEK |
Y |
NOT APPLICABLE
|
|
INSTALLATION OF A SINGLE 6000 LB CAPACITY PERSONNEL/MATERIAL HOIST DURING
|
|
Work on Floor(s): OSP
|
| 03/02/2012 |
120925133 |
02 |
A3 |
P APPROVED |
03/05/2012 |
|
PITERA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 01/13/2012 |
120948813 |
01 |
A2 |
R PERMIT-ENTIRE |
01/19/2012 |
0031442 PE |
SCHWARTZ |
|
NOT APPLICABLE
|
|
NSTALLATION OF TEMPORARY DRY STANDPIPE SYSTEM AS SHOWN ON DRAWINGS AS SHOW
|
|
Work on Floor(s): CEL,ROF 001 thru 016
|
| 12/14/2011 |
120925133 |
01 |
A3 |
X SIGNED OFF |
02/01/2016 |
0072827 PE |
PITERA |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF APPROXIMATELY 58 L.F.
|
|
Work on Floor(s): OSP
|
| 09/30/2011 |
120643330 |
06 |
NB |
R PERMIT-ENTIRE |
02/09/2012 |
0060234 PE |
CAMBOURA |
|
GRANTED 09/30/2011
|
|
SUBSEQUENT FILING OF STRUCTURAL WORK TYPE
|
|
Work on Floor(s): 001 thru 016
|
| 09/30/2011 |
120643330 |
05 |
NB |
R PERMIT-ENTIRE |
05/01/2012 |
0071681 PE |
TUCCI |
|
GRANTED 09/30/2011
|
|
SUBSEQUENT FILING OF MECHANICAL,PLUMBING AND SPRINKLER WORK TYPES
|
|
Work on Floor(s): 001 thru 016
|
| 08/23/2011 |
120643330 |
02 |
NB |
R PERMIT-ENTIRE |
02/09/2012 |
0060234 PE |
CAMBOURA |
|
GRANTED 09/30/2011
|
|
SUBSEQUENT FILING FOR STRUCTURAL WORK TYPE
|
|
Work on Floor(s): 001 thru 016
|
| 03/25/2011 |
120643330 |
01 |
NB |
R PERMIT-ENTIRE |
04/17/2019 |
0032709 RA |
ZHITNIK |
|
GRANTED 09/30/2011
|
|
NEW MIXED USE 16 STORY BUILDING
|
|
Work on Floor(s): CEL,ROF 001 thru 016
|
| 12/29/2010 |
103058085 |
03 |
NB |
D A/P ENTIRE |
01/03/2011 |
|
ZHITNIK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 017
|
| 12/09/2009 |
120220910 |
01 |
A2 |
J P/E DISAPPROVED |
12/22/2009 |
0071681 PE |
TUCCI |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER/STANDPIPE SYSTEM IN CONJUNCTION WITH NB#10305808
|
|
Work on Floor(s): CEL 001 thru 017
|
| 04/21/2009 |
120017123 |
01 |
A2 |
P APPROVED |
05/19/2009 |
0060234 PE |
CAMBOURA |
|
NOT APPLICABLE
|
|
EXCAVATION INCLUDING SHORING AND UNDERPINNING, AND INSTALLATION OF FOUNDAT
|
|
Work on Floor(s): CEL,OSP
|
| 09/24/2008 |
110254830 |
01 |
DM |
X SIGNED OFF |
01/30/2009 |
OT |
CARROLL |
|
NOT APPLICABLE
|
|
DEMOLITION OF STRUCTURE.
|
|
Work on Floor(s): 001
|
| 06/18/2007 |
103058085 |
02 |
NB |
P APPROVED |
04/11/2008 |
0027477 RA |
DONSKOY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 017
|
| 06/05/2007 |
103058085 |
01 |
NB |
P APPROVED |
06/05/2007 |
0032709 RA |
ZHITNIK |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL 001 thru 017
|
| 12/27/2006 |
104647269 |
01 |
A3 |
R PERMIT-ENTIRE |
03/28/2008 |
0060813 PE |
GENNARO |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR BUILDERS PAVING PLAN - TOTAL FRONTAGE ON 3RD AVENUE
|
| 10/01/2003 |
103449234 |
01 |
A3 |
R PERMIT-ENTIRE |
10/21/2003 |
0066311 PE |
HONG |
|
NOT APPLICABLE
|
|
BUILDER'S PAVEMENT PLAN
|
|
Work on Floor(s): CEL 001 thru 016
|
| 05/22/2003 |
103465126 |
01 |
DM |
E AP-NPE |
05/22/2003 |
0066311 PE |
Harry |
|
NOT APPLICABLE
|
|
Work on Floor(s): 001
|
| 03/15/1993 |
100588570 |
01 |
A1 |
R PERMIT-ENTIRE |
06/28/1993 |
0014275 RA |
PICHARDO |
|
NOT APPLICABLE
|
|
OBTAIN NEW C OF O TO CHANGE FROM THEATER TO RETAIL STORE.
|
|
Work on Floor(s): 1ST
|
|
120643330 |
04 |
NB |
A PRE-FILED |
08/16/2011 |
0071681 PE |
TUCCI |
|
GRANTED 09/30/2011
|
|
DOC WITHDRAWN 09/30/2011
|
|
Work on Floor(s): 001 thru 016
|
|
120643330 |
03 |
NB |
A PRE-FILED |
07/27/2011 |
0071681 PE |
TUCCI |
|
GRANTED 09/30/2011
|
|
DOC WITHDRAWN 09/30/2011
|
|
Work on Floor(s): 001 thru 016
|