 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/20/2026 |
123380607 |
22 |
A1 |
P APPROVED |
02/18/2026 |
|
ZHENG |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 09/02/2025 |
123380607 |
21 |
A1 |
P APPROVED |
10/07/2025 |
0082012 PE |
KAMBERIS |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,001,MEZ,ROF,OSP
|
| 07/11/2025 |
123380607 |
20 |
A1 |
P APPROVED |
10/07/2025 |
0091145 PE |
WALCOTT |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,MEZ,ROF
|
| 06/05/2025 |
123380607 |
19 |
A1 |
P APPROVED |
07/01/2025 |
|
ZHENG |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 03/03/2025 |
123380607 |
18 |
A1 |
P APPROVED |
03/07/2025 |
0082012 PE |
KAMBERIS |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,001,MEZ,ROF,OSP
|
| 02/19/2025 |
123380607 |
17 |
A1 |
P APPROVED |
03/07/2025 |
|
ZHENG |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 01 HORIZONTAL AND VERTICAL EXTENSION AT CELLAR
|
|
Work on Floor(s): CEL,001,ROF
|
| 08/20/2024 |
123380607 |
16 |
A1 |
P APPROVED |
10/29/2024 |
|
ZHENG |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 07/09/2024 |
123380607 |
15 |
A1 |
P APPROVED |
08/30/2024 |
0082012 PE |
KAMBERIS |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,001,MEZ,ROF,OSP
|
| 07/09/2024 |
123380607 |
14 |
A1 |
P APPROVED |
07/10/2024 |
0091145 PE |
WALCOTT |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,MEZ,ROF
|
| 06/26/2024 |
123380607 |
13 |
A1 |
P APPROVED |
07/10/2024 |
|
ZHENG |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 09/07/2023 |
123380607 |
12 |
A1 |
P APPROVED |
09/18/2023 |
|
ZHENG |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 07/05/2023 |
123380607 |
11 |
A1 |
P APPROVED |
10/23/2023 |
0082012 PE |
KAMBERIS |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): CEL,001,MEZ,ROF,OSP
|
| 12/21/2022 |
123380607 |
10 |
A1 |
P APPROVED |
06/22/2023 |
|
ZHENG |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 06/09/2022 |
123380607 |
09 |
A1 |
P APPROVED |
06/14/2022 |
|
ZHENG |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 02/28/2022 |
123380607 |
08 |
A1 |
P APPROVED |
03/04/2022 |
0091145 PE |
WALCOTT |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,MEZ,ROF
|
| 09/02/2020 |
123380607 |
07 |
A1 |
P APPROVED |
10/20/2020 |
0091145 PE |
WALCOTT |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,MEZ,ROF
|
| 08/07/2020 |
123380607 |
06 |
A1 |
P APPROVED |
08/13/2020 |
0091145 PE |
WALCOTT |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,MEZ,ROF
|
| 02/25/2020 |
123380607 |
05 |
A1 |
P APPROVED |
03/06/2020 |
0099197 PE |
ZHENG |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,001,ROF
|
| 06/19/2019 |
123380607 |
04 |
A1 |
P APPROVED |
07/18/2019 |
0091145 PE |
WALCOTT |
|
GRANTED 05/21/2019
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): CEL,001,MEZ,ROF
|
| 06/27/2018 |
123380607 |
03 |
A1 |
R PERMIT-ENTIRE |
12/07/2020 |
0082012 PE |
KAMBERIS |
|
GRANTED 05/21/2019
|
|
MECHANICAL AND SPRINKLER SYSTEM FILED IN CONJUNCTION WITH THE ALTERATION I
|
|
Work on Floor(s): CEL,001,MEZ,ROF,OSP
|
| 06/27/2018 |
123380607 |
02 |
A1 |
R PERMIT-ENTIRE |
12/07/2020 |
0091145 PE |
WALCOTT |
|
GRANTED 05/21/2019
|
|
STRUCTURAL WORK FILED IN CONJUNCTION WITH THE ALTERATION I APPLICATION.
|
|
Work on Floor(s): CEL,001,MEZ,ROF
|
| 06/27/2018 |
123380607 |
01 |
A1 |
R PERMIT-ENTIRE |
10/15/2025 |
0099197 PE |
ZHENG |
|
GRANTED 05/21/2019
|
|
HORIZONTAL AND VERTICAL EXTENSION AT CELLAR AND FIRST FLOOR,
|
|
Work on Floor(s): CEL,001,ROF
|
| 03/20/2018 |
123412618 |
01 |
A2 |
R PERMIT-ENTIRE |
03/22/2018 |
0044402 PE |
MASSAND |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AS PER PLAN FILED HEREWIT
|
|
Work on Floor(s): CEL,001
|
| 09/22/2011 |
120833679 |
01 |
A2 |
X SIGNED OFF |
12/14/2011 |
0072803 PE |
WONG |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF APTS. #3L & 3R WITH REPAIR OF PARTITION WALLS, CEIL
|
|
Work on Floor(s): 003
|
| 11/19/2008 |
110395581 |
01 |
A3 |
X SIGNED OFF |
12/31/2008 |
0072803 PE |
WONG |
|
NOT APPLICABLE
|
|
REPLACE EXIST. INTERIOR STAIRS WITH NEW STEEL STAIRS FROM 2ND TO 5TH FLOOR
|
|
Work on Floor(s): 002 thru 005
|
| 09/05/2008 |
110334709 |
01 |
A2 |
X SIGNED OFF |
05/18/2009 |
0085450 PE |
ZHOU |
|
NOT APPLICABLE
|
|
RE-MODEL EXISTING KITCHEN FIRE SUPPRESSION SYSTEM
|
|
Work on Floor(s): 001
|
| 07/25/2008 |
110296162 |
01 |
A2 |
R PERMIT-ENTIRE |
07/29/2008 |
0062079 PE |
FERRARO |
|
NOT APPLICABLE
|
|
REBUILD FRONT PARAPET WALL 25 LF AS SHOWN ON PLANS. PROVIDED.SIDEWALK SHED
|
|
Work on Floor(s): ROF
|
| 11/09/2007 |
110017972 |
01 |
A3 |
R PERMIT-ENTIRE |
03/31/2008 |
0029017 RA |
WESOLOWS |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 25 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 05/17/2002 |
103162337 |
01 |
A2 |
R PERMIT-ENTIRE |
08/07/2002 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
Install ansul system in conjunction with application # 103153677. No chang
|
|
Work on Floor(s): 001
|
| 05/08/2002 |
103153677 |
01 |
A2 |
R PERMIT-ENTIRE |
06/25/2002 |
0018525 RA |
TAM |
|
NOT APPLICABLE
|
|
Partition & plumbing work as per plan. Minor structural alterationwork. Re
|
|
Work on Floor(s): CEL,MEZ,001
|
| 05/14/1990 |
100040126 |
01 |
A1 |
R PERMIT-ENTIRE |
12/10/1990 |
0054064 PE |
CHOY |
|
NOT APPLICABLE
|
|
SUBMITTED HEREWITH APPLICATION FOR WORK INCLUDING 1 ADD NEW EXTENSION AT
|
|
Work on Floor(s): 001,CEL
|