| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 02/10/2017 |
140343910 |
02 |
A3 |
P APPROVED |
02/24/2017 |
|
PHAGOO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/05/2016 |
140504648 |
01 |
A3 |
X SIGNED OFF |
02/15/2017 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 1011'-0" HEAVY-DUTY SIDEWALK SHED AS INDICATED ON PLANS. T
|
|
Work on Floor(s): OSP
|
| 11/05/2015 |
140425485 |
01 |
A3 |
X SIGNED OFF |
11/14/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD 57'-0" LONG AND 150'-0" HIGH ON BOILER ROOM
|
|
Work on Floor(s): OSP
|
| 07/23/2015 |
140380317 |
01 |
A3 |
X SIGNED OFF |
06/15/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD 200'-0" LONG AND 20'-0" HIGH ON MAIN ROOF AS
|
|
Work on Floor(s): ROF
|
| 05/25/2015 |
140352204 |
01 |
A3 |
X SIGNED OFF |
02/07/2017 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 1009'-0" HEAVY-DUTY SIDEWALK SHED AS INDICATED ON PLANS. T
|
|
Work on Floor(s): OSP
|
| 05/05/2015 |
140343910 |
01 |
A3 |
X SIGNED OFF |
02/24/2017 |
0089587 PE |
PHAGOO |
|
NOT APPLICABLE
|
|
INSTALLATION OF (+/-) 1266 L.FT TEMPORARY CONSTRUCTION FENCE AS INDICATED
|
|
Work on Floor(s): OSP
|
| 11/26/2014 |
140147730 |
02 |
A2 |
P APPROVED |
08/18/2015 |
|
MILLMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): FAC
|
| 12/26/2013 |
140147730 |
01 |
A2 |
X SIGNED OFF |
12/12/2016 |
0058384 PE |
MILLMAN |
|
NOT APPLICABLE
|
|
JEFFERSON BLDG # 01, FACADE & ROOFING RESTORATION AS PER THE PLANS FILED.
|
|
Work on Floor(s): FAC
|
| 11/17/2009 |
120205009 |
01 |
A3 |
X SIGNED OFF |
01/25/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
POINTING, BRICK REPLACEMENT, CRACK FILL AS NEEDED, WORK SHALL COMPLY WITH
|
|
Work on Floor(s): OSP
|
| 09/29/2009 |
120165481 |
01 |
A3 |
X SIGNED OFF |
06/07/2011 |
0066791 PE |
PARIHAR |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIR
|
|
Work on Floor(s): OSP
|
| 10/23/2008 |
104739954 |
04 |
A2 |
P APPROVED |
10/24/2008 |
|
NARAGHI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 02/07/2008 |
104739954 |
03 |
A2 |
P APPROVED |
04/03/2008 |
0075800 PE |
NARAGHI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL
|
| 05/01/2007 |
104739954 |
02 |
A2 |
X SIGNED OFF |
03/18/2011 |
0075800 PE |
NARAGHI |
|
NOT APPLICABLE
|
|
FILING PLANS TO CUT NEW ROOF OPENING TO REMOVE OLD BOILER AND INSTALL NEW
|
| 04/17/2007 |
104739954 |
01 |
A2 |
X SIGNED OFF |
03/18/2011 |
0075800 PE |
NARAGHI |
|
NOT APPLICABLE
|
|
Rermoval of existing gas piping from meter room to the existing boilers.
|
|
Work on Floor(s): CEL
|
| 06/02/2006 |
104452138 |
01 |
A2 |
R PERMIT-ENTIRE |
03/06/2007 |
0046016 PE |
Castella |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/12/2011 Installation of non-gas Instantaneous Domestic Ho
|
|
Work on Floor(s): CEL
|
| 05/30/2006 |
104445646 |
01 |
A3 |
R PERMIT-ENTIRE |
06/01/2006 |
0077036 PE |
MOHAMMAD |
|
NOT APPLICABLE
|
|
WE SHALL INSTALL 4000 SQF OF HEAVY-DUTY PIPE SCAFFOLDING AROUND CHIMNEY OF
|
|
Work on Floor(s): 001 thru 014
|
| 05/24/2006 |
104444282 |
01 |
A3 |
X SIGNED OFF |
03/20/2007 |
0017617 RA |
JAMIL |
|
NOT APPLICABLE
|
|
INSTALLATION OF 200 L.F. TEMPORARY SIDEWALK SHED FOR FACADE WORK. NO CHANG
|
|
Work on Floor(s): 001
|
| 09/17/2004 |
103925601 |
01 |
A3 |
X SIGNED OFF |
04/04/2007 |
OT |
Kaur |
|
NOT APPLICABLE
|
|
Installation of 200 linear feet of light duty sidewalk shed for waterproof
|
|
Work on Floor(s): 001
|
| 12/04/2003 |
103632650 |
01 |
A3 |
X SIGNED OFF |
03/27/2007 |
0000000 OT |
Kaur |
|
NOT APPLICABLE
|
|
Installation of 300 linear feet of light duty sidewalk shed for waterproof
|
|
Work on Floor(s): 001
|
| 08/19/2003 |
103542506 |
01 |
A2 |
P APPROVED |
08/19/2003 |
0058384 PE |
Millman |
|
NOT APPLICABLE
|
|
Removal and replacement of concrete structural slab and deteriorated brick
|
|
Work on Floor(s): BAS
|
| 10/01/2002 |
103277026 |
01 |
A3 |
X SIGNED OFF |
05/12/2010 |
OT |
SINGH |
|
NOT APPLICABLE
|
|
ERECT SIDEWALK SHED. COMPLY WITH LL 31/99 AND TPPN 9/99. NO CHANGE IN USE
|
|
Work on Floor(s): 001
|
| 04/20/2001 |
102531618 |
01 |
A2 |
X SIGNED OFF |
06/19/2008 |
0012967 RA |
SINGH |
|
NOT APPLICABLE
|
|
1ST FLOOR: PERFORM MINOR DEMOLITION, ERECT PARTITIONS AND PERFORM
|
|
Work on Floor(s): 001
|
| 04/14/1999 |
102046126 |
01 |
A2 |
X SIGNED OFF |
11/01/2000 |
0048198 PE |
MORRISON |
|
NOT APPLICABLE
|
|
REMOVAL & REPLACEMENT OF GAS OVERHEAD & RISERS, CONNECTING TO EXISTING E
|
|
Work on Floor(s): CEL 001 thru 014
|
| 08/24/1996 |
101379250 |
01 |
A2 |
R PERMIT-ENTIRE |
09/27/1996 |
0047135 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
INSTALL NEW OUTSIDE HP GAS SERVICE, GAS METER & REDUCING STATION, NEW LP
|
|
Work on Floor(s): CEL
|
| 06/19/1996 |
101324719 |
02 |
A2 |
P APPROVED |
08/02/1996 |
0052944 PE |
SCHNAAR |
|
NOT APPLICABLE
|
|
FILING 10 SP HEADS IN CONJ WITH FS WORK NO CHANGE TO USE EGRESS OR OCCUP
|
|
Work on Floor(s): CEL
|
| 06/13/1996 |
101324719 |
01 |
A2 |
Q PERMIT-PARTIAL |
02/27/1997 |
0052944 PE |
SCHNAAR |
|
NOT APPLICABLE
|
|
REPLACE TWO FUEL OIL STORAGE TANKS IN CO AL BUNKER AREA. NO CHANGE IN US
|
|
Work on Floor(s): CEL
|