| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/30/2019 |
104305011 |
08 |
PA |
P APPROVED |
11/01/2019 |
0018716 RA |
COLLINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1ST
|
| 10/12/2018 |
104305011 |
07 |
PA |
P APPROVED |
10/17/2018 |
|
COLLINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1ST
|
| 02/06/2017 |
123014291 |
01 |
PA |
U COMPLETED |
02/03/2020 |
0018716 RA |
COLLINS |
|
NOT APPLICABLE
|
|
Work on Floor(s): BAS
|
| 05/04/2016 |
140491563 |
01 |
A3 |
X SIGNED OFF |
08/24/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 05/04/2016 |
140491545 |
01 |
A3 |
X SIGNED OFF |
08/24/2018 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 05/02/2016 |
122654895 |
02 |
A2 |
P APPROVED |
06/15/2016 |
|
BRUNI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): OSP
|
| 01/22/2016 |
122654895 |
01 |
A2 |
X SIGNED OFF |
02/12/2018 |
0031182 RA |
BRUNI |
|
NOT APPLICABLE
|
|
FACADE REPAIR
|
|
Work on Floor(s): OSP
|
| 04/22/2015 |
104305011 |
06 |
PA |
P APPROVED |
04/22/2015 |
|
COLLINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1ST
|
| 03/18/2015 |
104305011 |
05 |
PA |
P APPROVED |
04/07/2015 |
|
COLLINS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1ST
|
| 03/01/2013 |
104305011 |
04 |
PA |
D A/P ENTIRE |
03/05/2013 |
0187161 RA |
COLLINS |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/26/2015
|
|
Work on Floor(s): 1ST
|
| 05/12/2010 |
110199865 |
04 |
A1 |
P APPROVED |
05/12/2010 |
|
SANTIAGO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 1 thru 3
|
| 05/06/2010 |
110199865 |
03 |
A1 |
P APPROVED |
05/07/2010 |
|
SANTIAGO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 1 thru 3
|
| 04/15/2010 |
110199865 |
02 |
A1 |
P APPROVED |
04/23/2010 |
|
SANTIAGO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS 1 thru 3
|
| 07/21/2009 |
104480526 |
11 |
A2 |
P APPROVED |
07/22/2009 |
|
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 03/06/2009 |
104480526 |
10 |
A2 |
P APPROVED |
03/17/2009 |
|
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 11/12/2008 |
104480526 |
09 |
A2 |
P APPROVED |
11/14/2008 |
|
FORSTER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 08/15/2008 |
104857905 |
02 |
A2 |
P APPROVED |
08/20/2008 |
|
Vuto |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,001,002,003
|
| 06/09/2008 |
110199865 |
01 |
A1 |
X SIGNED OFF |
05/12/2010 |
0164961 RA |
SANTIAGO |
|
NOT APPLICABLE
|
|
FILING HEREWITH ALTERATION TYPE ONE FOR THE PURPOSES OF UPDATING CURRENT C
|
|
Work on Floor(s): CEL,BAS 1 thru 3
|
| 10/04/2007 |
104482837 |
02 |
A2 |
P APPROVED |
01/04/2008 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL 001 thru 003
|
| 10/03/2007 |
104916174 |
01 |
A2 |
X SIGNED OFF |
03/16/2010 |
0071109 PE |
Vuto |
|
NOT APPLICABLE
|
|
Installation of a new fire alarm system as per plans filed herewith. No ch
|
|
Work on Floor(s): CEL,ATT,BAS 001 thru 003
|
| 09/18/2007 |
104901732 |
01 |
A3 |
X SIGNED OFF |
09/03/2009 |
OT |
DEL MAST |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED 60' DURING FACADE REPAIR. NO CH
|
|
Work on Floor(s): 001
|
| 09/18/2007 |
104901723 |
01 |
A3 |
X SIGNED OFF |
09/03/2009 |
OT |
DEL MAST |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD 60' LONG BY 39' (FROM GRADE) HIGH ON EXISTING
|
|
Work on Floor(s): 001
|
| 08/02/2007 |
104857905 |
01 |
A2 |
X SIGNED OFF |
03/09/2009 |
0071109 PE |
Vuto |
|
NOT APPLICABLE
|
|
Installation/modification to existing plumbing fixtures as per plans filed
|
|
Work on Floor(s): CEL,BAS,001,002,003
|
| 07/30/2007 |
104480526 |
08 |
A2 |
L P/E PAA $ PENDIN |
09/21/2007 |
0041866 PE |
SILMAN |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 11/26/2008
|
|
Work on Floor(s): CEL,BAS
|
| 06/09/2007 |
104480526 |
07 |
A2 |
P APPROVED |
09/26/2007 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 04/26/2007 |
104480526 |
06 |
A2 |
P APPROVED |
07/18/2007 |
0071109 PE |
FORSTER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 09/01/2006 |
104480526 |
05 |
A2 |
P APPROVED |
09/08/2006 |
0041866 PE |
SILMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,BAS
|
| 08/22/2006 |
104536986 |
01 |
A2 |
X SIGNED OFF |
08/27/2009 |
0024178 RA |
VEDMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF KITCHEN FIRE SUPPERIONSYSTEM. NO CHANGE IN USE,EGRESS
|
|
Work on Floor(s): BAS
|
| 08/16/2006 |
104480526 |
04 |
A2 |
P APPROVED |
08/23/2006 |
0071109 PE |
FORSTER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BAS
|
| 07/18/2006 |
104482837 |
01 |
A2 |
X SIGNED OFF |
10/16/2008 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
MODIFICATIONS TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH.
|
|
Work on Floor(s): CEL 001 thru 003
|
| 07/03/2006 |
104480526 |
03 |
A2 |
X SIGNED OFF |
08/19/2009 |
0041866 PE |
SILMAN |
|
NOT APPLICABLE
|
|
FILING HEREWITH FOR STRUCTURAL MODIFICATIONS AS PER PLANS. NO CHANGE IN
|
|
Work on Floor(s): CEL,BAS
|
| 07/03/2006 |
104480526 |
02 |
A2 |
X SIGNED OFF |
08/19/2009 |
0071109 PE |
VUTO |
|
NOT APPLICABLE
|
|
MODIFICATRION TO EXISTING HVAC SYSTEM,INSTALLATION OF PLUMBING FIXTURE
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 07/03/2006 |
104480526 |
01 |
A2 |
X SIGNED OFF |
08/19/2009 |
0071109 PE |
FORSTER |
|
NOT APPLICABLE
|
|
INSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS FILED HEREWITH.
|
|
Work on Floor(s): CEL,BAS,ROF 001 thru 003
|
| 12/21/2005 |
104305011 |
02 |
PA |
P APPROVED |
12/21/2005 |
0023354 RA |
FORSTER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 FILING HEREWITH TO INDICATE LOCATION FOR 73
|
|
Work on Floor(s): 1ST
|
| 12/01/2005 |
104305011 |
01 |
PA |
U COMPLETED |
12/21/2005 |
0018716 RA |
COLLINS |
|
NOT APPLICABLE
|
|
FILING HEREWITH TO INDICATE LOCATION FOR 73-75 MCDOUGAL STREET TO
|
|
Work on Floor(s): 1ST
|
| 08/26/1999 |
102469080 |
01 |
A2 |
R PERMIT-ENTIRE |
09/02/1999 |
0050579 PE |
RUDIKOFF |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER. NO CHANGE IN EGRESS, OCCUPANCY OR
|
|
Work on Floor(s): CEL
|
| 03/25/1998 |
101798583 |
01 |
PA |
J P/E DISAPPROVED |
01/21/1999 |
0000998 RA |
PISCIONE |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/26/2019
|
|
Work on Floor(s): 1
|
| 07/27/1995 |
101109051 |
01 |
A2 |
Q PERMIT-PARTIAL |
07/31/1995 |
0053541 PE |
HAHN |
|
NOT APPLICABLE
|
|
INSTALL RANGEHOOD FIRE SUPPRESSION SYSTEM, AS SHOWN ON PLAN. NO
|
|
Work on Floor(s): 1
|
| 09/17/1990 |
100114243 |
01 |
PA |
P APPROVED |
03/19/1991 |
0006209 RA |
SALVATI |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/26/2019
|
|
Work on Floor(s): BAS,001
|
|
104305011 |
03 |
PA |
A PRE-FILED |
03/01/2013 |
|
|
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 03/18/2015
|
|
Work on Floor(s): 1ST
|