| | | | | | | | | |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
02/27/2020 |
123121709 |
02 |
A1 |
P APPROVED |
03/10/2020 |
|
MIDDLETO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
09/19/2018 |
123121709 |
01 |
A1 |
R PERMIT-ENTIRE |
04/30/2021 |
0023085 RA |
MIDDLETO |
|
NOT APPLICABLE
|
|
INSTALLATION OF ONE (1) NEW ACCESSORY USE LAUNDRY ROOM ALSO INCLUDING TENA
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
06/19/2015 |
122412889 |
01 |
A2 |
X SIGNED OFF |
09/15/2016 |
0019465 RA |
BUKSBAUM |
|
NOT APPLICABLE
|
|
PARTITION AND FINISH WORK FOR INTERIOR RENOVATION AT APARTMENT 3W. RELATED
|
|
Work on Floor(s): 003
|
02/08/2013 |
121529836 |
01 |
A2 |
X SIGNED OFF |
09/20/2013 |
0026692 RA |
GILLEN |
|
NOT APPLICABLE
|
|
RENOVATION OF AN EXISTING APARTMENT 5R ON THE 5TH FLOOR OF A RESIDENTIAL
|
|
Work on Floor(s): 005
|
06/20/2011 |
120731093 |
01 |
A2 |
X SIGNED OFF |
07/10/2013 |
0032365 RA |
KIM |
|
NOT APPLICABLE
|
|
INSTALLING ROOF DECK AND FENCE WITH CONCRETE PAVERS AND WOOD ELEMENTS NOT
|
|
Work on Floor(s): ROF
|
07/14/2009 |
120102842 |
01 |
A3 |
R PERMIT-ENTIRE |
07/14/2009 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED A TOTAL OF 30 L.F. AS PER PLAN AT
|
|
Work on Floor(s): OSP
|
11/08/2007 |
110015171 |
01 |
A2 |
X SIGNED OFF |
09/22/2008 |
0018280 RA |
Kemeny |
|
NOT APPLICABLE
|
|
Renovate apt No. 3R. Partition changes, related plumbing and finish work.
|
|
Work on Floor(s): 003
|