| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/02/2015 |
120289053 |
10 |
NB |
P APPROVED |
04/09/2015 |
|
LEVINE |
|
GRANTED 08/22/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 005
|
| 03/18/2015 |
120289053 |
09 |
NB |
P APPROVED |
03/26/2015 |
0038991 PE |
JOSELOW |
|
GRANTED 08/22/2011
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL,0PH,ROF 001 thru 005
|
| 02/11/2015 |
120775571 |
02 |
A2 |
P APPROVED |
02/23/2015 |
|
JOSELOW |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,0PH 001 thru 005
|
| 11/13/2014 |
120289053 |
08 |
NB |
P APPROVED |
12/12/2014 |
0038991 PE |
JOSELOW |
|
GRANTED 08/22/2011
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL,0PH,ROF 001 thru 005
|
| 11/03/2014 |
120289053 |
07 |
NB |
P APPROVED |
12/12/2014 |
|
LEVINE |
|
GRANTED 08/22/2011
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 005
|
| 06/05/2012 |
121084913 |
01 |
A3 |
X SIGNED OFF |
07/30/2013 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING CONSTRUCTION
|
|
Work on Floor(s): OSP
|
| 03/14/2012 |
120995888 |
01 |
A3 |
X SIGNED OFF |
11/07/2014 |
0021914 RA |
LEVINE |
|
NOT APPLICABLE
|
|
FILING FOR INSTALLATION OF SIDEWALK BRIDGE IN CONJUNCTION WITH NB # 120289
|
|
Work on Floor(s): OSP
|
| 01/10/2012 |
120289053 |
06 |
NB |
P APPROVED |
01/27/2012 |
0038991 PE |
JOSELOW |
|
GRANTED 08/22/2011
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): CEL,0PH,ROF 001 thru 005
|
| 08/08/2011 |
120785123 |
01 |
A3 |
X SIGNED OFF |
06/19/2015 |
0219141 RA |
LEVINE |
|
NOT APPLICABLE
|
|
FILING HEREWITH BUILDERS PAVEMENT PLAN IN CONJUNCTION WITH NEW BUILDING #
|
|
Work on Floor(s): OSP
|
| 08/05/2011 |
120289053 |
05 |
NB |
X SIGNED OFF |
07/02/2015 |
0043167 PE |
VACHRIS |
|
GRANTED 08/22/2011
|
|
FILING FOR TEMPORARY SUPPORT OF EXCAVATION.
|
|
Work on Floor(s): CEL
|
| 07/29/2011 |
120775571 |
01 |
A2 |
X SIGNED OFF |
03/10/2015 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
FILING HEREWITH INSTALLATION OF NEW SPRINKLER SYSTEM IN CONJUNCTION WITH N
|
|
Work on Floor(s): CEL,0PH 001 thru 005
|
| 07/28/2011 |
120289053 |
04 |
NB |
X SIGNED OFF |
07/02/2015 |
0038991 PE |
JOSELOW |
|
GRANTED 08/22/2011
|
|
FILING FOR INSTALLATION OF PLUMBING FIXTURES, MECHANICAL HVAC EQUIPMENT AN
|
|
Work on Floor(s): CEL,0PH,ROF 001 thru 005
|
| 07/28/2011 |
120289053 |
03 |
NB |
X SIGNED OFF |
07/02/2015 |
0063244 PE |
GIBBLE |
|
GRANTED 08/22/2011
|
|
FILING HEREWITH FOUNDATION/STRUCTURAL PLANS.
|
|
Work on Floor(s): CEL 001 thru 005
|
| 06/20/2011 |
120289053 |
02 |
NB |
X SIGNED OFF |
07/02/2015 |
0219141 RA |
LEVINE |
|
GRANTED 08/22/2011
|
|
CONSTRUCTION EQUIPMENT FOR NEW BUILDING.
|
|
Work on Floor(s): OSP
|
| 03/12/2010 |
120289053 |
01 |
NB |
X SIGNED OFF |
07/02/2015 |
0021914 RA |
LEVINE |
|
GRANTED 08/22/2011
|
|
APPLICATION FILED TO ERECT NEW 5 STORY BUILDING. INSTALLATION OF 10 LINEAR
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 005
|
| 05/08/2009 |
110444715 |
05 |
NB |
D A/P ENTIRE |
05/08/2009 |
0059584 PE |
RUBIANO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/05/2014 SUBSEQUENT APPLICANT TAKING RESPONSIBILITY FOR IN
|
|
Work on Floor(s): CEL,MEZ,001,ROF
|
| 05/06/2009 |
110444715 |
04 |
NB |
D A/P ENTIRE |
05/06/2009 |
0059584 PE |
RUBIANO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/05/2014 INSTALLATION OF MECHANICAL VENTILATION SYSTEM IN
|
|
Work on Floor(s): CEL,MEZ,001,ROF
|
| 03/30/2009 |
120078432 |
01 |
A2 |
J P/E DISAPPROVED |
04/08/2009 |
0043167 PE |
VACHRIS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/05/2014 FILING FOR TEMPORARY SUPPORT OF EXCAVATION INCONJ
|
|
Work on Floor(s): CEL
|
| 03/25/2009 |
110478019 |
01 |
A3 |
J P/E DISAPPROVED |
03/26/2009 |
0021914 RA |
LEVINE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/05/2014 FILING HEREWITH BUILDERS PAVEMENT PLAN INCONJUNCT
|
|
Work on Floor(s): OSP
|
| 03/10/2009 |
110444715 |
03 |
NB |
J P/E DISAPPROVED |
03/25/2009 |
0063244 PE |
GIBBLE |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/05/2014 FILING HEREWITH STRUCTURAL REINFORCEMENTS INCONJU
|
|
Work on Floor(s): CEL,MEZ,001
|
| 03/04/2009 |
110465719 |
01 |
A2 |
J P/E DISAPPROVED |
03/11/2009 |
0059584 PE |
RUBIANO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/05/2014 FILING NEW SPRINKLER SYSTEM INCONJUCTION WITH NB#
|
|
Work on Floor(s): CEL,MEZ,001,ROF
|
| 03/03/2009 |
110444715 |
02 |
NB |
J P/E DISAPPROVED |
03/25/2009 |
0059584 PE |
RUBIANO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/05/2014 SUBSEQUENT APPLICANT TAKING RESPONSIBILITY FOR IN
|
|
Work on Floor(s): CEL,MEZ,001,ROF
|
| 01/30/2009 |
110444715 |
01 |
NB |
J P/E DISAPPROVED |
04/07/2009 |
0021914 RA |
LEVINE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/05/2014 APPLICATION FILED TO ERECT NEW ONE STORY BUILDING
|
|
Work on Floor(s): CEL,MEZ,001
|
| 01/20/1995 |
100971655 |
01 |
A3 |
R PERMIT-ENTIRE |
01/23/1995 |
0012075 RA |
SCHWARZ |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/06/2014 INSTALL TEMPORARY ENCLOSED STRUCTURE FOR MARKETS,
|
|
Work on Floor(s): GRD
|