| | | | | | | |
FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
09/26/2018 |
123563777 |
PR |
I LAA SIGNED OFF |
10/08/2019 |
FSC 000123 |
ISRAEL |
|
WE ARE HERE WITH SUBMIT THIS LAA TO REARRAGE THREE (3)SPRINKLER HEADS USIN
|
|
Work on Floor(s): 091
|
09/11/2018 |
140801942 |
PR |
I LAA SIGNED OFF |
08/23/2019 |
MP 002072 |
GAVRIELA |
|
IN APT #28J ON THE 28TH FLOOR REPLACE ON EXISTING ROUGHING (1)WATER CLOSET
|
|
Work on Floor(s): 028
|
04/02/2018 |
140753780 |
PR |
I LAA SIGNED OFF |
08/15/2019 |
MP 001380 |
FORTE |
|
IN APT #81B ON THE 81ST FLOOR INSTALL (4) FUNNEL DRAINS W/ TRAP PRIMERS &
|
|
Work on Floor(s): 081
|
03/22/2018 |
140750266 |
PR |
I LAA SIGNED OFF |
10/29/2018 |
MP 002072 |
GAVRIELA |
|
IN APT #29P ON THE 29TH FLOOR REPLACE (1) TUB W/ SHOWER & REPLACE SHOWER B
|
|
Work on Floor(s): 029
|
01/17/2018 |
122600186 |
PR |
E LAA FILED |
04/03/2018 |
FSC 001031 |
STERN |
|
WE ARE HERE WITH FILING THIS LAA TO REARRANGE 5 SPRINKLER HEADS AND ADD 1
|
|
Work on Floor(s): 051
|
01/17/2018 |
122600177 |
PR |
E LAA FILED |
02/22/2018 |
FSC 001031 |
STERN |
|
WE ARE HERE WITH FILING THIS LAA TO REARRANGE 11 SPRINKLER HEADS AND ADD 4
|
|
Work on Floor(s): 088
|
01/17/2018 |
122600168 |
PR |
E LAA FILED |
02/22/2018 |
FSC 001031 |
STERN |
|
WE ARE HERE WITH FILING THIS LAA TO REARRANGE 10 SPRINKLER HEADS AND ADD 5
|
|
Work on Floor(s): 044
|
01/17/2018 |
122600159 |
PR |
E LAA FILED |
04/03/2018 |
FSC 001031 |
STERN |
|
WE ARE HERE WITH FILING THIS LAA TO REARRANGE 1 SPRINKLER HEAD AND REMOVE
|
|
Work on Floor(s): 052
|
01/17/2018 |
122600140 |
PR |
E LAA FILED |
02/22/2018 |
FSC 001031 |
STERN |
|
WE ARE HEREWITH FILING THIS LAA TO REARRANGE 6 SPRINKLER HEADS USING 50'OF
|
|
Work on Floor(s): 073
|
01/17/2018 |
122600131 |
PR |
E LAA FILED |
04/03/2018 |
FSC 001031 |
STERN |
|
WE ARE HERE WITH FILING THIS LAA TO REARRANGE 9 SPRINKLER HEADS USING 60'O
|
|
Work on Floor(s): 087
|
01/12/2018 |
122599866 |
PR |
E LAA FILED |
04/03/2018 |
FSC 001031 |
STERN |
|
WE ARE HERE WITH FILING THIS LAA TO REARRANGE 2 SPRINKLER HEADS AND ADD 3
|
|
Work on Floor(s): 056
|
01/12/2018 |
122599786 |
PR |
E LAA FILED |
04/03/2018 |
FSC 001031 |
STERN |
|
WE ARE HERE WITH FILING THIS LAA TO REARRANGE 4 SPRINKLER HEADS USING 65'O
|
|
Work on Floor(s): 057
|
01/12/2018 |
122599777 |
PR |
E LAA FILED |
04/03/2018 |
FSC 001031 |
STERN |
|
WE ARE HERE WITH FILING THIS LAA TO REARRANGE 7 SPRINKLER HEADS USING 70'O
|
|
Work on Floor(s): 081
|
01/12/2018 |
122599768 |
PR |
E LAA FILED |
04/10/2018 |
FSC 001031 |
STERN |
|
WE ARE HEREWITH FILING THIS LAA TO REARRANGE 3 SPINKLER HEADS USING 35' OF
|
|
Work on Floor(s): 044
|
01/12/2018 |
122599759 |
PR |
E LAA FILED |
04/03/2018 |
FSC 001031 |
STERN |
|
WE ARE HERE WITH FILING THIS LAA TO REARRANGE 7 SPRINKLER HEADS USING 65'O
|
|
Work on Floor(s): 067
|
01/12/2018 |
122599740 |
PR |
I LAA SIGNED OFF |
08/21/2018 |
FSC 001031 |
STERN |
|
WE ARE WITH FILING THIS THIS LAA TO REARRANGE THREE SPRINKLER HEADS AND AD
|
|
Work on Floor(s): 018
|
08/31/2017 |
140689379 |
PR |
E LAA FILED |
08/31/2017 |
MP 001544 |
BRESLAW |
|
ROUGH, FURNISH & INSTALL (3) HUB DRAINS. ROUGH & CONNECT THE FOLLOWING KIT
|
|
Work on Floor(s): GND
|
08/23/2017 |
122591711 |
PR |
E LAA FILED |
09/15/2017 |
MP 000768 |
GOFFREDO |
|
FILE LAA TO DO WORK ON THE 55TH FLOOR APT# 55A TO REMOVE A BATHTUB AND REP
|
|
Work on Floor(s): 055
|
07/26/2017 |
122590062 |
PR |
E LAA FILED |
09/25/2017 |
FSC 000115 |
BLACK |
|
JOB WITHDRAWN 06 15 2022
|
|
Work on Floor(s): LOB
|
11/07/2016 |
122583837 |
PR |
J LAA DISAPPROVED |
11/18/2016 |
OBI 001509 |
BENDJOUY |
|
JOB WITHDRAWN 02 25 2022
|
|
Work on Floor(s): OSP
|
09/02/2016 |
122579897 |
PR |
J LAA DISAPPROVED |
09/22/2016 |
FSC 000123 |
ISRAEL |
|
FILING LAA FOR THE REMOVAL OF 1 SPRINKLER HEAD, TO REARRANGE 5 SPRINKLER H
|
|
Work on Floor(s): 054
|
11/20/2014 |
121876087 |
PR |
A LAA PREFILED |
11/20/2014 |
MP |
|
10/01/2014 |
140261856 |
PR |
E LAA FILED |
10/01/2014 |
MP 000818 |
DEMARTIN |
|
JOB WITHDRAWN 12 31 2015
|
|
Work on Floor(s): 006 thru 022
|
09/15/2014 |
140253856 |
PR |
E LAA FILED |
09/15/2014 |
MP 000818 |
DEMARTIN |
|
JOB WITHDRAWN 12 31 2015
|
|
Work on Floor(s): 046 thru 055
|
09/27/2013 |
140119324 |
PR |
E LAA FILED |
09/27/2013 |
MP 000818 |
DEMARTIN |
|
JOB WITHDRAWN 12 31 2015
|
|
Work on Floor(s): 006 thru 022
|
02/15/2011 |
110529900 |
PR |
A LAA PREFILED |
02/15/2011 |
MP 000818 |
DEMARTIN |
|
CAP AND REMOVE PLUMBING STACKS AND RISERS ON FLOORS CELLAR 1-5 AND ROOF.
|
|
Work on Floor(s): ROF 001 thru 005
|