 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/17/2018 |
140692515 |
03 |
A2 |
P APPROVED |
01/19/2018 |
|
BONSIGNO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 12/04/2017 |
140692515 |
02 |
A2 |
P APPROVED |
12/13/2017 |
|
BONSIGNO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 004
|
| 09/11/2017 |
140692515 |
01 |
A2 |
X SIGNED OFF |
02/12/2018 |
0025767 RA |
BONSIGNO |
|
NOT APPLICABLE
|
|
REMOVE/INSTALL OF INTERIOR NON-LOAD BEARING PARTITIONS, DOORS, PLUMBING FI
|
|
Work on Floor(s): 004
|
| 10/05/2015 |
140411089 |
01 |
A2 |
P APPROVED |
10/05/2015 |
0025767 RA |
BONSIGNO |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 09/14/2017 REMOVAL OF INTERIOR NON-LOAD BEARING PARTITIONS,
|
|
Work on Floor(s): 004
|
| 12/30/2011 |
120938049 |
01 |
A2 |
X SIGNED OFF |
07/18/2012 |
0087678 PE |
BAZINI |
|
NOT APPLICABLE
|
|
REPLACE BOILER AND OIL BURNER. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
|
|
Work on Floor(s): CEL
|
| 05/07/2007 |
104757176 |
01 |
A3 |
R PERMIT-ENTIRE |
05/07/2007 |
0018466 RA |
WHITE |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF 28 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR
|
|
Work on Floor(s): OSP
|
| 10/24/2006 |
104588956 |
01 |
A2 |
Q PERMIT-PARTIAL |
11/21/2006 |
0014873 RA |
Ayotte |
|
NOT APPLICABLE
|
|
Renovation and combination of existing apartments #1A and #1B on the 1st f
|
|
Work on Floor(s): 001
|
| 06/23/2004 |
103817470 |
01 |
A3 |
X SIGNED OFF |
01/19/2006 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
Install heavy duty sidewalk shed a total of 20 ft long at 32 Downing Stre
|
|
Work on Floor(s): 001
|
| 12/07/1995 |
101162901 |
01 |
A2 |
R PERMIT-ENTIRE |
02/07/1996 |
0047135 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REPLACEMENT 1 NEW BOILER BURNER. INSTALL I NEW OIL FIRED HOT WATER HEAT
|
|
Work on Floor(s): CEL
|
| 04/03/1991 |
100230493 |
01 |
A3 |
X SIGNED OFF |
06/12/1991 |
0007310 RA |
WESTPHAL |
|
NOT APPLICABLE
|
|
DISCONTINUANCE OF INCINERATOR.REMOVE GRATES & BLOCK UP ALL OPENINGS.
|
|
Work on Floor(s): CEL 1 thru 5
|