| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/09/2026 |
123358589 |
10 |
A2 |
G PAA FEE DUE |
01/09/2026 |
|
BRYCHTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BLK 001 thru 009
|
| 07/17/2025 |
123358589 |
09 |
A2 |
P APPROVED |
07/22/2025 |
|
BAFITIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,BLK 001 thru 009
|
| 03/11/2025 |
123358589 |
08 |
A2 |
P APPROVED |
03/13/2025 |
|
BRYCHTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BLK 001 thru 009
|
| 02/12/2025 |
123358589 |
07 |
A2 |
P APPROVED |
03/05/2025 |
|
BRYCHTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BLK 001 thru 009
|
| 02/07/2025 |
123358589 |
06 |
A2 |
P APPROVED |
02/11/2025 |
|
BAFITIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,BLK 001 thru 009
|
| 12/23/2024 |
123358589 |
05 |
A2 |
P APPROVED |
12/27/2024 |
0085042 PE |
BRYCHTA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BLK 001 thru 009
|
| 12/05/2023 |
123358589 |
04 |
A2 |
P APPROVED |
12/15/2023 |
0092336 PE |
BOZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BLK 001 thru 009
|
| 06/29/2022 |
122154417 |
08 |
A2 |
P APPROVED |
09/13/2022 |
|
BOZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS 001 thru 018
|
| 06/29/2022 |
122154417 |
07 |
A2 |
P APPROVED |
09/13/2022 |
|
ROUILLAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 018
|
| 06/22/2022 |
122154417 |
06 |
A2 |
P APPROVED |
06/23/2022 |
|
BOZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS 001 thru 018
|
| 05/20/2022 |
122154417 |
05 |
A2 |
P APPROVED |
05/26/2022 |
0092336 PE |
BOZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS 001 thru 018
|
| 05/13/2022 |
122154417 |
04 |
A2 |
P APPROVED |
05/26/2022 |
|
ROUILLAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 018
|
| 07/19/2019 |
140859417 |
01 |
A2 |
X SIGNED OFF |
09/28/2020 |
0058384 PE |
MILLMAN |
|
NOT APPLICABLE
|
|
BELLEVUE MEN'S SHELTER, FACADE STABILIZATION PROGRAM INCLUDING: TEMPORARY
|
|
Work on Floor(s): FAC
|
| 11/19/2018 |
140818701 |
01 |
A2 |
P APPROVED |
01/03/2019 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
UPGRADE LIGHTING AND LIGHTING CONTROLS ON 1ST AND 2ND FLOOR AS PER PLAN. N
|
|
Work on Floor(s): 001,002
|
| 09/14/2018 |
123201016 |
05 |
A2 |
P APPROVED |
10/23/2018 |
|
ACHESON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC,BAS 001 thru 010
|
| 09/07/2018 |
140800649 |
01 |
A2 |
D A/P ENTIRE |
09/07/2018 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 11/06/2018 UPGRADE LIGHTING AND LIGHTING CONTROLS ON 1ST AND
|
|
Work on Floor(s): 001,002
|
| 08/06/2018 |
123201016 |
04 |
A2 |
P APPROVED |
09/05/2018 |
|
ACHESON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 FACADE REPAIR AND WINDOW REPLACEMENT TO COM
|
|
Work on Floor(s): FAC,BAS 001 thru 010
|
| 05/08/2018 |
123358589 |
03 |
A2 |
R PERMIT-ENTIRE |
11/04/2019 |
0060728 PE |
SMILOW |
|
NOT APPLICABLE
|
|
INSTALL SUPPORTS FOR INSTALLATION OF NEW 4000 GAL TANK IN BASEMENT. NO CHA
|
|
Work on Floor(s): BSM,BLK 001 thru 009
|
| 05/08/2018 |
123358589 |
02 |
A2 |
R PERMIT-ENTIRE |
02/21/2020 |
0085042 PE |
BRYCHTA |
|
NOT APPLICABLE
|
|
INSTALL EMERGENCY GENERATOR AND DISTRIBUTION SYSTEM. INSTALL FUEL STORAGE
|
|
Work on Floor(s): CEL,BLK 001 thru 009
|
| 05/08/2018 |
123358589 |
01 |
A2 |
R PERMIT-ENTIRE |
05/10/2024 |
0017810 RA |
BAFITIS |
|
NOT APPLICABLE
|
|
INSTALL NEW EMERGENCY GENERATOR IN THE ROOF BULKHEAD ABOVE THE 9TH FLOOR.
|
|
Work on Floor(s): BAS,BLK 001 thru 009
|
| 05/08/2018 |
122705493 |
01 |
A2 |
J P/E DISAPPROVED |
08/09/2018 |
0072039 PE |
DELPOZZO |
|
NOT APPLICABLE
|
|
MODIFICATIONS/ADDITIONS TO EXISTING INTERIOR FIRE ALARM. INSTALLATION/REPL
|
|
Work on Floor(s): CEL,BAS 001 thru 010
|
| 04/02/2018 |
122995624 |
02 |
A2 |
P APPROVED |
04/03/2018 |
|
ACHESON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF,002,007,008
|
| 12/15/2017 |
123201016 |
03 |
A2 |
P APPROVED |
01/17/2018 |
0084196 PE |
GARDIOLI |
|
NOT APPLICABLE
|
|
PARTIAL REPLACEMENT OF LINTELS FOR SOME WINDOWS, BEAMS AND COLUMNS DUE TO
|
|
Work on Floor(s): BAS,FAC 001 thru 010
|
| 12/15/2017 |
123201016 |
02 |
A2 |
P APPROVED |
01/17/2018 |
0051416 PE |
FEINBERG |
|
NOT APPLICABLE
|
|
PARTIAL REPLACEMENT OF WATER, SANITARY, VENTING.PIPING. REMOVE PLUMBING FI
|
|
Work on Floor(s): FAC,BAS 001 thru 010
|
| 12/15/2017 |
123201016 |
01 |
A2 |
P APPROVED |
01/17/2018 |
0015257 RA |
ACHESON |
|
NOT APPLICABLE
|
|
FACADE REPAIR AND WINDOW REPLACEMENT TO COMPLY WITH REQUIREMENTS OF
|
|
Work on Floor(s): FAC,BAS 001 thru 010
|
| 05/02/2017 |
122995624 |
01 |
A2 |
P APPROVED |
06/22/2017 |
0015257 RA |
ACHESON |
|
NOT APPLICABLE
|
|
ADD METAL RAILING TO PRAPETS AT 3'6" ABOVE FINISHED ROOF AT END, 7TH AND 8
|
|
Work on Floor(s): ROF,002,007,008
|
| 03/29/2017 |
140601980 |
01 |
A2 |
X SIGNED OFF |
11/18/2019 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
UPGRADE BUILDING HEATING SERVICE EQUIPMENT CONTROLS AND LIGHTING SENSORS A
|
|
Work on Floor(s): CEL,BAS 001 thru 009
|
| 01/06/2017 |
140592543 |
01 |
A2 |
D A/P ENTIRE |
01/06/2017 |
0058375 PE |
MASS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/02/2017 UPGRADE BUILDING MECHANICAL EQUIPMENT IN ACCORDAN
|
|
Work on Floor(s): CEL,BAS 001 thru 009
|
| 09/22/2016 |
140553844 |
01 |
A3 |
X SIGNED OFF |
05/11/2018 |
0039888 PE |
BUTTERFI |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD 384'-0" LONG AND 90'-0" HIGH ON GRADE, GRATI
|
|
Work on Floor(s): OSP
|
| 04/19/2016 |
140485044 |
01 |
A3 |
X SIGNED OFF |
05/21/2018 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD 194'-0" LONG AND 30'-0" HIGH ON MAIN ROOF AS
|
|
Work on Floor(s): OSP
|
| 12/11/2015 |
140440119 |
01 |
A3 |
R PERMIT-ENTIRE |
02/07/2017 |
0035839 RA |
O'CONNOR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 03/27/2015 |
122154417 |
03 |
A2 |
X SIGNED OFF |
10/20/2022 |
0092336 PE |
BOZ |
|
NOT APPLICABLE
|
|
NEW AC SYSTEM FOR ELEVATOR. NEW LOUVERS IN HOISTWAY. REPLACE ROOF DRAINS.
|
|
Work on Floor(s): CEL,BAS 001 thru 018
|
| 03/27/2015 |
122154417 |
02 |
A2 |
X SIGNED OFF |
10/20/2022 |
0060728 PE |
SMILOW |
|
NOT APPLICABLE
|
|
REPAIRS TO ELEVATOR SHAFT AND BULKHEAD. NO CHANGE TO UES, EGRESS OR OCCUPA
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 018
|
| 10/02/2014 |
122154417 |
01 |
A2 |
X SIGNED OFF |
10/20/2022 |
0033619 RA |
ROUILLAR |
|
NOT APPLICABLE
|
|
RENOVATION OF EXISTING BELLEVUE MEN'S SHELTER ELEVATOR BANK. REPAIR OF
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 018
|
| 10/02/2014 |
122152589 |
01 |
A2 |
R PERMIT-ENTIRE |
03/15/2016 |
0072039 PE |
DELPOZZO |
|
NOT APPLICABLE
|
|
ADDITIONS/MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM.
|
|
Work on Floor(s): ROF,BAS,009
|
| 05/29/2014 |
122023684 |
01 |
A2 |
P APPROVED |
10/16/2014 |
0071737 PE |
PEDRO |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR REMOVING AND REPLACING WATER TANK AND BACKFLOW AS PER
|
|
Work on Floor(s): PH
|
| 02/03/2014 |
121842541 |
02 |
A2 |
R PERMIT-ENTIRE |
02/13/2015 |
0093068 PE |
PEDRO |
|
NOT APPLICABLE
|
|
RELATED MECHANICAL ON FIRST FLOOR. RELATED PLUMBING ON FIRST FLOOR, BASEME
|
|
Work on Floor(s): 1FL,BAS,RF
|
| 02/03/2014 |
121842541 |
01 |
A2 |
R PERMIT-ENTIRE |
04/25/2019 |
0093068 PE |
PEDRO |
|
NOT APPLICABLE
|
|
HEREWITH FILING FOR INTERIOR RENOVATION OF 1ST FLOOR. REMOVE AND REPLACE
|
|
Work on Floor(s): 001,RF
|
| 02/03/2014 |
121842603 |
01 |
A2 |
J P/E DISAPPROVED |
10/05/2015 |
0088199 PE |
BONDAR |
|
NOT APPLICABLE
|
|
LEGALIZE THEEXISTING SYSTEM. NO CHANGE IN USE EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): SUB,BAS 001 thru 009
|
| 01/26/2012 |
120923885 |
01 |
A3 |
R PERMIT-ENTIRE |
01/26/2012 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 32 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|