| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/23/2018 |
140630529 |
03 |
A2 |
P APPROVED |
04/11/2018 |
|
DIBARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF
|
| 02/01/2018 |
140630529 |
02 |
A2 |
P APPROVED |
02/13/2018 |
|
DIBARI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS,ROF
|
| 04/17/2017 |
140630529 |
01 |
A2 |
X SIGNED OFF |
03/04/2019 |
0062063 PE |
DIBARI |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE BOILER WITH ALL ITS COMPONENTS PER PLANS. PROVIDE DUAL
|
|
Work on Floor(s): CEL,ROF
|
| 11/22/2016 |
140577463 |
01 |
A3 |
X SIGNED OFF |
05/25/2018 |
0093179 PE |
AHMED |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD
|
|
Work on Floor(s): OSP
|