Premises: 232 7 AVENUE MANHATTAN BIN: 1090490    Block: 773    Lot: 44

To start overview at new date, select Month:   Day:   Year:  

         

FILE DATE JOB # DOC # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT IN AUDIT ZONING APPROVAL
07/06/2026 140946234 02 A1 G PAA FEE DUE 07/06/2026 OJEYEMI NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 017

01/12/2022 123831372 02 A1 P APPROVED 01/18/2022 SEHIC NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 001

08/29/2020 140946234 01 A1 R PERMIT-ENTIRE 08/07/2025 0023388 RA OJEYEMI NOT APPLICABLE
 CHANGE OF USE AND OCCUPANCY OF SECOND THROUGH NINTH FLOOR APARTMENT UNITS,
 Work on Floor(s): CEL,ROF 001 thru 017

06/25/2020 123511360 03 A2 P APPROVED 01/14/2022 0029622 RA SEHIC NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,001

03/27/2020 123831372 01 A1 P APPROVED 06/01/2020 0029622 RA SEHIC NOT APPLICABLE
 THIS NO WORK ALTERATION TYPE I APPLICATION IS BEING FILED FOR CHANGE OF US
 Work on Floor(s): 001

03/21/2020 123511360 02 A2 P APPROVED 03/27/2020 SEHIC NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 THIS ALTERATION TYPE II APPLICATION IS BEIN
 Work on Floor(s): CEL,001

09/23/2019 123816228 01 A2 X SIGNED OFF 09/08/2023 0010556 RA TOSCANO NOT APPLICABLE
 INSTALLATION OF INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWIN
 Work on Floor(s): CEL,001

06/03/2019 121040729 08 NB P APPROVED 06/05/2019 SEHIC GRANTED 07/19/2012
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 017

12/14/2018 123511360 01 A2 X SIGNED OFF 04/03/2025 0029622 RA SEHIC NOT APPLICABLE
 THIS ALTERATION TYPE II APPLICATION IS BEING FILED FOR THE INTERIOR RENOVA
 Work on Floor(s): CEL,001

10/15/2018 121040729 07 NB P APPROVED 10/22/2018 SEHIC GRANTED 07/19/2012
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 017

09/18/2018 123581855 01 A3 X SIGNED OFF 10/25/2018 0029622 RA SEHIC NOT APPLICABLE
 THIS ALTERTION TYPE III APPLICATION IS BEING FILED IN CONJUNCTION WITH NB
 Work on Floor(s): CEL,ROF 001 thru 017

08/30/2018 121171935 05 A2 P APPROVED 09/19/2018 RINI III NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 016

08/15/2018 121760193 02 A2 P APPROVED 02/05/2019 RINI 111 NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF AUTOMATIC SMOKE/HEAT DETECT
 Work on Floor(s): CEL,ROF 001 thru 017

05/02/2018 121040729 06 NB P APPROVED 06/25/2018 SEHIC GRANTED 07/19/2012
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 017

03/28/2018 123426195 01 A3 X SIGNED OFF 09/27/2018 0029622 RA SEHIC NOT APPLICABLE
 INSTALLATION OF MARQUEE AT GROUND LEVEL. FILED IN CONJUNCTION WITH NB#
 Work on Floor(s): GRD

12/20/2017 121171935 04 A2 P APPROVED 12/28/2017 RINI III NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 016

08/10/2017 121040729 05 NB P APPROVED 10/06/2017 SEHIC GRANTED 07/19/2012
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 017

06/27/2017 121156015 02 A2 P APPROVED 07/28/2017 0067012 PE BECKER NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 017

06/16/2017 123059466 01 A3 X SIGNED OFF 08/08/2018 0089587 PE PHAGOO NOT APPLICABLE
 INSTALLATION OF TEMPORARY STORAGE PLATFORM AS PER DRAWINGS. TEMPORARY STOR
 Work on Floor(s): OSP

04/12/2017 122331404 02 A2 P APPROVED 04/27/2017 RINI III NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF,OSP 001 thru 017

03/09/2017 122160419 04 A3 P APPROVED 03/10/2017 UDDIN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

11/05/2016 122160428 04 A3 P APPROVED 11/09/2016 UDDIN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF 100 LINEAR FEET OF HEAVY DU
 Work on Floor(s): OSP

11/05/2016 140487257 02 A3 P APPROVED 11/09/2016 PHAGOO NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): 004 thru 016

07/22/2016 121040729 04 NB P APPROVED 08/22/2016 SEHIC GRANTED 07/19/2012
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 017

07/14/2016 122160419 03 A3 P APPROVED 07/18/2016 UDDIN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

06/20/2016 122764320 01 A3 X SIGNED OFF 08/10/2018 0079403 PE CLARKE NOT APPLICABLE
 INSTALLATION OF ROOF/OVERHEAD PROTECTION AT ADJACENT BUILDINGS DURING NEW
 Work on Floor(s): ROF

04/28/2016 122160428 03 A3 P APPROVED 04/29/2016 UDDIN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

04/26/2016 140487257 01 A3 X SIGNED OFF 05/22/2018 0089587 PE PHAGOO NOT APPLICABLE
 INSTALLATION OF DEBRIS NETTING AS PER DRAWINGS DURING NEW BUILDING CONSTRU
 Work on Floor(s): 004 thru 016

04/22/2016 140486855 01 A3 H P/E IN PROCESS 04/22/2016 0089587 PE PHAGOO NOT APPLICABLE
 JOB WITHDRAWN 04/22/2016 INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING N
 Work on Floor(s): 004 thru 016

04/22/2016 140486846 01 A3 H P/E IN PROCESS 04/22/2016 0089587 PE PHAGOO NOT APPLICABLE
 JOB WITHDRAWN 04/22/2016 INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING B
 Work on Floor(s): OSP

04/08/2016 140481084 01 A2 H P/E IN PROCESS 04/08/2016 0089587 PE PHAGOO NOT APPLICABLE
 JOB WITHDRAWN 04/22/2016 INSTALLATION OF DEBRIS NETTING AS PER DRAWINGS DU
 Work on Floor(s): 004 thru 016

11/19/2015 121171935 03 A2 P APPROVED 12/04/2015 RINI 111 NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 016

07/10/2015 121171935 02 A2 P APPROVED 07/14/2015 RINI 111 NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 016

07/01/2015 122430574 01 A2 X SIGNED OFF 10/23/2019 0068464 RA RINI III NOT APPLICABLE
 FILING HEREWITH FOR INSTALLATION OF EMERGENCY GENERATOR. FILED IN CONJUNCT
 Work on Floor(s): ROF

05/19/2015 121040729 03 NB P APPROVED 05/22/2015 SEHIC GRANTED 07/19/2012
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): CEL,ROF 001 thru 017

04/02/2015 122103838 02 A2 P APPROVED 04/03/2015 DUBINSKY NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01
 Work on Floor(s): OSP

03/11/2015 122331404 01 A2 X SIGNED OFF 10/22/2018 0068464 PE RINI III NOT APPLICABLE
 INSTALLATION OF AIR PRESSURIZED STANDPIPE ALARM IN ACCORDANCE WITH LOCAL L
 Work on Floor(s): CEL,ROF,OSP 001 thru 017

02/17/2015 122262078 01 A2 X SIGNED OFF 08/29/2018 0067012 PE BECKER NOT APPLICABLE
 TEMPORARY SUPPORTS FOR FIRST FLOOR TEMPORARY HOIST WORK IN CONJUNCTION WIT
 Work on Floor(s): 001

01/29/2015 122251400 01 A3 X SIGNED OFF 04/25/2018 0071719 PE UDDIN NOT APPLICABLE
 INSTALLATION OF A SINGLE 6000 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING
 Work on Floor(s): OSP

01/23/2015 122160428 02 A3 P APPROVED 02/04/2015 UDDIN NOT APPLICABLE
 POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF 146 LINEAR FEET OF HEAVY DU
 Work on Floor(s): OSP