 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/14/2019 |
123860376 |
01 |
A2 |
P APPROVED |
08/07/2019 |
0081708 PE |
SABIR |
|
NOT APPLICABLE
|
|
THE SCOPE OF WORK INCLUDES MINOR REPAIRS TO THE FA?ADE, A NEW LAYER OF GRA
|
|
Work on Floor(s): OSP,ROF
|
| 05/03/2018 |
140763038 |
01 |
A2 |
P APPROVED |
05/07/2018 |
0083397 PE |
PEREZ |
|
NOT APPLICABLE
|
|
MINOR PLUMBING WORK TO INSTALL A NEW BATHROOM ON THE FIRST FLOOR FOR THE
|
|
Work on Floor(s): 1ST
|
| 09/10/2015 |
140334779 |
02 |
A2 |
P APPROVED |
09/11/2015 |
|
BAZINI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 05/14/2015 |
140341574 |
01 |
A2 |
P APPROVED |
07/14/2015 |
0081708 PE |
SABIR |
|
NOT APPLICABLE
|
|
THE SCOPE OF WORK INCLUDES MINOR REPAIRS TO THE FACADE, A NEW LAYER OF GR
|
|
Work on Floor(s): OSP,ROF
|
| 04/15/2015 |
140334779 |
01 |
A2 |
R PERMIT-ENTIRE |
04/22/2015 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE MODULAR BOILER WITH (2) GAS-FIRED BOILERS AND ONE INDIRECT HOT WAT
|
|
Work on Floor(s): CEL
|
| 04/08/2015 |
140331308 |
01 |
A3 |
R PERMIT-ENTIRE |
04/10/2015 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|