| 01/06/2020 |
140882695 |
01 |
A2 |
D A/P ENTIRE |
01/06/2020 |
0031340 RA |
DIERIG |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 03/06/2020 RESPECTFULLY REQUEST TO COMBINE APARTMENTS 4 AND 5
|
|
Work on Floor(s): 4TH,5TH
|
| 04/10/2018 |
123441908 |
01 |
A2 |
X SIGNED OFF |
04/10/2019 |
0038061 RA |
BONOMO |
|
NOT APPLICABLE
|
|
MINOR INTERIOR RENOVATION OF FIRST FLOOR LOBBY AND FOYER. NO CHANGE TO
|
|
Work on Floor(s): 001
|
| 10/30/2013 |
120663077 |
11 |
A2 |
P APPROVED |
11/04/2013 |
|
SMERINA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,001,002
|
| 10/16/2013 |
120663077 |
10 |
A2 |
P APPROVED |
11/04/2013 |
|
SMERINA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002
|
| 09/09/2013 |
120663077 |
09 |
A2 |
P APPROVED |
09/10/2013 |
|
SMERINA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002
|
| 07/22/2013 |
121387178 |
03 |
A2 |
P APPROVED |
08/09/2013 |
|
KORNBLAU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 12/31/2012 |
121387178 |
02 |
A2 |
P APPROVED |
01/02/2013 |
|
KORNBLAU |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 09/21/2012 |
121387178 |
01 |
A2 |
X SIGNED OFF |
05/16/2014 |
0025619 RA |
KORNBLAU |
|
NOT APPLICABLE
|
|
CONSTRUCTION OF DENTAL OFFICE CONSISTING OF GENERAL CONSTRUCTION, PLUMBING
|
|
Work on Floor(s): 001
|
| 04/04/2012 |
120663077 |
08 |
A2 |
P APPROVED |
04/26/2012 |
|
SMERINA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002
|
| 02/07/2012 |
120663077 |
07 |
A2 |
P APPROVED |
02/09/2012 |
|
SMERINA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002
|
| 12/21/2011 |
120663077 |
06 |
A2 |
P APPROVED |
01/10/2012 |
|
SMERINA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,001,002
|
| 12/21/2011 |
120663077 |
05 |
A2 |
P APPROVED |
01/10/2012 |
|
SMERINA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002
|
| 06/23/2011 |
120663077 |
04 |
A2 |
P APPROVED |
08/01/2011 |
|
SMERINA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,002
|
| 04/27/2011 |
120663077 |
03 |
A2 |
X SIGNED OFF |
02/12/2014 |
0024616 RA |
SMERINA |
|
NOT APPLICABLE
|
|
SUBSEQUENT FILING FOR MECHANICAL AND SPRINKLER WORK TYPES. NO CHANGE TO U
|
|
Work on Floor(s): CEL,001,002
|
| 04/27/2011 |
120663077 |
02 |
A2 |
X SIGNED OFF |
02/12/2014 |
0086455 PE |
ALBANNA |
|
NOT APPLICABLE
|
|
FILING FOR STRUCTURAL WORK TO BE PERFORMED. NO HCANGE TO USE, EGRESS OR
|
|
Work on Floor(s): CEL,001,002
|
| 04/27/2011 |
120663077 |
01 |
A2 |
X SIGNED OFF |
02/12/2014 |
0024616 RA |
SMERINA |
|
NOT APPLICABLE
|
|
CREATE STAIR OPENING AT 2ND FLOOR FOR A VERTICAL CONNECTION TO AN EXISTING
|
|
Work on Floor(s): CEL,001,002
|
| 07/12/2010 |
120410224 |
01 |
A3 |
X SIGNED OFF |
12/01/2010 |
0021282 RA |
FISCHER |
|
NOT APPLICABLE
|
|
FILING FIRE PROTECTION PLAN
|
|
Work on Floor(s): CEL,ROF 001 thru 007
|
| 06/05/2009 |
104566989 |
08 |
NB |
P APPROVED |
06/09/2009 |
|
FISCHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,001,002,003,004 005 thru 007
|
| 05/01/2009 |
104566989 |
07 |
NB |
P APPROVED |
05/05/2009 |
|
FISCHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,001,002,003,004 005 thru 007
|
| 03/25/2009 |
110004469 |
03 |
A2 |
D A/P ENTIRE |
04/01/2009 |
|
SOROKKO |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 04/02/2009
|
|
Work on Floor(s): CEL, ROF 001 thru 007
|
| 02/13/2009 |
104566989 |
06 |
NB |
P APPROVED |
02/17/2009 |
|
FISCHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,001,002,003,004 005 thru 007
|
| 01/26/2009 |
104566989 |
05 |
NB |
P APPROVED |
01/27/2009 |
|
FISCHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,001,002,003,004 005 thru 007
|
| 11/06/2008 |
110381088 |
01 |
A2 |
X SIGNED OFF |
04/13/2010 |
0413691 PE |
SCHNABOL |
|
NOT APPLICABLE
|
|
INSTALL SPRINKLER ALARM SYSTEM WITH SMOKE DETECTORS AND CENTRAL STATION
|
|
Work on Floor(s): CEL,BUL 001 thru 007
|
| 06/17/2008 |
110019701 |
03 |
A2 |
P APPROVED |
06/18/2008 |
|
SOROKKO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 007
|
| 05/01/2008 |
104943224 |
01 |
SC |
U COMPLETED |
05/06/2008 |
0021282 RA |
FISCHER |
|
NOT APPLICABLE
|
|
FILING FOR CONDOMINIMUM SUBDIVISION.
|
|
Work on Floor(s): CEL,1-7
|
| 04/11/2008 |
110004469 |
02 |
A2 |
P APPROVED |
04/15/2008 |
|
SOROKKO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL, ROF 001 thru 007
|
| 04/11/2008 |
110019701 |
02 |
A2 |
P APPROVED |
04/15/2008 |
|
SOROKKO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 007
|
| 04/09/2008 |
104566989 |
04 |
NB |
P APPROVED |
04/15/2008 |
|
FISCHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,001,002,003,004 005 thru 007
|
| 01/07/2008 |
104566989 |
03 |
NB |
P APPROVED |
01/09/2008 |
0010287 RA |
Lombardi |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,001,002,003,004 005 thru 007
|
| 11/14/2007 |
110027934 |
01 |
A3 |
X SIGNED OFF |
10/13/2010 |
0021282 RA |
FISCHER |
|
NOT APPLICABLE
|
|
BPP FILING FOR 133.3' FRONTAGE
|
|
Work on Floor(s): GRD
|
| 11/09/2007 |
110019701 |
01 |
A2 |
X SIGNED OFF |
03/23/2009 |
0072800 PE |
SOROKKO |
|
NOT APPLICABLE
|
|
FILING FOR PLUMBING, MECHANICAL, BOILER. IN CONJUNCTION WITH NB JOB 1045
|
|
Work on Floor(s): CEL 001 thru 007
|
| 11/07/2007 |
104566989 |
02 |
NB |
P APPROVED |
11/15/2007 |
0021282 RA |
FISCHER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,001,002,003,004 005 thru 007
|
| 10/31/2007 |
110004469 |
01 |
A2 |
X SIGNED OFF |
01/21/2010 |
0072800 PE |
SOROKKO |
|
NOT APPLICABLE
|
|
FILING SP,SDIN CONJUNCTION WITH NB 104566989
|
|
Work on Floor(s): CEL, ROF 001 thru 007
|
| 09/18/2007 |
104902401 |
01 |
A3 |
X SIGNED OFF |
03/05/2009 |
0079601 PE |
MC ERLEA |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. NO CHANGE IN USE,
|
|
Work on Floor(s): OSP
|
| 07/23/2007 |
104838918 |
01 |
A3 |
J P/E DISAPPROVED |
07/23/2007 |
0068130 PE |
CHIFFERT |
|
NOT APPLICABLE
|
|
INSTALLATION OF HOIST SYSTEM INSIDE ELEVATOR SHAFT FOR MATERIAL HOISTING O
|
|
Work on Floor(s): OSP
|
| 05/09/2007 |
104758433 |
01 |
A2 |
J P/E DISAPPROVED |
05/11/2007 |
0057779 PE |
Athwal |
|
NOT APPLICABLE
|
|
Installation of combined sprinkler, standpipe, system with piping work for
|
|
Work on Floor(s): CEL,ROF,001,002,003,004 005 thru 006
|
| 05/08/2007 |
104752867 |
01 |
A2 |
J P/E DISAPPROVED |
05/11/2007 |
0057779 PE |
Athwal |
|
NOT APPLICABLE
|
|
Installation of boiler, mechanical, and plumbing system as shown on plans
|
|
Work on Floor(s): CEL,ROF,001,002,003,004 005 thru 006
|
| 03/28/2007 |
104717889 |
01 |
A3 |
X SIGNED OFF |
02/26/2009 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 110 FEET HIGH PIPE SCAFFOLD FOR NB CONSTRUCTION,
|
|
Work on Floor(s): OSP
|
| 03/28/2007 |
104717870 |
01 |
A3 |
X SIGNED OFF |
02/26/2009 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF OFFICE TRAILER ON EXISTING SIDEWALK SHED DURING NB
|
|
Work on Floor(s): OSP
|
| 02/27/2007 |
104683558 |
01 |
A3 |
X SIGNED OFF |
04/07/2009 |
0018466 RA |
WHITE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 150 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR N
|
|
Work on Floor(s): OSP
|