 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/12/2014 |
140291404 |
01 |
A3 |
X SIGNED OFF |
11/05/2015 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT SIDEWALK SHED PER PLANS. INSTALLATION SHALL COMPLY WITH BSA-351-74-S
|
|
Work on Floor(s): OSP
|
| 02/22/2012 |
120227539 |
02 |
A3 |
P APPROVED |
02/24/2012 |
|
SYED-NAQ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 09/26/2011 |
120836284 |
01 |
DM |
X SIGNED OFF |
01/23/2015 |
0082512 PE |
VALJATO |
|
NOT APPLICABLE
|
|
FULL DEMOLITION OF FOUR STORY STRUCTURE USING MECHANICAL MEANS.
|
|
Work on Floor(s): 001 thru 004
|
| 08/08/2010 |
120245573 |
02 |
A1 |
D A/P ENTIRE |
08/10/2010 |
|
DEMARCO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 02/02/2018
|
|
Work on Floor(s): ROF 002 thru 004
|
| 01/14/2010 |
120245573 |
01 |
A1 |
Q PERMIT-PARTIAL |
02/05/2010 |
0018593 RA |
DEMARCO |
Y |
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/02/2018 FILING HEREWITH ALTERATION TYPE 1 TO REMOVE THE 3
|
|
Work on Floor(s): ROF 002 thru 004
|
| 01/13/2010 |
120243183 |
01 |
A3 |
X SIGNED OFF |
07/05/2013 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
ERECT PIPE SCAFFOLD ON TOP OF EXISTING SIDEWALK SHED # 120227539 AS PER PL
|
|
Work on Floor(s): OSP
|
| 12/18/2009 |
120227539 |
01 |
A3 |
X SIGNED OFF |
08/12/2013 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 30 L.F. AS PER PLAN AT
|
|
Work on Floor(s): OSP
|
| 10/23/2008 |
110361787 |
01 |
DM |
E AP-NPE |
10/23/2008 |
OT |
SANTIAGO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 01/17/2018 DEMOLITION OF FOUR STORY BUILDING
|
|
Work on Floor(s): 001 thru 004
|