 |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
| 06/20/2018 |
123244300 |
PR |
I LAA SIGNED OFF |
01/08/2019 |
FSC 000858 |
LOVETRO |
|
IN APT #1160M ON THE 11TH FLOOR REARRANGE (6) SPRINKLER HEADS AND RUN APPR
|
|
Work on Floor(s): 011
|
| 08/22/2017 |
140684962 |
PR |
I LAA SIGNED OFF |
03/27/2018 |
MP 001884 |
NATKANIE |
|
REPLACE SHOWER BODY IN THE SHOWER AND THE BATHTUB, REPLACE LAVATORY AND WA
|
|
Work on Floor(s): 007
|
| 03/04/2015 |
140317510 |
PR |
E LAA FILED |
03/04/2015 |
MP 000825 |
TERDOSLA |
|
JOB CLOSED 04 25 2023
|
|
Work on Floor(s): 6TH
|
| 08/12/2014 |
140239846 |
PR |
E LAA FILED |
08/12/2014 |
FSC 000926 |
LOVETRO |
|
JOB CLOSED 02 12 2019
|
|
Work on Floor(s): 011
|
| 02/28/2014 |
140168226 |
PR |
I LAA SIGNED OFF |
08/13/2014 |
FSC 000288 |
LEVINE |
|
ADD 1 SPRINKLER HEAD & RE-ARRANGE 2 SPRINKLER HEADS
|
|
Work on Floor(s): 011 thru 012
|
| 08/28/2013 |
140110822 |
PR |
E LAA FILED |
08/28/2013 |
FSC 000431 |
PIPERAKI |
|
JOB CLOSED 09 23 2022
|
|
Work on Floor(s): 007
|
| 02/25/2013 |
140057854 |
PR |
I LAA SIGNED OFF |
06/04/2013 |
MP 000954 |
MULLIGAN |
|
INSTALL APPROX. 60 FT. OF 1/2" COPPER L TUBING FOR NEW HOSE CONNECTION ON
|
| 02/28/2011 |
110531283 |
PR |
I LAA SIGNED OFF |
03/21/2011 |
MP 002125 |
TSAMOS |
|
IN APARTMENT 5B ON THE 5TH. FLOOR, REMOVE AND CAP WATER AND WASTE LINES FO
|
|
Work on Floor(s): 005
|
| 10/05/2009 |
110488179 |
PR |
I LAA SIGNED OFF |
02/12/2010 |
FSC 000356 |
DISABATO |
|
REARRANGEMENT OF 5 SPRINKLER HEADS IN EX'G APT OFF EX'G FIRE SPRINKLER SER
|
|
Work on Floor(s): 032
|
| 06/10/2009 |
110268451 |
PR |
E LAA FILED |
06/10/2009 |
MP 001874 |
MOSSA |
|
JOB CLOSED 12 07 2022 2008,REARRANGEMENT OF 5 SPRINKLER HEADS OFF DOMESTIC
|
|
Work on Floor(s): 032
|
| 11/13/2007 |
102419018 |
PR |
I LAA SIGNED OFF |
04/19/2010 |
MP 000646 |
MARTINO |
|
PROVIDING TEMP HEAT FROM NOV.,1 2007 THRU MARCH 30,2008, USING 182 SALAMAN
|
|
Work on Floor(s): CEL,001,002,003,004,005 006 thru 033
|