| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 09/19/2018 |
120026444 |
02 |
A2 |
P APPROVED |
11/27/2018 |
0054476 PE |
LOCHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 006
|
| 12/04/2017 |
123116083 |
03 |
A1 |
P APPROVED |
12/05/2017 |
|
LIBASCI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2
|
| 09/06/2017 |
123116083 |
02 |
A1 |
P APPROVED |
09/07/2017 |
|
LIBASCI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2
|
| 08/16/2017 |
123116083 |
01 |
A1 |
X SIGNED OFF |
12/07/2017 |
0023066 RA |
LIBASCI |
|
NOT APPLICABLE
|
|
REVISING EXISTING C OF O. REMOVING RESTRICTION NOTE ON PARKING GARAGE, TO
|
|
Work on Floor(s): CEL,SC1,SC2
|
| 10/09/2013 |
103541936 |
12 |
NB |
P APPROVED |
10/17/2013 |
|
GOLDSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,ROF 001 thru 058
|
| 04/19/2013 |
103541936 |
11 |
NB |
P APPROVED |
05/01/2013 |
PE |
PIMENTEL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,SC1,SC2,ROF 001 thru 055
|
| 02/07/2012 |
120810872 |
01 |
A2 |
X SIGNED OFF |
05/01/2014 |
0075814 PE |
REITIENI |
|
NOT APPLICABLE
|
|
MODIFICATION TO EXISTING, APPROVED FIRE ALARM SYSTEM FILED IN CONJUNCTION
|
|
Work on Floor(s): 003,004,005
|
| 01/28/2010 |
103541936 |
10 |
NB |
P APPROVED |
02/09/2010 |
|
ROBBINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
| 12/21/2009 |
120230026 |
01 |
A3 |
R PERMIT-ENTIRE |
01/21/2010 |
0061718 PE |
GREENBLA |
|
NOT APPLICABLE
|
|
INSTALLATION OF 48'PIPE SCAFFOLDING. ALL AS PER PLAN. NO CHANGE IN USE,
|
|
Work on Floor(s): 001 thru 059
|
| 09/25/2009 |
103541936 |
09 |
NB |
P APPROVED |
09/29/2009 |
0027841 PE |
ROBBINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
| 07/01/2009 |
110301156 |
02 |
A2 |
P APPROVED |
07/02/2009 |
|
LEE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 003,004,005
|
| 05/04/2009 |
120026480 |
01 |
A2 |
J P/E DISAPPROVED |
07/10/2009 |
0076190 PE |
JOHN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/19/2011 INSTALL NEW SPRINKLER HEADS ON THE 6TH FLOOR. ALL
|
|
Work on Floor(s): 006
|
| 05/04/2009 |
120026444 |
01 |
A2 |
X SIGNED OFF |
11/27/2018 |
0054476 PE |
LOCHER |
|
NOT APPLICABLE
|
|
INSTALL FIRE ALARM SYSTEM ON THE 6TH FLOOR. ALL AS PER PLAN. NO CHANGE IN
|
|
Work on Floor(s): 006
|
| 02/05/2009 |
110192568 |
04 |
A2 |
P APPROVED |
02/06/2009 |
|
LUCZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 002
|
| 09/03/2008 |
110307098 |
01 |
A2 |
R PERMIT-ENTIRE |
12/01/2008 |
0084697 PE |
SIGALOS |
|
NOT APPLICABLE
|
|
INSTALLATION OF 80 SPRINKLER HEADS, 11 PL FIXTURES IN CONJ WITH NEW CONS 1
|
|
Work on Floor(s): 003,004,005
|
| 09/03/2008 |
110307089 |
01 |
A2 |
R PERMIT-ENTIRE |
09/17/2008 |
0084697 PE |
SIGALOS |
|
NOT APPLICABLE
|
|
INSTALLATION OF 28-TON OF AIR CONDITIONING IN CONJUNCTION WITH NEW CONSTRU
|
|
Work on Floor(s): 003,004,005
|
| 09/02/2008 |
103541936 |
08 |
NB |
P APPROVED |
05/19/2009 |
|
GOLDSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,ROF 001 thru 058
|
| 07/30/2008 |
110305740 |
01 |
A2 |
X SIGNED OFF |
05/01/2014 |
0075814 PE |
RITIENI |
|
NOT APPLICABLE
|
|
ADDITIONS TO FIRE ALARM SYSTEM FILED UNDER APPLICATION NUMBER 110144807. N
|
|
Work on Floor(s): 002
|
| 07/24/2008 |
110301156 |
01 |
A2 |
X SIGNED OFF |
05/06/2010 |
0024793 RA |
LEE |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION ONLY. TO ERECT NEW FULL HEIGHT PARTITIONS AND DOORS. A
|
|
Work on Floor(s): 003,004,005
|
| 07/14/2008 |
103541936 |
07 |
NB |
P APPROVED |
07/17/2008 |
|
GOLDSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,ROF 001 thru 058
|
| 04/29/2008 |
110192568 |
03 |
A2 |
X SIGNED OFF |
04/15/2009 |
0053178 PE |
DIAS |
|
NOT APPLICABLE
|
|
INSTALL NEW HVAC SYSTEM AND RELATED DUCT WORK ON PART OF SECOND FLOOR
|
|
Work on Floor(s): 002
|
| 04/29/2008 |
110192577 |
01 |
A2 |
X SIGNED OFF |
08/05/2009 |
0074163 PE |
LUCZAK |
|
NOT APPLICABLE
|
|
INSTALL NEW SPRINKLER HEADS IN SECOND FLOOR IN CONJUNCTION WITH THE CONSTR
|
|
Work on Floor(s): 002
|
| 04/25/2008 |
110192568 |
01 |
A2 |
X SIGNED OFF |
04/15/2009 |
0027583 RA |
LILL |
|
NOT APPLICABLE
|
|
CONSTRUCT PARTITIONS & HUNG CEILING FOR A NEW PRESCHOOL ON 2ND FLOOR. IN
|
|
Work on Floor(s): 002
|
| 04/25/2008 |
110192568 |
02 |
A2 |
X SIGNED OFF |
04/15/2009 |
0074163 PE |
LUCZAK |
|
NOT APPLICABLE
|
|
INSTALL NEW PLUMBING FIXTURES FOR PRE-SCHOOL FACILITIES AT 2ND FLOOR. ALL
|
|
Work on Floor(s): 002
|
| 04/21/2008 |
110144807 |
01 |
A2 |
X SIGNED OFF |
03/13/2012 |
0075814 PE |
RITIENI |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW FIRE ALARM SYSTEM FOR COMMERICAL SPACE. NO CHANGE IN U
|
|
Work on Floor(s): CEL 001 thru 007
|
| 04/03/2008 |
104592843 |
03 |
A2 |
P APPROVED |
04/07/2008 |
|
ROBBINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC2,SC1,CEL,ROF 001 thru 057
|
| 02/19/2008 |
110103600 |
01 |
A2 |
X SIGNED OFF |
12/15/2016 |
0076190 PE |
KOHLER |
|
NOT APPLICABLE
|
|
INSTALL NEW PLUMBING FIXTURES AND UPGRADE HVAC SYSTEM AT THE 6TH FLOOR, AL
|
|
Work on Floor(s): 006
|
| 02/15/2008 |
110093684 |
01 |
A2 |
X SIGNED OFF |
11/29/2016 |
0024567 RA |
MOSS |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION TO AN OFFICE SPACE ON THE 6TH FLOOR. MINOR GENERAL
|
|
Work on Floor(s): 006
|
| 11/23/2007 |
103541936 |
06 |
NB |
P APPROVED |
03/11/2008 |
0013416 RA |
GOLDSTEI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC1,SC2,ROF 001 thru 058
|
| 10/31/2007 |
104099645 |
04 |
A2 |
P APPROVED |
11/02/2007 |
0027841 PE |
ROBBINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC2
|
| 10/04/2007 |
104099645 |
03 |
A2 |
P APPROVED |
10/05/2007 |
0027841 PE |
ROBBINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC2
|
| 07/05/2007 |
103541936 |
05 |
NB |
P APPROVED |
07/06/2007 |
0027841 PE |
ROBBINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
| 06/29/2007 |
104099645 |
02 |
A2 |
P APPROVED |
07/02/2007 |
0027841 PE |
ROBBINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,SC2
|
| 06/26/2007 |
104592843 |
02 |
A2 |
P APPROVED |
06/28/2007 |
0027841 PE |
ROBBINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC2,SC1,CEL,ROF 001 thru 057
|
| 06/14/2007 |
103758462 |
02 |
A2 |
P APPROVED |
06/20/2007 |
0027841 PE |
ROBBINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 057
|
| 06/13/2007 |
104801868 |
01 |
A3 |
X SIGNED OFF |
12/28/2010 |
0079601 PE |
McERLEAN |
|
NOT APPLICABLE
|
|
INSTALL 2 POINT HANGING SCAFFOLD FOR WASHDOWN WITH ATTACED NETTING TO CATC
|
|
Work on Floor(s): ROF 001 thru 058
|
| 11/22/2006 |
104611706 |
01 |
A3 |
X SIGNED OFF |
12/28/2010 |
OT |
TANTILLO |
|
NOT APPLICABLE
|
|
WE SHALL INSTALL 110 FT X 85 FT HIGH OF PIPE SCAFFOLD. THIS SHALL BE USE F
|
|
Work on Floor(s): 001
|
| 11/21/2006 |
104593557 |
01 |
A2 |
X SIGNED OFF |
01/19/2011 |
0047135 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
INSTALL 2 NEW L.P. BOILERS COMBINATIONGAS/OIL BURNERS 1 NEW 20,000
|
|
Work on Floor(s): SUB
|
| 11/08/2006 |
104592843 |
01 |
A2 |
X SIGNED OFF |
05/03/2010 |
0027841 PE |
ROBBINS |
|
NOT APPLICABLE
|
|
INSTALL SPRINKLER SYSTEM IN CONJUNCTION WITH NB#103541936, ALL AS PER PLAN
|
|
Work on Floor(s): SC2,SC1,CEL,ROF 001 thru 057
|
| 07/11/2006 |
104486067 |
01 |
A3 |
P APPROVED |
09/27/2006 |
0013416 RA |
GOLDSTEI |
|
NOT APPLICABLE
|
|
FILING HEREWITH FIRE PROTECTION PLAN IN CONJUNCTION WITH THE CONSTRUCTION
|
|
Work on Floor(s): CEL,SC1,SC2,ROF 001 thru 057
|