| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/05/2020 |
123412798 |
05 |
A1 |
J P/E DISAPPROVED |
12/21/2022 |
|
CETRA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 HEREWITH FILING TO CHANGE USE ON THE 1ST FL
|
|
Work on Floor(s): CEL,ROF 001 thru 004
|
| 02/28/2020 |
123412798 |
04 |
A1 |
P APPROVED |
03/05/2020 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001
|
| 10/18/2019 |
140873990 |
01 |
A3 |
X SIGNED OFF |
05/01/2020 |
0086757 PE |
PERDEK |
|
NOT APPLICABLE
|
|
INSTALLATION OF TEMPORARY WORK PLATFORM AS PER DRAWINGS. TEMPORARY WORK PL
|
|
Work on Floor(s): 001
|
| 09/18/2019 |
123745778 |
01 |
A2 |
X SIGNED OFF |
12/09/2020 |
0017070 RA |
MACKIW |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW ROOF AND RELATED FINISHES AS PER PLANS FILED HEREWITH.
|
|
Work on Floor(s): OSP,RF
|
| 11/19/2018 |
123412798 |
03 |
A1 |
R PERMIT-ENTIRE |
11/21/2018 |
0064095 PE |
MURRAY |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK INCLUSIVE OF FRAMING, CREATING USE BETWEEN BUILDINGS 277 &
|
|
Work on Floor(s): CEL,001
|
| 11/19/2018 |
123412798 |
02 |
A1 |
R PERMIT-ENTIRE |
02/28/2019 |
0066709 PE |
GERAZOUN |
|
NOT APPLICABLE
|
|
INSTALL DUCTWORK AND UNITS.INSTALL PLUMBING FIXTURES AND PIPING AS SHOWN O
|
|
Work on Floor(s): CEL,001
|
| 08/16/2018 |
123412798 |
01 |
A1 |
R PERMIT-ENTIRE |
02/28/2019 |
0018861 RA |
CETRA |
|
NOT APPLICABLE
|
|
PROPOSE TO CHANGE USE ON CELLAR & 1ST FLOORS TO RETAIL. CREATE OPENING BET
|
|
Work on Floor(s): CEL,001
|