| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 07/06/2026 |
140946234 |
02 |
A1 |
G PAA FEE DUE |
07/06/2026 |
|
OJEYEMI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 01/12/2022 |
123831372 |
02 |
A1 |
P APPROVED |
01/18/2022 |
|
SEHIC |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 08/29/2020 |
140946234 |
01 |
A1 |
R PERMIT-ENTIRE |
08/07/2025 |
0023388 RA |
OJEYEMI |
|
NOT APPLICABLE
|
|
CHANGE OF USE AND OCCUPANCY OF SECOND THROUGH NINTH FLOOR APARTMENT UNITS,
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 06/25/2020 |
123511360 |
03 |
A2 |
P APPROVED |
01/14/2022 |
0029622 RA |
SEHIC |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 03/27/2020 |
123831372 |
01 |
A1 |
P APPROVED |
06/01/2020 |
0029622 RA |
SEHIC |
|
NOT APPLICABLE
|
|
THIS NO WORK ALTERATION TYPE I APPLICATION IS BEING FILED FOR CHANGE OF US
|
|
Work on Floor(s): 001
|
| 03/21/2020 |
123511360 |
02 |
A2 |
P APPROVED |
03/27/2020 |
|
SEHIC |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 THIS ALTERATION TYPE II APPLICATION IS BEIN
|
|
Work on Floor(s): CEL,001
|
| 09/23/2019 |
123816228 |
01 |
A2 |
X SIGNED OFF |
09/08/2023 |
0010556 RA |
TOSCANO |
|
NOT APPLICABLE
|
|
INSTALLATION OF INTERIOR PARTITIONS, CEILINGS AND DOORS AS SHOWN ON DRAWIN
|
|
Work on Floor(s): CEL,001
|
| 06/03/2019 |
121040729 |
08 |
NB |
P APPROVED |
06/05/2019 |
|
SEHIC |
|
GRANTED 07/19/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 12/14/2018 |
123511360 |
01 |
A2 |
X SIGNED OFF |
04/03/2025 |
0029622 RA |
SEHIC |
|
NOT APPLICABLE
|
|
THIS ALTERATION TYPE II APPLICATION IS BEING FILED FOR THE INTERIOR RENOVA
|
|
Work on Floor(s): CEL,001
|
| 10/15/2018 |
121040729 |
07 |
NB |
P APPROVED |
10/22/2018 |
|
SEHIC |
|
GRANTED 07/19/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 09/18/2018 |
123581855 |
01 |
A3 |
X SIGNED OFF |
10/25/2018 |
0029622 RA |
SEHIC |
|
NOT APPLICABLE
|
|
THIS ALTERTION TYPE III APPLICATION IS BEING FILED IN CONJUNCTION WITH NB
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 08/30/2018 |
121171935 |
05 |
A2 |
P APPROVED |
09/19/2018 |
|
RINI III |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 016
|
| 08/15/2018 |
121760193 |
02 |
A2 |
P APPROVED |
02/05/2019 |
|
RINI 111 |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF AUTOMATIC SMOKE/HEAT DETECT
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 05/02/2018 |
121040729 |
06 |
NB |
P APPROVED |
06/25/2018 |
|
SEHIC |
|
GRANTED 07/19/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 03/28/2018 |
123426195 |
01 |
A3 |
X SIGNED OFF |
09/27/2018 |
0029622 RA |
SEHIC |
|
NOT APPLICABLE
|
|
INSTALLATION OF MARQUEE AT GROUND LEVEL. FILED IN CONJUNCTION WITH NB#
|
|
Work on Floor(s): GRD
|
| 12/20/2017 |
121171935 |
04 |
A2 |
P APPROVED |
12/28/2017 |
|
RINI III |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 016
|
| 08/10/2017 |
121040729 |
05 |
NB |
P APPROVED |
10/06/2017 |
|
SEHIC |
|
GRANTED 07/19/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 06/27/2017 |
121156015 |
02 |
A2 |
P APPROVED |
07/28/2017 |
0067012 PE |
BECKER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 06/16/2017 |
123059466 |
01 |
A3 |
X SIGNED OFF |
08/08/2018 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY STORAGE PLATFORM AS PER DRAWINGS. TEMPORARY STOR
|
|
Work on Floor(s): OSP
|
| 04/12/2017 |
122331404 |
02 |
A2 |
P APPROVED |
04/27/2017 |
|
RINI III |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 017
|
| 03/09/2017 |
122160419 |
04 |
A3 |
P APPROVED |
03/10/2017 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 11/05/2016 |
122160428 |
04 |
A3 |
P APPROVED |
11/09/2016 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF 100 LINEAR FEET OF HEAVY DU
|
|
Work on Floor(s): OSP
|
| 11/05/2016 |
140487257 |
02 |
A3 |
P APPROVED |
11/09/2016 |
|
PHAGOO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004 thru 016
|
| 07/22/2016 |
121040729 |
04 |
NB |
P APPROVED |
08/22/2016 |
|
SEHIC |
|
GRANTED 07/19/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 07/14/2016 |
122160419 |
03 |
A3 |
P APPROVED |
07/18/2016 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/20/2016 |
122764320 |
01 |
A3 |
X SIGNED OFF |
08/10/2018 |
0079403 PE |
CLARKE |
|
NOT APPLICABLE
|
|
INSTALLATION OF ROOF/OVERHEAD PROTECTION AT ADJACENT BUILDINGS DURING NEW
|
|
Work on Floor(s): ROF
|
| 04/28/2016 |
122160428 |
03 |
A3 |
P APPROVED |
04/29/2016 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 04/26/2016 |
140487257 |
01 |
A3 |
X SIGNED OFF |
05/22/2018 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF DEBRIS NETTING AS PER DRAWINGS DURING NEW BUILDING CONSTRU
|
|
Work on Floor(s): 004 thru 016
|
| 04/22/2016 |
140486855 |
01 |
A3 |
H P/E IN PROCESS |
04/22/2016 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/22/2016 INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING N
|
|
Work on Floor(s): 004 thru 016
|
| 04/22/2016 |
140486846 |
01 |
A3 |
H P/E IN PROCESS |
04/22/2016 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/22/2016 INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING B
|
|
Work on Floor(s): OSP
|
| 04/08/2016 |
140481084 |
01 |
A2 |
H P/E IN PROCESS |
04/08/2016 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/22/2016 INSTALLATION OF DEBRIS NETTING AS PER DRAWINGS DU
|
|
Work on Floor(s): 004 thru 016
|
| 11/19/2015 |
121171935 |
03 |
A2 |
P APPROVED |
12/04/2015 |
|
RINI 111 |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 016
|
| 07/10/2015 |
121171935 |
02 |
A2 |
P APPROVED |
07/14/2015 |
|
RINI 111 |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 016
|
| 07/01/2015 |
122430574 |
01 |
A2 |
X SIGNED OFF |
10/23/2019 |
0068464 RA |
RINI III |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR INSTALLATION OF EMERGENCY GENERATOR. FILED IN CONJUNCT
|
|
Work on Floor(s): ROF
|
| 05/19/2015 |
121040729 |
03 |
NB |
P APPROVED |
05/22/2015 |
|
SEHIC |
|
GRANTED 07/19/2012
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 017
|
| 04/02/2015 |
122103838 |
02 |
A2 |
P APPROVED |
04/03/2015 |
|
DUBINSKY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/11/2015 |
122331404 |
01 |
A2 |
X SIGNED OFF |
10/22/2018 |
0068464 PE |
RINI III |
|
NOT APPLICABLE
|
|
INSTALLATION OF AIR PRESSURIZED STANDPIPE ALARM IN ACCORDANCE WITH LOCAL L
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 017
|
| 02/17/2015 |
122262078 |
01 |
A2 |
X SIGNED OFF |
08/29/2018 |
0067012 PE |
BECKER |
|
NOT APPLICABLE
|
|
TEMPORARY SUPPORTS FOR FIRST FLOOR TEMPORARY HOIST WORK IN CONJUNCTION WIT
|
|
Work on Floor(s): 001
|
| 01/29/2015 |
122251400 |
01 |
A3 |
X SIGNED OFF |
04/25/2018 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SINGLE 6000 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING
|
|
Work on Floor(s): OSP
|
| 01/23/2015 |
122160428 |
02 |
A3 |
P APPROVED |
02/04/2015 |
|
UDDIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF 146 LINEAR FEET OF HEAVY DU
|
|
Work on Floor(s): OSP
|