| | | | | | | |
FILE DATE |
JOB # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
12/19/2017 |
140726123 |
PR |
I LAA SIGNED OFF |
12/21/2018 |
FSC 000097 |
LEVINE |
|
INSTALL (4) NEW SPRINKLER HEADS WITH APPROX. 20' OF 1" SCHEDULE 40 BLACK P
|
|
Work on Floor(s): 031
|
09/13/2017 |
140694023 |
PR |
E LAA FILED |
09/13/2017 |
MP 002255 |
FERRARI |
|
IN APARTMENT 12A ON THE 12TH FLOOR WE WILL REPLACE 2 EXISTING PLUMBING FIX
|
|
Work on Floor(s): 012
|
06/01/2017 |
140650383 |
PR |
I LAA SIGNED OFF |
04/11/2018 |
FSC 001043 |
MOONEY |
|
REARRANGE (7) SPRINKLER HEADS CONSISTING OF APPROXIMATLY 21' OF 1" SPRINKL
|
|
Work on Floor(s): CON
|
12/14/2015 |
140440583 |
PR |
I LAA SIGNED OFF |
06/27/2016 |
FSC 000177 |
BOWER |
|
INSTALLATION OF (3) NEW SPRINKLER HEADS ON THE 23RD FLOOR IN TISHMAN SPEYE
|
|
Work on Floor(s): 023
|
07/21/2011 |
110552526 |
PR |
I LAA SIGNED OFF |
12/02/2011 |
FSC 000208 |
BOWE |
|
ADDITIONAL OF 1 SPRINKLER HEAD AND A REPLACEMENT OF 1 SPRINKLER HEAD ON TH
|
|
Work on Floor(s): 021
|
03/04/2009 |
110262322 |
PR |
I LAA SIGNED OFF |
06/04/2009 |
FSC 000208 |
BOWE |
|
1968-REARRANGE (4) SPRINKLER HEADS ON THE 6TH FL
|
|
Work on Floor(s): 006
|
07/20/1995 |
101067952 |
PR |
I LAA SIGNED OFF |
08/21/1995 |
MP 000531 |
SHERIDAN |
|
REMOVE DRINKING FOUNTAIN- CUT & CAP WASTE & VENT PIPING ON THE SECOND FLOO
|
|
Work on Floor(s): 2FL
|
04/05/1995 |
100930717 |
PR |
E LAA FILED |
04/05/1995 |
MP 000195 |
BLOCK |
|
GAS PIPING FOR COOKING ONLY FOR RESTAURANT
|
|
Work on Floor(s): GRO
|