 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/19/2022 |
104827797 |
22 |
NB |
P APPROVED |
12/21/2022 |
|
RAWLINGS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 09/27/2021 |
123775290 |
03 |
A2 |
P APPROVED |
10/12/2021 |
|
OPPENHEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC,ROF
|
| 07/07/2020 |
140921064 |
01 |
A3 |
X SIGNED OFF |
05/12/2022 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF 600 LBS CAPACITY ELECTRIC MATERIAL ONLY HOISTS DURING BLDG
|
|
Work on Floor(s): OSP
|
| 03/02/2020 |
123886599 |
02 |
A3 |
P APPROVED |
03/05/2020 |
|
WALSH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 12/12/2019 |
123886599 |
01 |
A3 |
P APPROVED |
12/12/2019 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
FACADE SITE SAFETY PLAN (SSP) FILED IN CONJUNCTION WITH APPLICATION #
|
|
Work on Floor(s): FAC
|
| 06/27/2019 |
123775290 |
01 |
A2 |
X SIGNED OFF |
10/18/2021 |
0069888 PE |
OPPENHEI |
|
NOT APPLICABLE
|
|
REPLACEMENT OF BALCONY RAILINGS, REPAIR CONCRETE SLAB AT BALCONIES, INSTAL
|
|
Work on Floor(s): FAC,ROF
|
| 06/27/2019 |
123775290 |
02 |
A2 |
X SIGNED OFF |
10/18/2021 |
0069888 PE |
OPPENHEI |
|
NOT APPLICABLE
|
|
STRUCTURAL REINFORCEMENT OF RAILINGS TO WALL AND SLABS, INSTALL ANCHORS,
|
|
Work on Floor(s): FAC,ROF
|
| 04/18/2018 |
104827797 |
21 |
NB |
P APPROVED |
06/12/2018 |
|
RAWLINGS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 08/02/2016 |
104827797 |
20 |
NB |
P APPROVED |
08/12/2016 |
|
RAWLINGS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 02/22/2016 |
104827797 |
19 |
NB |
P APPROVED |
07/15/2016 |
|
RAWLINGS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 09/30/2015 |
140409485 |
01 |
A3 |
X SIGNED OFF |
09/22/2020 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 06/23/2015 |
104827797 |
18 |
NB |
P APPROVED |
08/13/2015 |
|
RAWLINGS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 07/16/2013 |
140096394 |
01 |
A3 |
X SIGNED OFF |
03/16/2015 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SIDEWALK SHED AS PER PLAN. WORK SHALL COMPLY WITH 2008 BUI
|
|
Work on Floor(s): OSP
|
| 05/30/2013 |
104827797 |
17 |
NB |
P APPROVED |
06/19/2013 |
|
RAWLINGS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 11/08/2012 |
121497120 |
01 |
A2 |
X SIGNED OFF |
09/20/2013 |
0035645 RA |
TEETER |
|
NOT APPLICABLE
|
|
PARTIAL REPLACEMENT OF EXISTING STONE PAVERS WITH APPROVED IPE DECKING.
|
|
Work on Floor(s): 012
|
| 01/14/2010 |
104827797 |
16 |
NB |
D A/P ENTIRE |
01/20/2010 |
|
RAWLINGS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 01/26/2010
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 09/09/2009 |
104827797 |
15 |
NB |
P APPROVED |
09/11/2009 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 08/31/2009 |
104827797 |
14 |
NB |
P APPROVED |
09/02/2009 |
0020790 RA |
RAWLINGS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 08/14/2009 |
104902296 |
06 |
A2 |
P APPROVED |
08/17/2009 |
|
GLICKMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 08/14/2009 |
104827797 |
13 |
NB |
P APPROVED |
08/17/2009 |
|
GLICKMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 08/05/2009 |
104827797 |
12 |
NB |
P APPROVED |
08/07/2009 |
|
GLICKMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 06/08/2009 |
104827797 |
11 |
NB |
P APPROVED |
06/09/2009 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 04/15/2009 |
104827797 |
10 |
NB |
P APPROVED |
04/24/2009 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 04/15/2009 |
104902296 |
05 |
A2 |
P APPROVED |
04/27/2009 |
|
Glickman |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 04/06/2009 |
120077111 |
02 |
A3 |
P APPROVED |
04/08/2009 |
|
ABOUZID |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 03/27/2009 |
120077111 |
01 |
A3 |
X SIGNED OFF |
10/22/2010 |
0082098 PE |
ABOUZID |
|
NOT APPLICABLE
|
|
WE WILL INSTALL 9888 SQF OF PIPE SCAFFOLD AT THE BUILDING . THERE WILL B
|
|
Work on Floor(s): OSP
|
| 02/26/2009 |
110464934 |
01 |
SC |
U COMPLETED |
03/02/2009 |
0020790 RA |
RAWLINGS |
|
NOT APPLICABLE
|
|
WE ARE PROPOSING A CONDOMINIUM SUBDIVISION. EXSISTING LOT 27 WILL BE SUBDI
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 02/19/2009 |
110448819 |
02 |
A3 |
P APPROVED |
02/20/2009 |
|
MCERLEAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 02/18/2009 |
104827797 |
09 |
NB |
P APPROVED |
02/19/2009 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 05
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 02/18/2009 |
104902296 |
04 |
A2 |
P APPROVED |
02/19/2009 |
|
Glickman |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 02/10/2009 |
110446170 |
01 |
SI |
U COMPLETED |
02/10/2009 |
0020790 RA |
RAWLINGS |
|
NOT APPLICABLE
|
|
WE ARE PROPOSING A CONDOMINIUM SUBDIVISION. EXISTING LOT 27 WILL BE SUBDIV
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 02/04/2009 |
110448819 |
01 |
A3 |
X SIGNED OFF |
05/19/2009 |
0079601 PE |
MCERLEAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AT 4TH FLOOR SETBACK, AS PER PLANS, DURING N
|
|
Work on Floor(s): 004
|
| 01/30/2009 |
104902296 |
03 |
A2 |
P APPROVED |
02/03/2009 |
|
Glickman |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 01/28/2009 |
110443093 |
01 |
A3 |
P APPROVED |
11/23/2010 |
0020790 RA |
RAWLINGS |
|
NOT APPLICABLE
|
|
FILE FIRE PROTECTION PLAN AS SHOWN ON DRAWINGS FILED HEREWITH. IN
|
|
Work on Floor(s): CEL,ROF 001 thru 018
|
| 01/21/2009 |
110438535 |
01 |
A3 |
X SIGNED OFF |
02/27/2013 |
0079601 PE |
MCERLEAN |
|
NOT APPLICABLE
|
|
INSTALLATION OF A TWO SECTIONS OF PIPE SCAFFOLD ON THE 10TH AND 15TH FLOOR
|
|
Work on Floor(s): 010,015
|
| 12/01/2008 |
110418708 |
01 |
A2 |
X SIGNED OFF |
05/14/2009 |
0073548 PE |
GLICKMAN |
|
NOT APPLICABLE
|
|
PROPOSE TO INSTALL BOILER AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE I
|
|
Work on Floor(s): CEL
|
| 08/20/2008 |
110159541 |
03 |
A3 |
P APPROVED |
08/20/2008 |
|
STILLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/20/2008 |
110209024 |
01 |
A3 |
X SIGNED OFF |
06/25/2009 |
OT |
PANTANEL |
|
NOT APPLICABLE
|
|
INSTALLATION OF 75 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR NEW BUILDIN
|
|
Work on Floor(s): OSP
|
| 06/13/2008 |
110159541 |
02 |
A3 |
P APPROVED |
06/23/2008 |
|
STILLER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 05/06/2008 |
110159541 |
01 |
A3 |
X SIGNED OFF |
09/22/2009 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY
|
|
Work on Floor(s): OSP
|