| 03/15/2018 |
123384328 |
01 |
A2 |
R PERMIT-ENTIRE |
01/15/2019 |
0089283 PE |
MUNGWA |
|
NOT APPLICABLE
|
|
PERFORM CIVIL WORK NECESSARY TO SUPPORT THE SPILL PREVENTION CONTAINMENT &
|
|
Work on Floor(s): GND
|
| 05/25/2017 |
122984878 |
01 |
A2 |
R PERMIT-ENTIRE |
05/24/2018 |
0062877 PE |
NUZZI |
|
NOT APPLICABLE
|
|
PERFORM THE CIVIL WORK NECESSARY TO UPGRADE THE "SPILL PREVENTION CONTROL
|
|
Work on Floor(s): GRD
|
| 01/04/2017 |
140586186 |
01 |
A3 |
R PERMIT-ENTIRE |
01/17/2017 |
0085110 PE |
ODIGIE |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 PSF.
|
|
Work on Floor(s): OSP
|
| 11/17/2016 |
122714054 |
01 |
A2 |
R PERMIT-ENTIRE |
03/07/2017 |
0060960 PE |
THORN |
|
NOT APPLICABLE
|
|
INSTALLATION OF A DELUGE SYSTEM RELATED TO THE TRANSFORMER #4 REPLACEMENT
|
|
Work on Floor(s): GRD
|
| 09/21/2016 |
140546531 |
01 |
A2 |
R PERMIT-ENTIRE |
05/24/2018 |
0062877 PE |
NUZZI |
|
NOT APPLICABLE
|
|
PERFORM THE FOLLOWING CIVIL WORK FOR THE REPLACEMENT OF CON EDISON'S TRANS
|
|
Work on Floor(s): GND
|
| 09/07/2016 |
140545435 |
01 |
A2 |
D A/P ENTIRE |
09/07/2016 |
0062877 PE |
NUZZI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/09/2016 PERFORM THE FOLLOWING CIVIL WORK FOR THE REPLACEM
|
|
Work on Floor(s): GND
|
| 09/06/2016 |
140545033 |
01 |
A2 |
D A/P ENTIRE |
09/06/2016 |
0062877 PE |
NUZZI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/09/2016 PERFORM THE FOLLOWING CIVIL WORK FOR THE REPLACEM
|
|
Work on Floor(s): GND
|
| 05/06/2015 |
140344090 |
01 |
A3 |
H P/E IN PROCESS |
05/06/2015 |
0032813 PE |
PARMET |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/06/2015 CONED-INSTALLATION OF 8FT HIGH CONSTRUCTION FENCE
|
|
Work on Floor(s): OSP
|
| 04/23/2015 |
140336777 |
01 |
A3 |
X SIGNED OFF |
06/15/2015 |
0032813 PE |
PARMET |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS SHOWN ON DRAWING. 2 SCAFFOLD FRAMES (H<40
|
|
Work on Floor(s): OSP
|
| 04/14/2015 |
140334234 |
01 |
A3 |
H P/E IN PROCESS |
04/14/2015 |
0032813 PE |
PARMET |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/20/2015 INSTALLATION OF SIDEWALK SHED AS SHOWN ON DRAWING
|
|
Work on Floor(s): OSP
|
| 04/14/2015 |
140333823 |
01 |
A3 |
H P/E IN PROCESS |
04/14/2015 |
0032813 PE |
PARMET |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/14/2015 INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN
|
|
Work on Floor(s): OSP
|
| 04/07/2015 |
140330773 |
01 |
A3 |
H P/E IN PROCESS |
04/07/2015 |
0032813 PE |
PARMET |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/14/2015 INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN
|
|
Work on Floor(s): OSP
|
| 02/06/2015 |
140308076 |
01 |
A3 |
R PERMIT-ENTIRE |
02/11/2015 |
0032813 PE |
PARMET |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS SHOWN ON DRAWING. 2 SCAFFOLD F
|
|
Work on Floor(s): OSP
|
| 01/28/2015 |
122257379 |
01 |
A2 |
R PERMIT-ENTIRE |
02/02/2018 |
0060960 PE |
THORN |
|
NOT APPLICABLE
|
|
REPLACEMENT OF DELUGE SYSTEM FOR TRANSFORMER NO. 3 AT THE CON EDISON, EAST
|
|
Work on Floor(s): OSP
|
| 12/16/2014 |
140292528 |
01 |
A2 |
D A/P ENTIRE |
12/16/2014 |
0060960 PE |
THORN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/06/2015 REPLACEMENT OF DELUGE SYSTEM FOR TRANSFORMER NO.
|
|
Work on Floor(s): OSP
|
| 09/14/2014 |
140239533 |
01 |
A2 |
R PERMIT-ENTIRE |
11/18/2014 |
0062877 PE |
NUZZI |
|
NOT APPLICABLE
|
|
MODIFICATIONS TO THE CONCRETE PAD AND MOAT FOR TRANSFORMER 3 AT THE CON ED
|
|
Work on Floor(s): OSP
|
| 05/21/2014 |
122016638 |
01 |
A2 |
J P/E DISAPPROVED |
07/16/2014 |
0062877 PE |
NUZZI |
|
NOT APPLICABLE
|
|
FILING FOR TEMPORARY WORK TRAILER REQUIRED TO SUPPORT WORK AT CON EDISON'S
|
|
Work on Floor(s): OSP
|
| 03/28/2000 |
102851004 |
01 |
A2 |
R PERMIT-ENTIRE |
05/04/2000 |
0706791 PE |
STACHOWI |
|
NOT APPLICABLE
|
|
REMOVE DELUGE PIPING AND HEADS FOR RE- PLACEMENT OF TRANSFORMER #5.
|
|
Work on Floor(s): GRD
|
| 03/07/2000 |
102642703 |
01 |
A2 |
R PERMIT-ENTIRE |
04/28/2000 |
0045643 PE |
Webb |
|
NOT APPLICABLE
|
|
Modify existing concrete foundation for replacement of Transformer #5. Th
|
|