 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 10/15/2019 |
140863359 |
02 |
A2 |
P APPROVED |
05/28/2021 |
|
AHMED |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INTERIOR RENOVATION OF EXISTING OFFICE SPAC
|
|
Work on Floor(s): 004
|
| 08/07/2019 |
140863359 |
01 |
A2 |
X SIGNED OFF |
12/20/2022 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF EXISTING OFFICE SPACE ON 4TH FL
|
|
Work on Floor(s): 004
|
| 07/23/2019 |
140859024 |
01 |
A2 |
X SIGNED OFF |
12/29/2020 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
BATHROOM (MALE/FEMALE)RENOVATION WORK ON THE 5TH FLOOR. NO CHANGE IN USE,E
|
|
Work on Floor(s): 005
|
| 05/02/2019 |
140845600 |
01 |
A2 |
X SIGNED OFF |
05/02/2024 |
0038346 RA |
MENDEZ |
|
NOT APPLICABLE
|
|
REMOVAL AND INSTALLATION OF PARTITIONS AND PLUMBING FIXTURES ON 11 FL AS P
|
|
Work on Floor(s): 011
|
| 04/02/2019 |
140840259 |
01 |
A2 |
R PERMIT-ENTIRE |
04/16/2019 |
0038346 RA |
MENDEZ |
|
NOT APPLICABLE
|
|
INSTALLATION OF PARTITIONS AND PLUMBING FIXTURES ON THE SECOND FLOOR AS PE
|
|
Work on Floor(s): 002
|
| 04/02/2019 |
140840197 |
01 |
A2 |
X SIGNED OFF |
07/12/2019 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
MECHANICAL WORK ON FIRST FLOOR AS PER PLANS. NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): 001
|
| 04/02/2019 |
140840142 |
01 |
A2 |
X SIGNED OFF |
07/12/2019 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF PLUMBING FIXTURES IN THE LOBBY AS PER PLANS. NO CHANGE IN
|
|
Work on Floor(s): 001
|
| 03/21/2019 |
140837708 |
01 |
A2 |
Q PERMIT-PARTIAL |
03/22/2019 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
REMOVAL OF PARTITIONS, CAP AND REMOVAL OF PLUMBING FIXTURES AS PER PLANS.
|
|
Work on Floor(s): 002
|
| 02/06/2019 |
123674513 |
01 |
A2 |
X SIGNED OFF |
02/01/2023 |
0027722 RA |
SHTEIERM |
|
NOT APPLICABLE
|
|
PROPOSE TO RENOVATE 8TH FLOOR, INCLUDING A/C UNIT REPLACEMENT. NO CHANGE I
|
|
Work on Floor(s): 008
|
| 11/02/2018 |
140815642 |
01 |
A2 |
R PERMIT-ENTIRE |
11/05/2018 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF SUITE 1200 AS PER PLANS. NO CHANGE IN USE, EGRESS,
|
|
Work on Floor(s): 012
|
| 11/02/2018 |
140815857 |
01 |
A2 |
X SIGNED OFF |
07/02/2019 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INTERIOR RENOVATION OF SUITE 200 AS PER PLANS. NO CHANGE IN USE, EGRESS, O
|
|
Work on Floor(s): 002
|
| 02/02/2018 |
140736522 |
01 |
A2 |
X SIGNED OFF |
07/12/2019 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
LOBBY RENOVATIONS AND REMOVAL OF PARTITIONS AS PER PLANS. NO CHANGE IN USE
|
|
Work on Floor(s): LOB,001
|
| 03/13/2017 |
140604264 |
01 |
A2 |
R PERMIT-ENTIRE |
10/05/2017 |
0014625 RA |
MAY |
|
NOT APPLICABLE
|
|
FACADE REPAIRS AS PER THE PLANS FILED.
|
|
Work on Floor(s): FAC,ROF
|
| 03/08/2017 |
140614011 |
01 |
A3 |
X SIGNED OFF |
08/17/2018 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGRESS, OR
|
|
Work on Floor(s): GRD
|
| 02/01/2017 |
140600400 |
01 |
A3 |
X SIGNED OFF |
08/17/2018 |
0072914 PE |
AHMED |
|
NOT APPLICABLE
|
|
INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS.NO CHANGE IN USE, EG
|
|
Work on Floor(s): GRD
|
| 09/04/2013 |
121757125 |
01 |
A2 |
X SIGNED OFF |
10/09/2013 |
0027722 RA |
SHTEIERM |
|
NOT APPLICABLE
|
|
REPLACEMENT OF 2 EXISTING AC UNITS (NO DUCT WORK) ON THE 11TH FLOOR AND 12
|
|
Work on Floor(s): 011,012
|
| 01/31/2007 |
104667200 |
01 |
A2 |
X SIGNED OFF |
05/02/2008 |
0047726 PE |
ANISO |
|
NOT APPLICABLE
|
|
FACADE REPAIRSNO CHANGE TO USE, EGRESS OR
|
|
Work on Floor(s): 001,THR,ROF
|