BIS Menu  |  Applications   FAQs  |  Glossary   
DOB Logo - Link to Homepage NYC.gov Logo - Link to Homepage
NYC Department of Buildings
Job Overview
The below job records do not include filings submitted in DOB NOW; use the DOB NOW Public Portal to access DOB NOW records.
ARA / LAA Job Overview
Page: 1 of 1
Premises: 432 PARK AVENUE MANHATTAN BIN: 1088817    Block: 1292    Lot: 7502

To start overview at new date, select Month:   Day:   Year:  

FILE DATE JOB # JOB TYPE JOB STATUS STATUS DATE LIC # APPLICANT
09/26/2018 123563777 PR I LAA SIGNED OFF 10/08/2019 FSC 000123 ISRAEL
 WE ARE HERE WITH SUBMIT THIS LAA TO REARRAGE THREE (3)SPRINKLER HEADS USIN
 Work on Floor(s): 091

09/11/2018 140801942 PR I LAA SIGNED OFF 08/23/2019 MP 002072 GAVRIELA
 IN APT #28J ON THE 28TH FLOOR REPLACE ON EXISTING ROUGHING (1)WATER CLOSET
 Work on Floor(s): 028

04/02/2018 140753780 PR I LAA SIGNED OFF 08/15/2019 MP 001380 FORTE
 IN APT #81B ON THE 81ST FLOOR INSTALL (4) FUNNEL DRAINS W/ TRAP PRIMERS &
 Work on Floor(s): 081

03/22/2018 140750266 PR I LAA SIGNED OFF 10/29/2018 MP 002072 GAVRIELA
 IN APT #29P ON THE 29TH FLOOR REPLACE (1) TUB W/ SHOWER & REPLACE SHOWER B
 Work on Floor(s): 029

01/17/2018 122600186 PR E LAA FILED 04/03/2018 FSC 001031 STERN
 WE ARE HERE WITH FILING THIS LAA TO REARRANGE 5 SPRINKLER HEADS AND ADD 1
 Work on Floor(s): 051

01/17/2018 122600177 PR E LAA FILED 02/22/2018 FSC 001031 STERN
 WE ARE HERE WITH FILING THIS LAA TO REARRANGE 11 SPRINKLER HEADS AND ADD 4
 Work on Floor(s): 088

01/17/2018 122600168 PR E LAA FILED 02/22/2018 FSC 001031 STERN
 WE ARE HERE WITH FILING THIS LAA TO REARRANGE 10 SPRINKLER HEADS AND ADD 5
 Work on Floor(s): 044

01/17/2018 122600159 PR E LAA FILED 04/03/2018 FSC 001031 STERN
 WE ARE HERE WITH FILING THIS LAA TO REARRANGE 1 SPRINKLER HEAD AND REMOVE
 Work on Floor(s): 052

01/17/2018 122600140 PR E LAA FILED 02/22/2018 FSC 001031 STERN
 WE ARE HEREWITH FILING THIS LAA TO REARRANGE 6 SPRINKLER HEADS USING 50'OF
 Work on Floor(s): 073

01/17/2018 122600131 PR E LAA FILED 04/03/2018 FSC 001031 STERN
 WE ARE HERE WITH FILING THIS LAA TO REARRANGE 9 SPRINKLER HEADS USING 60'O
 Work on Floor(s): 087

01/12/2018 122599866 PR E LAA FILED 04/03/2018 FSC 001031 STERN
 WE ARE HERE WITH FILING THIS LAA TO REARRANGE 2 SPRINKLER HEADS AND ADD 3
 Work on Floor(s): 056

01/12/2018 122599786 PR E LAA FILED 04/03/2018 FSC 001031 STERN
 WE ARE HERE WITH FILING THIS LAA TO REARRANGE 4 SPRINKLER HEADS USING 65'O
 Work on Floor(s): 057

01/12/2018 122599777 PR E LAA FILED 04/03/2018 FSC 001031 STERN
 WE ARE HERE WITH FILING THIS LAA TO REARRANGE 7 SPRINKLER HEADS USING 70'O
 Work on Floor(s): 081

01/12/2018 122599768 PR E LAA FILED 04/10/2018 FSC 001031 STERN
 WE ARE HEREWITH FILING THIS LAA TO REARRANGE 3 SPINKLER HEADS USING 35' OF
 Work on Floor(s): 044

01/12/2018 122599759 PR E LAA FILED 04/03/2018 FSC 001031 STERN
 WE ARE HERE WITH FILING THIS LAA TO REARRANGE 7 SPRINKLER HEADS USING 65'O
 Work on Floor(s): 067

01/12/2018 122599740 PR I LAA SIGNED OFF 08/21/2018 FSC 001031 STERN
 WE ARE WITH FILING THIS THIS LAA TO REARRANGE THREE SPRINKLER HEADS AND AD
 Work on Floor(s): 018

08/31/2017 140689379 PR E LAA FILED 08/31/2017 MP 001544 BRESLAW
 ROUGH, FURNISH & INSTALL (3) HUB DRAINS. ROUGH & CONNECT THE FOLLOWING KIT
 Work on Floor(s): GND

08/23/2017 122591711 PR E LAA FILED 09/15/2017 MP 000768 GOFFREDO
 FILE LAA TO DO WORK ON THE 55TH FLOOR APT# 55A TO REMOVE A BATHTUB AND REP
 Work on Floor(s): 055

07/26/2017 122590062 PR E LAA FILED 09/25/2017 FSC 000115 BLACK
 JOB WITHDRAWN 06 15 2022
 Work on Floor(s): LOB

11/07/2016 122583837 PR J LAA DISAPPROVED 11/18/2016 OBI 001509 BENDJOUY
 JOB WITHDRAWN 02 25 2022
 Work on Floor(s): OSP

09/02/2016 122579897 PR J LAA DISAPPROVED 09/22/2016 FSC 000123 ISRAEL
 FILING LAA FOR THE REMOVAL OF 1 SPRINKLER HEAD, TO REARRANGE 5 SPRINKLER H
 Work on Floor(s): 054

11/20/2014 121876087 PR A LAA PREFILED 11/20/2014 MP
10/01/2014 140261856 PR E LAA FILED 10/01/2014 MP 000818 DEMARTIN
 JOB WITHDRAWN 12 31 2015
 Work on Floor(s): 006 thru 022

09/15/2014 140253856 PR E LAA FILED 09/15/2014 MP 000818 DEMARTIN
 JOB WITHDRAWN 12 31 2015
 Work on Floor(s): 046 thru 055

09/27/2013 140119324 PR E LAA FILED 09/27/2013 MP 000818 DEMARTIN
 JOB WITHDRAWN 12 31 2015
 Work on Floor(s): 006 thru 022

02/15/2011 110529900 PR A LAA PREFILED 02/15/2011 MP 000818 DEMARTIN
 CAP AND REMOVE PLUMBING STACKS AND RISERS ON FLOORS CELLAR 1-5 AND ROOF.
 Work on Floor(s): ROF 001 thru 005



If you have any questions please review these Frequently Asked Questions, the Glossary, or call the 311 Citizen Service Center by dialing 311 or (212) NEW YORK outside of New York City.

BIS Menu  |  Applications