| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 11/13/2018 |
140817800 |
01 |
A2 |
R PERMIT-ENTIRE |
03/25/2019 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APARTMENT 3A, INCLUDING REMOVING AND INSTA
|
|
Work on Floor(s): 004
|
| 06/01/2018 |
140771546 |
01 |
A2 |
R PERMIT-ENTIRE |
07/16/2018 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
HEREWITH FILE DRAWINGS TO RENOVATE APT 2A; INCLUDING REMOVAL AND INSTALLAT
|
|
Work on Floor(s): 003
|
| 02/02/2018 |
140736657 |
01 |
A2 |
R PERMIT-ENTIRE |
07/16/2018 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT GC. WORK TO INCLUDE REMOVAL AND INSTAL
|
|
Work on Floor(s): 001
|
| 11/27/2017 |
140717883 |
01 |
A2 |
R PERMIT-ENTIRE |
01/09/2018 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT 4C. WORK TO INCLUDE REMOVAL OF NON-BEA
|
|
Work on Floor(s): 005
|
| 08/29/2017 |
140688021 |
01 |
A2 |
R PERMIT-ENTIRE |
07/16/2018 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
HEREWITH FILE DRAWINGS TO RENOVATE APT 3B AND 4B; INCLUDING REMOVING AND
|
|
Work on Floor(s): 004,005
|
| 04/28/2017 |
140635481 |
01 |
A2 |
R PERMIT-ENTIRE |
05/10/2017 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
HEREWITH FILE DRAWINGS TO RENOVATE APT GB AND 4D; INCLUDING NON-BEARING
|
|
Work on Floor(s): 001,005
|
| 04/27/2017 |
140634936 |
01 |
A2 |
H P/E IN PROCESS |
04/27/2017 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 04/28/2017 HEREWITH FILE DRAWINGS TO RENOVATE APT GB AND 4D;
|
|
Work on Floor(s): 001,005
|
| 03/16/2017 |
140617232 |
01 |
A2 |
R PERMIT-ENTIRE |
05/10/2017 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
HEREWITH FILE PLANS TO RENOVATE APT 1B. WORK TO INCLUDE NONBEARING PARTITI
|
|
Work on Floor(s): 002
|
| 03/15/2017 |
140616634 |
01 |
A2 |
H P/E IN PROCESS |
03/15/2017 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/15/2017 HEREWITH FILE PLANS TO RENOVATE APT 1B. WORK TO
|
|
Work on Floor(s): 001
|
| 03/15/2017 |
140616616 |
01 |
A2 |
H P/E IN PROCESS |
03/15/2017 |
0019112 RA |
KRESHTOO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 03/15/2017 HEREWITH FILE PLANS TO RENOVATE APT 1B. WORK TO
|
|
Work on Floor(s): 001
|
| 07/29/2016 |
122841489 |
01 |
SG |
X SIGNED OFF |
08/30/2016 |
0087243 PE |
WONG |
|
NOT APPLICABLE
|
|
LEGALIZE ACCESSORY BUSINESS SIGN ON WALL.NOT WITHIN VIEW OF ARTERIAL HIGHW
|
|
Work on Floor(s): OSP
|
| 06/27/2014 |
121352730 |
02 |
A2 |
P APPROVED |
07/15/2014 |
|
LIBASCI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 001
|
| 08/22/2012 |
121352730 |
01 |
A2 |
X SIGNED OFF |
03/10/2016 |
0023066 RA |
LIBASCI |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING STORES. NO CHANGE TO USE, OCCUPANCY OR EG
|
|
Work on Floor(s): 001
|
| 06/23/2011 |
120734955 |
01 |
A3 |
X SIGNED OFF |
04/02/2014 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, E
|
|
Work on Floor(s): 001
|
| 08/07/1995 |
101113037 |
02 |
A2 |
X SIGNED OFF |
07/28/2000 |
0020199 RA |
BARUJEL |
|
NOT APPLICABLE
|
|
FLUE AS PER PLANS
|
|
Work on Floor(s): CEL
|
| 07/31/1995 |
101113037 |
01 |
A2 |
X SIGNED OFF |
07/28/2000 |
0020199 RA |
BARUJEL |
|
NOT APPLICABLE
|
|
INSTALL NEW REPLACEMENT BOILER MEA# 198-87-E AND MEA 153-90-E AND
|
|
Work on Floor(s): CEL
|
| 05/12/1995 |
100754756 |
02 |
A1 |
P APPROVED |
05/15/1995 |
0013035 RA |
CHURGIN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,BNM,THU,4FL
|
| 07/28/1994 |
100871317 |
01 |
A3 |
R PERMIT-ENTIRE |
01/24/1995 |
|
LEVINE |
|
NOT APPLICABLE
|
|
CONSTRUCT CONSTRUCTION FENCE IN CONJUNCTION WITH ALTERATION
|
|
Work on Floor(s): CEL,BAS 1 thru 4
|
| 03/22/1994 |
100792607 |
01 |
SI |
U COMPLETED |
04/12/1994 |
0013035 RA |
CHURGIN |
|
NOT APPLICABLE
|
|
Work on Floor(s): CEL,BNM,1FL,THU,4FL
|
| 01/03/1994 |
100754756 |
01 |
A1 |
X SIGNED OFF |
12/07/1995 |
0013035 RA |
CHURGIN |
|
NOT APPLICABLE
|
|
SUBSTANTIAL REHABILITATION INCLUDING PARTITIONS,PLUMBING.
|
|
Work on Floor(s): CEL,BNM,THU,4FL
|