| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/10/2025 |
103880374 |
27 |
NB |
P APPROVED |
06/10/2025 |
|
MAY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL 001 thru 006
|
| 11/12/2024 |
103880374 |
26 |
NB |
P APPROVED |
11/12/2024 |
|
MAY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL 001 thru 006
|
| 06/25/2018 |
103888232 |
02 |
PA |
P APPROVED |
06/28/2018 |
0014625 RA |
MAY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 005
|
| 04/11/2018 |
104212157 |
05 |
A2 |
P APPROVED |
04/11/2018 |
|
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 004,005
|
| 03/16/2018 |
104212157 |
04 |
A2 |
P APPROVED |
03/16/2018 |
|
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 004,005
|
| 03/01/2018 |
104212157 |
03 |
A2 |
P APPROVED |
03/01/2018 |
|
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 004,005
|
| 05/26/2017 |
103880374 |
25 |
NB |
P APPROVED |
05/26/2017 |
0069271 PE |
BHORANIY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): OSP
|
| 05/26/2017 |
103880374 |
24 |
NB |
P APPROVED |
05/26/2017 |
0069271 PE |
BHORANIY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): OSP
|
| 03/31/2017 |
104212157 |
01 |
A2 |
X SIGNED OFF |
03/18/2019 |
0014625 RA |
MAY |
|
NOT APPLICABLE
|
|
REMOVE AND RELOCATE EGRESS DOOR AT THE 5TH FLOOR GYMATORIUM AS PER PLAN FI
|
|
Work on Floor(s): 005
|
| 03/31/2017 |
104212157 |
02 |
A2 |
X SIGNED OFF |
03/18/2019 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
PL: REPLACE TWO (2) DRINKING FOUNTAINS AND ONE (1) DRINKING FOUNTAIN AT NE
|
|
Work on Floor(s): 004,005
|
| 12/12/2016 |
103889071 |
03 |
A2 |
P APPROVED |
12/12/2016 |
|
LEVIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 09/30/2016 |
103880374 |
23 |
NB |
P APPROVED |
09/30/2016 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 006
|
| 09/28/2016 |
103880374 |
22 |
NB |
P APPROVED |
09/28/2016 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 006
|
| 08/26/2016 |
103649633 |
01 |
A3 |
X SIGNED OFF |
12/10/2020 |
0014625 RA |
MAY |
|
NOT APPLICABLE
|
|
INSTALLATION OF 20'-0" STEEL FACE DROP CURB AND DRIVEWAY / SIDEWALK TO PRO
|
|
Work on Floor(s): OSP
|
| 08/18/2016 |
103880374 |
21 |
NB |
P APPROVED |
08/18/2016 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): BAS 001 thru 006
|
| 07/08/2016 |
103880374 |
20 |
NB |
P APPROVED |
07/08/2016 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): BAS 001 thru 006
|
| 07/07/2016 |
103880374 |
19 |
NB |
P APPROVED |
07/07/2016 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): BAS 001 thru 006
|
| 05/23/2016 |
103642667 |
02 |
A3 |
P APPROVED |
05/23/2016 |
0014625 RA |
MAY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,R 001 thru 006
|
| 05/19/2016 |
103880374 |
18 |
NB |
P APPROVED |
05/19/2016 |
0014625 RA |
MAY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL 001 thru 006
|
| 02/09/2016 |
103880374 |
17 |
NB |
P APPROVED |
02/09/2016 |
|
THOMPSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL 001 thru 006
|
| 01/21/2016 |
103880374 |
16 |
NB |
P APPROVED |
01/21/2016 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 006
|
| 03/10/2014 |
103880374 |
15 |
NB |
P APPROVED |
03/10/2014 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): BAS 001 thru 006
|
| 09/06/2013 |
103880374 |
14 |
NB |
P APPROVED |
09/06/2013 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): BAS 001 thru 006
|
| 09/06/2013 |
103880374 |
13 |
NB |
P APPROVED |
09/06/2013 |
|
THOMPSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL 001 thru 006
|
| 06/20/2013 |
103888205 |
02 |
A2 |
P APPROVED |
06/20/2013 |
|
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF 001 thru 006
|
| 05/17/2013 |
103889071 |
02 |
A2 |
P APPROVED |
05/17/2013 |
|
LEVIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001 thru 006
|
| 01/31/2013 |
103889222 |
02 |
A3 |
P APPROVED |
01/31/2013 |
0892711 PE |
BHORANIY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
| 01/25/2013 |
103880374 |
12 |
NB |
P APPROVED |
01/25/2013 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,ROF,PEN 001 thru 006
|
| 01/25/2013 |
103888456 |
02 |
A2 |
P APPROVED |
01/25/2013 |
|
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS 001 thru 006
|
| 01/22/2013 |
103880374 |
11 |
NB |
P APPROVED |
01/22/2013 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): BAS 001 thru 006
|
| 01/22/2013 |
103880374 |
10 |
NB |
P APPROVED |
01/22/2013 |
|
THOMPSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,CEL 001 thru 006
|
| 11/09/2012 |
103642596 |
01 |
A2 |
X SIGNED OFF |
03/21/2014 |
0069352 PE |
GIBBONS |
|
NOT APPLICABLE
|
|
INSTALL NEW FIRE SUPPRESSION SYSTEM ONLY AS SHOWN ON PLANS. FIRE SUPPRESSI
|
|
Work on Floor(s): 001
|
| 10/23/2012 |
103642667 |
01 |
A3 |
X SIGNED OFF |
11/04/2020 |
0014625 RA |
MAY |
|
NOT APPLICABLE
|
|
FIRE PROTECTION PLAN FOR NEW SCHOOL BUILDING
|
|
Work on Floor(s): CEL,BAS,R 001 thru 006
|
| 06/15/2011 |
120728427 |
01 |
A3 |
X SIGNED OFF |
03/07/2013 |
0058308 PE |
GUIDICE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 118 LINEAR FEET OF ONE BEAVER, MATERIAL HOIST DURING NEW
|
|
Work on Floor(s): OSP
|
| 03/08/2010 |
103889222 |
01 |
A3 |
X SIGNED OFF |
12/10/2020 |
0892711 PE |
BHORANIY |
|
NOT APPLICABLE
|
|
PROPOSED BUILDERS PAVEMENT PLAN FILED IN CONJUNCTION WITH NEW BUILDING
|
|
Work on Floor(s): BAS 001 thru 006
|
| 02/03/2010 |
103889080 |
01 |
A2 |
X SIGNED OFF |
01/28/2015 |
0065563 PE |
SETTEDUC |
|
NOT APPLICABLE
|
|
COMMUNITY HEALTH ACADEMY. HEREWITH FILING A SEPARATE SHORING APPLICATION I
|
|
Work on Floor(s): OSP
|
| 02/02/2010 |
103889071 |
01 |
A2 |
X SIGNED OFF |
01/27/2017 |
0073350 PE |
LEVIN |
|
NOT APPLICABLE
|
|
COMMUNITY HEALTH ACADEMY. HEREWITH FILING A SEPARATE STANDPIPE APPLICATION
|
|
Work on Floor(s): 001 thru 006
|
| 01/08/2010 |
103880374 |
09 |
NB |
R PERMIT-ENTIRE |
04/21/2010 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
SUBSEQUENT FILING OF STANDPIPE FIRE PUMP.
|
|
Work on Floor(s): BAS,CEL 001 thru 006
|
| 01/08/2010 |
103880374 |
08 |
NB |
R PERMIT-ENTIRE |
03/05/2010 |
0075969 PE |
MENA |
|
NOT APPLICABLE
|
|
SUBSEQUENT FILING OF UNDERGROUND PLUMBING AS A WORK TYPE.
|
|
Work on Floor(s): CEL,BAS
|
| 10/21/2009 |
103888768 |
01 |
A3 |
X SIGNED OFF |
04/23/2014 |
0071297 PE |
FARUQI |
|
NOT APPLICABLE
|
|
COMM.HEALTH ACADEMY. HEREWITH FILING A SIDEWALK SHED APPLICATION IN CONJUN
|
|
Work on Floor(s): OSP
|