| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 06/06/2019 |
123860385 |
01 |
A2 |
P APPROVED |
09/09/2019 |
0081708 PE |
SABIR |
|
NOT APPLICABLE
|
|
MINOR REPAIRS TO THE FACADE, A NEW ROOF MEMBRANE, A NEW LAYER OF GRAVEL B
|
|
Work on Floor(s): OSP,ROF
|
| 09/04/2015 |
140335180 |
02 |
A2 |
P APPROVED |
09/08/2015 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 05/14/2015 |
140341583 |
01 |
A2 |
P APPROVED |
06/30/2015 |
0081708 PE |
SABIR |
|
NOT APPLICABLE
|
|
MINOR REPAIRS TO THE FACADE, A NEW ROOF MEMBRANE, A NEW LAYER OF GRAVEL B
|
|
Work on Floor(s): OSP,ROF
|
| 04/16/2015 |
140335180 |
01 |
A2 |
R PERMIT-ENTIRE |
04/22/2015 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE MODULAR BOILER WITH (2) GAS-FIRED BOILERS AND ONE INDIRECT HOT WAT
|
|
Work on Floor(s): CEL
|
| 04/15/2015 |
140334733 |
01 |
A2 |
Q PERMIT-PARTIAL |
04/17/2015 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/21/2015 REPLACE MODULAR BOILER WITH (2) GAS-FIRED BOILERS
|
|
Work on Floor(s): CEL
|
| 04/08/2015 |
140331415 |
01 |
A3 |
R PERMIT-ENTIRE |
04/10/2015 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
| 03/20/1995 |
100749451 |
06 |
NB |
P APPROVED |
03/30/1995 |
0055148 PE |
MUNOZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL 1 thru 6
|
| 02/22/1995 |
100749451 |
05 |
NB |
P APPROVED |
03/10/1995 |
0008931 RA |
GORDON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 1 thru 6
|
| 02/10/1995 |
100985739 |
01 |
A2 |
R PERMIT-ENTIRE |
03/09/1995 |
0055148 PE |
MUNOZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF DRY STANDPIPE SYSTEM AS PER PLANS
|
|
Work on Floor(s): 1 thru 6
|
| 12/27/1994 |
100749451 |
04 |
NB |
P APPROVED |
02/07/1995 |
0008931 RA |
GORDON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 1 thru 6
|
| 02/28/1994 |
100749451 |
03 |
NB |
R PERMIT-ENTIRE |
03/22/1994 |
0055148 PE |
MUNOZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF PLUMBING MECHANICAL AND HEATING SYSTEM IN NEW 6
|
|
Work on Floor(s): CEL 1 thru 6
|
| 02/18/1994 |
100785394 |
01 |
A2 |
R PERMIT-ENTIRE |
02/09/1995 |
0055148 PE |
MUNOZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF SPRINKLER HEADS IN NEW 6 STORY BUILDING, AS PER PLANS
|
|
Work on Floor(s): CEL 1 thru 6
|
| 02/18/1994 |
100785376 |
01 |
A2 |
J P/E DISAPPROVED |
02/22/1994 |
0055148 PE |
MUNOZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF FIRE ALARM SYSTEM IN NEW 6 STORY BUILDING,AS PER PLAN
|
|
Work on Floor(s): CEL 1 thru 6
|
| 12/15/1993 |
100749451 |
02 |
NB |
R PERMIT-ENTIRE |
03/11/1994 |
0041607 PE |
CALLENDE |
|
NOT APPLICABLE
|
|
FILED HEREWITH ARE STRUCTURAL DRAWINGS FOR EXCAVATION, FOUNDATION AND
|
|
Work on Floor(s): CLR,1ST,THR,6TH
|
| 12/15/1993 |
100749451 |
01 |
NB |
R PERMIT-ENTIRE |
01/23/1995 |
0008931 RA |
GORDON |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL 1 thru 6
|