| 11/14/2022 |
121823688 |
20 |
NB |
P APPROVED |
12/09/2022 |
|
PATEL |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 09/20/2022 |
121823688 |
19 |
NB |
P APPROVED |
10/06/2022 |
|
PATEL |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 06/30/2022 |
121819924 |
02 |
A3 |
P APPROVED |
07/06/2022 |
0087866 PE |
ARISTILD |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 04/21/2022 |
121823688 |
18 |
NB |
P APPROVED |
07/12/2022 |
|
PATEL |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 11/01/2021 |
121823688 |
17 |
NB |
P APPROVED |
11/08/2021 |
0028577 RA |
PATEL |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 06/16/2020 |
140416208 |
03 |
A2 |
P APPROVED |
07/06/2020 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,CEL,ROF 001 thru 006
|
| 04/06/2020 |
121823688 |
16 |
NB |
P APPROVED |
07/02/2020 |
0028577 RA |
PATEL |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 04/15/2019 |
123871685 |
01 |
A2 |
Q PERMIT-PARTIAL |
08/27/2019 |
0023544 RA |
LEE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/23/2020 FILING FOR RENOVATIONS OF 6TH FLOOR AS PER PLANS.
|
|
Work on Floor(s): PH
|
| 04/15/2019 |
123871685 |
02 |
A2 |
Q PERMIT-PARTIAL |
08/27/2019 |
0088825 PE |
ZURICA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/23/2020 MODIFICATION OF EXISTING HVAC SYSTEM AND DUCTWORK
|
|
Work on Floor(s): PH
|
| 01/18/2018 |
121823688 |
15 |
NB |
P APPROVED |
02/01/2018 |
|
MAQAMI |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 01/16/2018 |
121823688 |
14 |
NB |
P APPROVED |
02/01/2018 |
0065040 PE |
RODKIN |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): UG, CEL,ROF 001 thru 007
|
| 10/06/2017 |
121823688 |
13 |
NB |
P APPROVED |
11/02/2017 |
|
MAQAMI |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 09/18/2017 |
140695969 |
01 |
A2 |
X SIGNED OFF |
05/23/2022 |
0020635 RA |
SCHMERZL |
|
NOT APPLICABLE
|
|
FILING TENANT PROTECTION PLAN IN CONJUNCTION WITH NEW BUILDING 121823688
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 09/11/2017 |
123141867 |
01 |
SC |
U COMPLETED |
09/29/2017 |
0022311 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
CONDOMINIUM SUBDIVISION. NO CHANGE TO ZONING LOT METES & BOUNDS. NEW
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 09/08/2017 |
123140715 |
01 |
SC |
J P/E DISAPPROVED |
09/08/2017 |
0022311 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/31/2022 CONDOMINIUM SUBDIVISION. NO CHANGE TO ZONING LOT
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 08/16/2017 |
121823688 |
11 |
NB |
P APPROVED |
08/31/2017 |
0065040 PE |
RODKIN |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): UG, CEL,ROF 001 thru 007
|
| 08/14/2017 |
140416208 |
02 |
A2 |
P APPROVED |
10/19/2017 |
|
RODKIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP,CEL,ROF 001 thru 006
|
| 08/11/2017 |
121823688 |
10 |
NB |
P APPROVED |
09/12/2017 |
|
MAQAMI |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 04/21/2017 |
123081903 |
01 |
A2 |
X SIGNED OFF |
11/12/2019 |
0016499 RA |
SCAGLION |
|
NOT APPLICABLE
|
|
THIS APPLICATION IS FILED FOR A TEMPORARY USE PERMIT FOR A SALES OFFICE
|
|
Work on Floor(s): 001,004
|
| 01/18/2017 |
122576355 |
02 |
A3 |
P APPROVED |
01/19/2017 |
|
ACAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 09/08/2016 |
121823688 |
09 |
NB |
P APPROVED |
01/06/2017 |
|
MAQAMI |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 05/09/2016 |
122633748 |
02 |
A3 |
P APPROVED |
05/10/2016 |
|
ACAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 05/05/2016 |
122680429 |
02 |
A3 |
P APPROVED |
05/12/2016 |
|
BLINN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/31/2016 |
140455843 |
01 |
A3 |
P APPROVED |
07/07/2016 |
0022311 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
HEREWITH FILING FIRE PROTECTION PLAN IN CONJUNCTION WITH NB# 121823688.
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 03/24/2016 |
122680429 |
01 |
A3 |
X SIGNED OFF |
07/21/2017 |
0078402 PE |
BLINN |
|
NOT APPLICABLE
|
|
INSTALLATION OF A DUAL 6000 LBS CAPACITY PERSONNEL/MATERIAL HOIST DURING N
|
|
Work on Floor(s): OSP
|
| 03/04/2016 |
122652904 |
01 |
A3 |
X SIGNED OFF |
09/13/2019 |
0088950 PE |
ACAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD AS PER PLANS DURING NB CONSTRUCTION. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 02/05/2016 |
122576355 |
01 |
A3 |
X SIGNED OFF |
04/20/2018 |
0088950 PE |
ACAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD TYPE ROOF PROTECTION AS PER PLANS DURING NB
|
|
Work on Floor(s): ROF
|
| 01/20/2016 |
121823688 |
08 |
NB |
P APPROVED |
06/08/2016 |
|
MAQAMI |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 01/07/2016 |
122633748 |
01 |
A3 |
X SIGNED OFF |
04/20/2018 |
0088950 PE |
ACAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING NB CONSTRUC
|
|
Work on Floor(s): 001
|
| 10/15/2015 |
140416208 |
01 |
A2 |
X SIGNED OFF |
01/21/2022 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR THE INSTALLATION OF A SPRINKLER/STANDPIPE SYSTEM AS PE
|
|
Work on Floor(s): OSP,CEL,ROF 001 thru 006
|
| 09/09/2015 |
122505949 |
01 |
A2 |
P APPROVED |
09/09/2015 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/03/2021 FILING HEREWITH PLUMBING WORK AS PER PLANS IN CON
|
|
Work on Floor(s): UG, OSP,001
|
| 08/13/2015 |
121823688 |
07 |
NB |
P APPROVED |
10/02/2015 |
|
MAQAMI |
|
AMENDED 01/06/2017
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 05/04/2015 |
122380618 |
01 |
A2 |
X SIGNED OFF |
07/07/2022 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR THE INSTALLATION OF A TEMPORARY STANDPIPE SYSTEM AS PE
|
|
Work on Floor(s): CEL,ROF 001 thru 006
|
| 04/08/2015 |
121823688 |
06 |
NB |
X SIGNED OFF |
01/13/2023 |
0022790 RA |
SIMMONS |
|
AMENDED 01/06/2017
|
|
HEREWITH FILING POOL DESIGN DRAWINGS.
|
|
Work on Floor(s): CEL
|
| 04/07/2015 |
121823688 |
05 |
NB |
X SIGNED OFF |
01/13/2023 |
0074933 PE |
DESIMONE |
|
AMENDED 01/06/2017
|
|
HEREWITH FILING FOUNDATION WORK AS PER PLANS.
|
|
Work on Floor(s): OSP
|
| 01/26/2015 |
122230521 |
01 |
A3 |
X SIGNED OFF |
08/25/2022 |
0016077 RA |
SULLIVAN |
|
NOT APPLICABLE
|
|
HEREWITH FILING FILING CURB CUT IN CONJUNCTION WITH NB#121823688
|
|
Work on Floor(s): OSP
|
| 11/13/2014 |
122071202 |
01 |
A3 |
X SIGNED OFF |
04/20/2018 |
0088950 PE |
ACAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF A CONSTRUCTION FENCE IN CONJUNCTION WITH NB CONSTRUCTION.
|
|
Work on Floor(s): 001
|
| 10/27/2014 |
122178703 |
01 |
PA |
U COMPLETED |
01/27/2021 |
0022311 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL
|
| 10/27/2014 |
122178696 |
01 |
PA |
U COMPLETED |
02/03/2020 |
0022311 RA |
MAQAMI |
|
NOT APPLICABLE
|
|
Work on Floor(s): ROF
|
| 06/23/2014 |
122046678 |
01 |
A2 |
J P/E DISAPPROVED |
03/26/2015 |
0065040 PE |
RODKIN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 10/21/2015 HEREWITH FILING FOR THE INSTALLATION OF A SPRINKL
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 006
|