 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 04/16/2025 |
110230697 |
02 |
A2 |
P APPROVED |
04/18/2025 |
0015616 RA |
THOMSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 06/30/2023 |
140927870 |
09 |
A1 |
P APPROVED |
08/11/2023 |
|
MCCLUSKI |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,PEN,ROF,MEZ 001 thru 005
|
| 02/16/2023 |
140927870 |
08 |
A1 |
P APPROVED |
03/07/2023 |
|
MCCLUSKI |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,PEN,ROF,MEZ 001 thru 005
|
| 12/19/2022 |
140927870 |
07 |
A1 |
P APPROVED |
01/12/2023 |
|
MCCLUSKI |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,PEN,ROF,MEZ 001 thru 005
|
| 09/23/2022 |
140927870 |
06 |
A1 |
P APPROVED |
09/23/2022 |
|
MCCLUSKI |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,PEN,ROF,MEZ 001 thru 005
|
| 09/07/2022 |
140927870 |
05 |
A1 |
P APPROVED |
09/12/2022 |
|
MCCLUSKI |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,PEN,ROF,MEZ 001 thru 005
|
| 08/02/2022 |
140918372 |
03 |
A2 |
P APPROVED |
08/03/2022 |
|
MCCLUSKI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,PEN,ROF 001 thru 005
|
| 08/02/2022 |
140927870 |
04 |
A1 |
P APPROVED |
08/03/2022 |
|
MCCLUSKI |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,PEN,ROF,MEZ 001 thru 005
|
| 07/14/2022 |
140921705 |
03 |
A2 |
P APPROVED |
07/15/2022 |
|
GOTTLIEB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PEN,ROF 002 thru 005
|
| 06/02/2022 |
140927870 |
03 |
A1 |
P APPROVED |
07/07/2022 |
|
MCCLUSKI |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,PEN,ROF,MEZ 001 thru 005
|
| 04/14/2022 |
140984273 |
04 |
A2 |
P APPROVED |
05/25/2022 |
|
WESTRICK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002 thru 005
|
| 10/28/2021 |
140984273 |
03 |
A2 |
P APPROVED |
11/01/2021 |
|
WESTRICK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002 thru 005
|
| 03/26/2021 |
140927870 |
02 |
A1 |
P APPROVED |
04/09/2021 |
|
MCCLUSKI |
|
PENDING
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,PEN,ROF,MEZ 001 thru 005
|
| 01/25/2021 |
140997651 |
01 |
A3 |
X SIGNED OFF |
05/20/2022 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY GANTRY MATERIAL HOIST AS PER PLANS. NO CHANGE IN
|
|
Work on Floor(s): GND
|
| 01/22/2021 |
140984273 |
02 |
A2 |
P APPROVED |
01/25/2021 |
|
WESTRICK |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002 thru 005
|
| 12/01/2020 |
140985575 |
01 |
A3 |
X SIGNED OFF |
07/20/2022 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY WEATHER ENCLOSURE AS PER PLANS. NO CHANGE IN USE
|
|
Work on Floor(s): OSP
|
| 11/25/2020 |
140984273 |
01 |
A2 |
X SIGNED OFF |
06/15/2022 |
0085870 PE |
WESTRICK |
|
NOT APPLICABLE
|
|
INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE I
|
|
Work on Floor(s): 002 thru 005
|
| 10/23/2020 |
140970233 |
01 |
A3 |
X SIGNED OFF |
07/27/2022 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN U
|
|
Work on Floor(s): OSP
|
| 10/22/2020 |
140969325 |
01 |
A3 |
X SIGNED OFF |
05/20/2022 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS. NO CHANGE IN USE, EG
|
|
Work on Floor(s): OSP
|
| 10/15/2020 |
140921705 |
02 |
A2 |
P APPROVED |
10/23/2020 |
|
GOTTLIEB |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 FILING HEREWITH STRUCTURAL MODIFICATIONS IN
|
|
Work on Floor(s): PEN,ROF 002 thru 005
|
| 10/14/2020 |
140965926 |
01 |
A3 |
X SIGNED OFF |
12/08/2020 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, E
|
|
Work on Floor(s): OSP
|
| 10/14/2020 |
140918381 |
03 |
A2 |
P APPROVED |
10/22/2020 |
|
MCCLUSKI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 005
|
| 09/25/2020 |
140958024 |
01 |
A3 |
X SIGNED OFF |
07/20/2022 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP,ROF 001 thru 005
|
| 09/22/2020 |
140953920 |
01 |
A2 |
J P/E DISAPPROVED |
12/09/2021 |
0080894 PE |
GOTTLIEB |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/24/2022 FILING HEREWITH STRUCTURAL MODIFICATIONS TO EXIST
|
|
Work on Floor(s): SC, CEL,MEZ,PEN,ROF 001 thru 005
|
| 09/11/2020 |
140918381 |
02 |
A2 |
P APPROVED |
10/05/2020 |
|
MCCLUSKI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 FILING HEREWITH CELLAR,PENTHOUSE & ROOF SCO
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 005
|
| 08/25/2020 |
140918372 |
02 |
A2 |
P APPROVED |
04/22/2022 |
|
MCCLUSKI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC, CEL,PEN,ROF 001 thru 005
|
| 07/22/2020 |
140927870 |
01 |
A1 |
R PERMIT-ENTIRE |
10/28/2022 |
0039000 RA |
MCCLUSKI |
|
PENDING
|
|
FILING HEREWITH ALTERATION TYPE I FOR LINCOLN CENTER'S DAVID GEFFEN HALL.
|
|
Work on Floor(s): SC, CEL,PEN,ROF,MEZ 001 thru 005
|
| 07/06/2020 |
140921705 |
01 |
A2 |
X SIGNED OFF |
07/22/2022 |
0080894 PE |
GOTTLIEB |
|
NOT APPLICABLE
|
|
FILING HEREWITH STRUCTURAL MODIFICATIONS INCLUSIVE OF PARTIAL DEMOLITION,
|
|
Work on Floor(s): PEN,ROF 002 thru 005
|
| 07/02/2020 |
140918381 |
01 |
A2 |
X SIGNED OFF |
04/15/2022 |
0039000 RA |
MCCLUSKI |
|
NOT APPLICABLE
|
|
FILING HEREWITH CELLAR,PENTHOUSE & ROOF SCOPE RENOVATIONS, INCLUSIVE OF RE
|
|
Work on Floor(s): CEL,PEN,ROF 001 thru 005
|
| 07/02/2020 |
140918372 |
01 |
A2 |
X SIGNED OFF |
08/05/2022 |
0039000 RA |
MCCLUSKI |
|
NOT APPLICABLE
|
|
FILING HEREWITH NON-STRUCTURAL DEMOLITION SCOPE - AKA SOFT INTERIOR DEMOLI
|
|
Work on Floor(s): SC, CEL,PEN,ROF 001 thru 005
|
| 07/01/2020 |
140920500 |
01 |
A2 |
H P/E IN PROCESS |
07/01/2020 |
0080894 PE |
GOTTLIEB |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 09/29/2020 FILING HEREWITH STRUCTURAL MODIFICATIONS INCLUSIVE
|
|
Work on Floor(s): PEN,ROF
|
| 04/30/2020 |
140898580 |
01 |
A2 |
X SIGNED OFF |
09/01/2021 |
0084951 PE |
MASONE |
|
NOT APPLICABLE
|
|
FILING HEREWITH INSTALLATION OF TEMPORARY SITE-OFFICE CONSTRUCTION TRAILER
|
|
Work on Floor(s): OSP
|
| 11/20/2018 |
123538895 |
01 |
A3 |
X SIGNED OFF |
01/30/2019 |
0017578 RA |
FORMICHE |
|
NOT APPLICABLE
|
|
INSTALL OF TEMP PLATFORM AND INTERIOR TRUSS,NO ALTERATIONS TO EXIST STRUCT
|
|
Work on Floor(s): 001
|
| 07/23/2018 |
123488626 |
01 |
A2 |
X SIGNED OFF |
12/14/2021 |
0016846 RA |
BASILE |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR
|
|
Work on Floor(s): FAC
|
| 04/02/2018 |
123390909 |
01 |
A3 |
R PERMIT-ENTIRE |
04/02/2018 |
0017578 RA |
FORMICHE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/20/2021 INSTALL OF TEMP PLATFORM AND TENT ON PLAZA, NO AL
|
|
Work on Floor(s): 001
|
| 02/08/2017 |
122926049 |
01 |
A3 |
X SIGNED OFF |
08/30/2018 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF CHAIN LINK FENCE ON TOP OF PLASTIC BARRIERS AS PER DRAWING
|
|
Work on Floor(s): OSP
|
| 02/08/2017 |
122932620 |
01 |
A3 |
X SIGNED OFF |
08/21/2018 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COM
|
|
Work on Floor(s): OSP
|
| 01/09/2017 |
122895723 |
01 |
A2 |
X SIGNED OFF |
03/01/2017 |
0001561 RA |
THOMSON |
|
NOT APPLICABLE
|
|
APPLICATION IS FILED FOR STAIR REPAIR ON THE LOWER CONCOURSE LEVEL (SUB CE
|
|
Work on Floor(s): SUB
|
| 07/11/2016 |
122827548 |
01 |
A3 |
X SIGNED OFF |
07/26/2016 |
0017578 RA |
FORMICHE |
|
NOT APPLICABLE
|
|
INSTALL INTERIOR LED TRUSS TOWERS & SCREEN, PERFORMANCE PLATFOM, DECKING F
|
|
Work on Floor(s): 001
|
| 03/02/2016 |
104116323 |
03 |
PA |
P APPROVED |
03/03/2016 |
|
THOMSON |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|