 |  |  |  |  |  |  |  |  |  |
FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
07/07/2020 |
121636998 |
03 |
A2 |
D A/P ENTIRE |
10/28/2020 |
|
ROSENTHA |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 12/02/2020
|
|
Work on Floor(s): CEL,001
|
11/04/2019 |
122122666 |
05 |
A2 |
P APPROVED |
11/25/2019 |
|
GUALTIER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
06/28/2019 |
123777788 |
01 |
A2 |
J P/E DISAPPROVED |
07/15/2019 |
0076598 PE |
NAOUM |
|
NOT APPLICABLE
|
|
MECHANICAL, PLUMBING, AND SPRINKLER WORK AS SHOWN ON PLANS FILED HEREWITH.
|
|
Work on Floor(s): CEL,001,MEZ,PH, ROF 002 thru 005
|
06/28/2019 |
122122666 |
04 |
A2 |
P APPROVED |
07/16/2019 |
|
GUALTIER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
06/28/2019 |
123777788 |
02 |
A2 |
J P/E DISAPPROVED |
07/15/2019 |
0078489 PE |
LO |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK FILED IN CONJUNCTION WITH VERTICAL ENLARGEMENT FILED UNDER
|
|
Work on Floor(s): PH, ROF,OSP
|
03/14/2019 |
122122666 |
03 |
A2 |
P APPROVED |
03/21/2019 |
|
GUALTIER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
02/13/2019 |
122122666 |
02 |
A2 |
P APPROVED |
02/26/2019 |
|
GUALTIER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,OSP,RF
|
11/14/2018 |
121636998 |
02 |
A2 |
P APPROVED |
11/15/2018 |
0065567 PE |
ROSENTHA |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 12/02/2020
|
|
Work on Floor(s): CEL,001
|
05/03/2018 |
123431937 |
01 |
A2 |
R PERMIT-ENTIRE |
12/12/2018 |
0076598 PE |
NAOUM |
|
NOT APPLICABLE
|
|
APPLICATION FILED FOR PLUMBING WORK AS SHOWN ON PLANS FILED HEREWITH.
|
|
Work on Floor(s): CEL 001 thru 005
|
11/14/2017 |
110177166 |
05 |
A2 |
P APPROVED |
11/27/2017 |
|
HO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
08/11/2016 |
110177166 |
04 |
A2 |
P APPROVED |
08/30/2016 |
|
HO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
07/14/2016 |
122831999 |
01 |
A3 |
X SIGNED OFF |
05/18/2017 |
0086064 PE |
BRAY |
|
NOT APPLICABLE
|
|
MODIFICATION TO EXISTING TELECOMMUNICATIONS SITE. REPLACE ANTENNAS AND IN
|
|
Work on Floor(s): ROF
|
05/31/2016 |
122272539 |
04 |
A2 |
P APPROVED |
06/02/2016 |
|
LUCZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL
|
05/02/2016 |
110177166 |
03 |
A2 |
P APPROVED |
06/10/2016 |
|
HO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
04/29/2016 |
122272539 |
03 |
A2 |
P APPROVED |
05/19/2016 |
|
LUCZAK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL
|
07/06/2015 |
122455182 |
01 |
A3 |
J P/E DISAPPROVED |
12/10/2015 |
0086064 PE |
BRAY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/07/2016 MODIFICATION TO EXISTING TELECOMMUNICATION SITE.
|
|
Work on Floor(s): ROF,FAC
|
07/05/2015 |
140370943 |
01 |
A3 |
X SIGNED OFF |
01/11/2016 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAI
|
|
Work on Floor(s): OSP
|
05/13/2015 |
122272539 |
02 |
A2 |
X SIGNED OFF |
02/26/2018 |
0074163 PE |
LUCZAK |
|
NOT APPLICABLE
|
|
PLUMBING WORK IN CONJUNCTION WITH INITIAL FILING.
|
|
Work on Floor(s): CEL
|
02/18/2015 |
122272539 |
01 |
A2 |
X SIGNED OFF |
02/26/2018 |
0074163 PE |
LUCZAK |
|
NOT APPLICABLE
|
|
FILING SPRINKLER&PLUMBING APLICATION IN ACCORDANCE WITH BUILDING BULLETIN
|
|
Work on Floor(s): CEL,MEZ,ROF,OSP 001 thru 005
|
09/05/2014 |
122122675 |
01 |
A3 |
X SIGNED OFF |
05/09/2018 |
0071249 PE |
GUALTIER |
|
NOT APPLICABLE
|
|
INSTALL NEW TELECOMMUNICATIONS CABINETS, RELATED DUNNAGE AND RELATED ANTEN
|
|
Work on Floor(s): RF
|
09/05/2014 |
122122666 |
01 |
A2 |
R PERMIT-ENTIRE |
01/16/2018 |
0071249 PE |
GUALTIER |
|
NOT APPLICABLE
|
|
INSTALL NON-EMERGENCY GAS GENERATOR ON THE ROOF. RELATED PLUMBING IN BASEM
|
|
Work on Floor(s): CEL,ROF 001 thru 005
|
03/05/2014 |
121937976 |
01 |
A2 |
X SIGNED OFF |
11/12/2014 |
0076598 PE |
NAOUM |
|
NOT APPLICABLE
|
|
MECHANICAL WORK AS SHOWN ON PLANS FILED
|
|
Work on Floor(s): 001,MEZ
|
01/23/2014 |
121689841 |
02 |
A3 |
P APPROVED |
01/29/2014 |
|
KRAFFT |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF,FAC
|
07/31/2013 |
121725106 |
01 |
A2 |
X SIGNED OFF |
11/17/2015 |
0071502 PE |
FISHER |
|
NOT APPLICABLE
|
|
FILE FOR THE LEGALIZATION OF THE EXISTING INDIVIDUALLY CODED IFA WITH SMOK
|
|
Work on Floor(s): CEL,001,MEZ,ROF 002 thru 005
|
06/20/2013 |
121689841 |
01 |
A3 |
X SIGNED OFF |
05/20/2014 |
0080438 PE |
KRAFFT |
|
NOT APPLICABLE
|
|
REMOVAL OF EXISTING TELECOMMUNICATIONS SHELTER ON ROOF. REMOVAL OF RELATE
|
|
Work on Floor(s): ROF,FAC
|
05/31/2013 |
121636998 |
01 |
A2 |
R PERMIT-ENTIRE |
02/09/2018 |
0065567 PE |
ROSENTHA |
|
NOT APPLICABLE
|
|
PLUMBING, SPRINLER WORK AS SHOWN ON PLANS FILED
|
|
Work on Floor(s): CEL,001
|
07/19/2012 |
121156701 |
01 |
A2 |
X SIGNED OFF |
11/12/2014 |
0023195 RA |
WOOD |
|
NOT APPLICABLE
|
|
BAY WINDOW REPAIRS AS SHOWN ON PLANS FILED HEREWITH
|
|
Work on Floor(s): 001
|
|
121142263 |
01 |
A2 |
A PRE-FILED |
07/19/2012 |
0023195 RA |
WOOD |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/25/2013 BAY WINDOW REPAIRS AS SHOWN ON PLANS FILED HEREWI
|
|
Work on Floor(s): 001
|
07/08/2010 |
120354874 |
02 |
A2 |
P APPROVED |
07/15/2010 |
|
KATZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
05/20/2010 |
120354874 |
01 |
A2 |
X SIGNED OFF |
10/07/2013 |
0013529 RA |
KATZ |
|
NOT APPLICABLE
|
|
UPGRADING FIRE SUPPRESSION SYSTEM, NO CHANGE IN USE EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): 001
|
03/04/2010 |
120278813 |
01 |
A2 |
X SIGNED OFF |
05/16/2014 |
0038991 PE |
JOSELOW |
|
NOT APPLICABLE
|
|
HEREWITH FILING INSTALLATION OF NEW PLUMBING FIXTURES IN CONJUNCTION WITH
|
|
Work on Floor(s): BAS
|
08/14/2009 |
120129066 |
01 |
A2 |
X SIGNED OFF |
06/04/2014 |
0023195 RA |
WOOD |
|
NOT APPLICABLE
|
|
RESPECTFULLY FILING ALT II APPLICATION FOR COMMUNITY KITCHEN, WITH PLUMBIN
|
|
Work on Floor(s): 001
|
02/23/2009 |
110459904 |
01 |
A2 |
X SIGNED OFF |
11/09/2011 |
0013529 RA |
KATZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE IN USE, EGRESS OR
|
|
Work on Floor(s): CEL
|
09/18/2008 |
110177166 |
02 |
A2 |
P APPROVED |
04/15/2016 |
|
GIANNOPO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
05/22/2008 |
110177166 |
01 |
A2 |
X SIGNED OFF |
01/30/2018 |
0025149 RA |
HO |
|
NOT APPLICABLE
|
|
INSTALL NEW KITCHEN EQUIPMNT EXHAUST SYSTEM ,PLUMBING (4)SP
|
|
Work on Floor(s): 001
|
08/30/2002 |
103252150 |
01 |
A2 |
X SIGNED OFF |
03/31/2004 |
0079612 PE |
TARDY |
|
NOT APPLICABLE
|
|
INSTALLATION OF TELECOMMUNICATION CABINETS ON DUNNAGE PLATFORM ON
|
|
Work on Floor(s): ROF,FAC
|
12/06/2001 |
103052722 |
01 |
A2 |
R PERMIT-ENTIRE |
12/06/2001 |
0073350 PE |
Levin |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/14/2014 Installation of fire alarm system throughout buil
|
|
Work on Floor(s): 001 thru 005
|
10/22/2001 |
103001626 |
01 |
A2 |
X SIGNED OFF |
02/15/2002 |
0078350 PE |
KNOWLTON |
|
NOT APPLICABLE
|
|
INSTALLING TELECOMMUNICATIONS CABINETS W ITH HVAC, RELATED DUNNAGE & REL
|
|
Work on Floor(s): ROF
|
11/27/2000 |
102784952 |
01 |
A2 |
X SIGNED OFF |
04/03/2009 |
0010736 RA |
TERZIS |
|
NOT APPLICABLE
|
|
INSTALLATION OF FIRE SUPPRESSION SYSTEM AS PER PLAN. NO CHANGE IN USE,
|
|
Work on Floor(s): CEL
|
07/22/1998 |
101575528 |
02 |
A2 |
P APPROVED |
08/26/1998 |
0010736 RA |
TERZIS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|