| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/07/2021 |
123332483 |
05 |
A2 |
P APPROVED |
12/14/2021 |
|
STASIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PH, ROF 001 thru 019
|
| 08/23/2021 |
141004632 |
01 |
A3 |
P APPROVED |
08/23/2021 |
0034963 RA |
SAGHARI |
|
NOT APPLICABLE
|
|
PROPOSED SITE SAFETY PLAN AS PER FACADE REPAIRS. NO PERMIT IS REQUIRED PER
|
|
Work on Floor(s): FAC,ROF
|
| 10/27/2020 |
123332483 |
04 |
A2 |
P APPROVED |
11/09/2020 |
0088730 PE |
STASIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PH, ROF 001 thru 019
|
| 12/27/2019 |
123332483 |
03 |
A2 |
P APPROVED |
01/27/2020 |
|
STASIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PH, ROF 001 thru 019
|
| 09/27/2019 |
140871233 |
01 |
A3 |
P APPROVED |
09/27/2019 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
PROPOSED FACADE SSP FILING (AS ALT3) IN CONJUNCTION WITH DOB JOB #: 123332
|
|
Work on Floor(s): EXT
|
| 01/07/2019 |
140825524 |
01 |
A2 |
X SIGNED OFF |
01/16/2020 |
0095847 PE |
ARENA |
|
NOT APPLICABLE
|
|
REPLACE BOILER BREECHING AS PER PLANS.
|
|
Work on Floor(s): CEL,ROF,1FL
|
| 06/19/2018 |
123332483 |
02 |
A2 |
P APPROVED |
07/12/2018 |
|
STASIO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PH, ROF 001 thru 019
|
| 04/26/2018 |
123336719 |
02 |
A3 |
P APPROVED |
04/26/2018 |
|
ONYEAGOR |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 06/21/2019
|
|
Work on Floor(s): EXT
|
| 09/27/2017 |
140700427 |
01 |
A3 |
X SIGNED OFF |
10/19/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 09/27/2017 |
123336719 |
01 |
A3 |
P APPROVED |
09/28/2017 |
0063593 PE |
ONYEAGOR |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 06/21/2019 PROPOSED FACADE SSP FILING (AS ALT3) IN CONJUNCTI
|
|
Work on Floor(s): EXT
|
| 09/19/2017 |
140696361 |
01 |
A3 |
X SIGNED OFF |
10/03/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 07/26/2017 |
140673750 |
01 |
A2 |
X SIGNED OFF |
08/11/2020 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
ACTIVATE GAS PORTION OF EXISTING GAS/OIL BURNER ON NYC BOILER NO. MD102219
|
|
Work on Floor(s): CEL
|
| 07/17/2017 |
123332483 |
01 |
A2 |
X SIGNED OFF |
06/21/2023 |
0088730 PE |
STASIO |
|
NOT APPLICABLE
|
|
PROPOSED FACADE REPAIRS AS INDICATED ON PLANS AND APPLICATIONS. THERE IS N
|
|
Work on Floor(s): PH, ROF 001 thru 019
|
| 03/02/2016 |
122693424 |
01 |
A2 |
P APPROVED |
03/08/2016 |
0085879 PE |
QUINTANI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/08/2019 PLANS FILED HEREWITH FOR THE INSTALLATION OF 2 BA
|
|
Work on Floor(s): CEL
|
| 10/20/2015 |
122559212 |
01 |
A2 |
X SIGNED OFF |
12/22/2015 |
0083853 PE |
MASTROGI |
|
NOT APPLICABLE
|
|
FILING TO OBTAIN EUP CARDS FOR EXISTING HVAC UNITS AS PER PLANS SUBMITTED
|
|
Work on Floor(s): ROF
|
| 05/13/2014 |
140197819 |
01 |
A3 |
X SIGNED OFF |
02/20/2015 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED AS PER PLANS. NO CHANGE I
|
|
Work on Floor(s): OSP
|
| 05/01/2014 |
121889509 |
02 |
A2 |
P APPROVED |
05/06/2014 |
|
LICALZI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): PEN
|
| 04/15/2014 |
121979010 |
01 |
A2 |
P APPROVED |
05/01/2014 |
0063885 PE |
LICALZI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/08/2019 FIRST FLOOR FACADE REPAIR. NO CHANGE IN EGRESS, U
|
|
Work on Floor(s): 001
|
| 04/15/2014 |
140185662 |
01 |
A3 |
X SIGNED OFF |
07/14/2015 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 01/07/2014 |
121889509 |
01 |
A2 |
X SIGNED OFF |
01/13/2015 |
0063885 PE |
LICALZI |
|
NOT APPLICABLE
|
|
FACADE REPAIR AT PENTHOUSE LEVEL. NO CHANGE IN EGRESS, USE OR OCCUPANCY IN
|
|
Work on Floor(s): PEN
|
| 04/29/2013 |
121590983 |
01 |
A2 |
X SIGNED OFF |
10/08/2013 |
0063885 PE |
LICALZI |
|
NOT APPLICABLE
|
|
CONSTRUCTION FENCE IN CONJUNCTION WITH FACADE REPAIR. NO CHANGE IN EGRESS,
|
|
Work on Floor(s): 001
|
| 02/27/2013 |
121411141 |
03 |
A2 |
P APPROVED |
03/20/2013 |
|
HAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 01/18/2013 |
121411141 |
02 |
A2 |
P APPROVED |
01/24/2013 |
|
HAO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 01/17/2013 |
121500269 |
01 |
A3 |
X SIGNED OFF |
06/09/2015 |
0017519 RA |
BERZAK |
|
NOT APPLICABLE
|
|
INTERIOR DEMOLITION OF NON-LOAD BEARING PARTITIONS PREVIOUSLY ERECTED WITH
|
|
Work on Floor(s): 008
|
| 11/27/2012 |
121445757 |
01 |
A2 |
R PERMIT-ENTIRE |
12/11/2012 |
0084996 PE |
CHEN |
|
NOT APPLICABLE
|
|
INSTALL MANUAL AND AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYST
|
|
Work on Floor(s): CEL,BAS
|
| 11/23/2012 |
121070072 |
02 |
A2 |
P APPROVED |
12/07/2012 |
|
MASTROGI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001
|
| 10/16/2012 |
121411141 |
01 |
A2 |
X SIGNED OFF |
07/31/2013 |
0030225 RA |
HAO |
|
NOT APPLICABLE
|
|
FILING TO ADD 76 SPRINKLER HEADS TO EXISTING SPRINKLER SYSTEM FOR THE FIRS
|
|
Work on Floor(s): 001
|
| 05/08/2012 |
121070072 |
01 |
A2 |
X SIGNED OFF |
08/14/2013 |
0083853 PE |
MASTROGI |
|
NOT APPLICABLE
|
|
FILING FOR INTERIOR RENOVATION OF THE FIRST FLOOR RETAIL SPACE INCLUDING N
|
|
Work on Floor(s): CEL,001
|
| 04/19/2012 |
120926828 |
02 |
A2 |
P APPROVED |
05/17/2012 |
|
EPSTEIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 01/17/2012 |
120951185 |
01 |
A2 |
X SIGNED OFF |
07/01/2015 |
0017519 RA |
BERZAK |
|
NOT APPLICABLE
|
|
REMOVAL AND INSTALLATION OF NON-BEARING INTERIOR PARTITIONS. CAP 2 FIXTURE
|
|
Work on Floor(s): CEL,BAS
|
| 12/16/2011 |
120926828 |
01 |
A2 |
X SIGNED OFF |
01/16/2014 |
0058291 PE |
EPSTEIN |
|
NOT APPLICABLE
|
|
WATER PENETRATION REPAIRWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO EGR
|
|
Work on Floor(s): 001
|
| 01/19/2010 |
104590587 |
02 |
A2 |
P APPROVED |
02/22/2010 |
|
EPSTEIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 19
|
| 09/24/2009 |
104566113 |
02 |
A3 |
P APPROVED |
10/01/2009 |
|
Hulme |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 04/03/2009 |
110405455 |
02 |
A3 |
P APPROVED |
04/07/2009 |
|
WALSH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 01/05/2009 |
110405455 |
01 |
A3 |
X SIGNED OFF |
08/31/2009 |
0064004 PE |
WALSH |
|
NOT APPLICABLE
|
|
ERECT A TOTAL OF 130 LINEAR FEET BY 200 APPROXIMATE MAXIMUM FEET HIGH TUBU
|
|
Work on Floor(s): 001
|
| 03/21/2008 |
104921621 |
03 |
A3 |
P APPROVED |
05/14/2008 |
|
McERLEAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 SUBMITTING THIS PAA TO ADD ADDITIONAL SCAFF
|
|
Work on Floor(s): 001
|
| 01/17/2008 |
104921621 |
02 |
A3 |
P APPROVED |
02/19/2008 |
0020419 RA |
McERLEAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 SUBMITTING THIS PAA TO ADD ADDITIONAL SCAFF
|
|
Work on Floor(s): 001
|
| 10/05/2007 |
104921621 |
01 |
A3 |
X SIGNED OFF |
01/11/2011 |
0020419 RA |
McERLEAN |
|
NOT APPLICABLE
|
|
SUBMITTING THIS PAA TO ADD ADDITIONAL SCAFFOLDING AS PER NEW SC-2 SHEET AT
|
|
Work on Floor(s): 001
|
| 10/01/2007 |
104912971 |
01 |
A2 |
X SIGNED OFF |
12/08/2009 |
0058291 PE |
EPSTEIN |
|
NOT APPLICABLE
|
|
EXTERIOR REPAIR WORK AS PER PLANS FILEDNO CHANGES
|
|
Work on Floor(s): 19
|
| 10/31/2006 |
104590587 |
01 |
A2 |
X SIGNED OFF |
09/08/2010 |
0058291 PE |
EPSTEIN |
|
NOT APPLICABLE
|
|
EXTERIOR REPAIRWORK AS PER PLANS FILED HEREWITH. NO CHANGE TO EGRESS, US
|
|
Work on Floor(s): 19
|