 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 03/09/2023 |
122193223 |
12 |
A1 |
P APPROVED |
06/16/2023 |
0086805 PE |
TOBIAS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 005
|
| 01/23/2023 |
122193223 |
11 |
A1 |
P APPROVED |
01/25/2023 |
|
PINNER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,CEL,ROF,MZ1 001 thru 005
|
| 10/11/2022 |
122193223 |
10 |
A1 |
P APPROVED |
12/20/2022 |
0018533 RA |
PINNER |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,CEL,ROF,MZ1 001 thru 005
|
| 06/28/2019 |
123778714 |
01 |
A2 |
P APPROVED |
07/12/2019 |
0087797 PE |
HELMAN |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/11/2024 SHORING WORK AS PER PLANS FILED HEREWITH. N CHANG
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 005
|
| 06/10/2019 |
123544637 |
02 |
A3 |
P APPROVED |
06/11/2019 |
|
O'HARA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 07/11/2024
|
|
Work on Floor(s): SC1,CEL 001 thru 005
|
| 06/10/2019 |
122193223 |
09 |
A1 |
P APPROVED |
06/11/2019 |
|
O'HARA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,CEL,ROF,MZ1 001 thru 005
|
| 05/07/2019 |
123763427 |
01 |
A2 |
R PERMIT-ENTIRE |
11/12/2021 |
0086805 PE |
TOBIAS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 08/01/2024 TEMPORARY SPRINKLER LOOP AS PER PLANS FILED HEREW
|
|
Work on Floor(s): SUB,CEL,005,ROF 001 thru 003
|
| 09/19/2018 |
122193223 |
08 |
A1 |
P APPROVED |
01/09/2019 |
0082265 PE |
WONG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 005
|
| 09/19/2018 |
122193223 |
07 |
A1 |
P APPROVED |
01/09/2019 |
0086805 PE |
TOBIAS |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 005
|
| 08/30/2018 |
122193223 |
06 |
A1 |
P APPROVED |
11/21/2018 |
|
O'HARA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,CEL,ROF,MZ1 001 thru 005
|
| 08/28/2018 |
123544637 |
01 |
A3 |
P APPROVED |
08/28/2018 |
0025215 RA |
O'HARA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/11/2024 TENANT PROTECTION PLAN AS PER PLANS FILED HEREWIT
|
|
Work on Floor(s): SC1,CEL 001 thru 005
|
| 07/25/2017 |
122193223 |
05 |
A1 |
P APPROVED |
08/11/2017 |
|
O'HARA |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SC1,CEL,ROF,MZ1 001 thru 005
|
| 01/20/2016 |
122193223 |
04 |
A1 |
P APPROVED |
02/18/2016 |
|
ROUSHAKE |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 RENO OF EXSTG 5-STORY MIXED-USE BLDG . ARC
|
|
Work on Floor(s): SC1,CEL,ROF,MZ1 001 thru 005
|
| 01/13/2016 |
121737852 |
02 |
A2 |
P APPROVED |
01/15/2016 |
|
JIJINA |
|
NOT APPLICABLE
|
|
DOC WITHDRAWN 05/26/2016
|
|
Work on Floor(s): 005,006,ROF
|
| 06/08/2015 |
140358351 |
01 |
A3 |
X SIGNED OFF |
12/28/2016 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF PIPE SCAFFOLD AS PER PLANS. NO CHANGE IN USE, EGR
|
|
Work on Floor(s): OSP
|
| 06/08/2015 |
140358315 |
01 |
A3 |
X SIGNED OFF |
12/28/2016 |
0082770 PE |
BAILEY |
|
NOT APPLICABLE
|
|
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE
|
|
Work on Floor(s): OSP
|
| 11/12/2014 |
122193223 |
03 |
A1 |
R PERMIT-ENTIRE |
10/15/2015 |
0082265 PE |
WONG |
|
NOT APPLICABLE
|
|
STRUCTURAL WORK IN CONJUNCTION WITH RENOVATION OF AN EXISTING 5-STORY MIXE
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 005
|
| 11/12/2014 |
122193223 |
02 |
A1 |
R PERMIT-ENTIRE |
01/22/2019 |
0086805 PE |
TOBIAS |
|
NOT APPLICABLE
|
|
MECHANICAL,PLUMBING,AND SPRINKLER WORK IN CONJUCTION WITH RENOVATION OF EX
|
|
Work on Floor(s): SC1,CEL,ROF 001 thru 005
|
| 11/12/2014 |
122193223 |
01 |
A1 |
R PERMIT-ENTIRE |
11/06/2025 |
0018533 RA |
PINNER |
|
NOT APPLICABLE
|
|
RENO OF EXSTG 5-STORY MIXED-USE BLDG . ARCHITECTURAL WORK
|
|
Work on Floor(s): SC1,CEL,ROF,MZ1 001 thru 005
|
| 06/05/2014 |
121992996 |
01 |
A3 |
X SIGNED OFF |
01/22/2016 |
0088950 PE |
ACAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL
|
|
Work on Floor(s): 001
|
| 05/29/2014 |
121917104 |
01 |
A2 |
J P/E DISAPPROVED |
06/10/2014 |
0065035 PE |
ENG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 07/11/2024 INTERIOR FIRE ALARM WORK THROUGHOUT EXISTING FOR
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 006
|
| 09/26/2013 |
121789387 |
01 |
A2 |
R PERMIT-ENTIRE |
10/25/2013 |
0016325 RA |
BAKSA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/24/2015 INTERIOR REMOVAL AT 5TH FLOOR ONLY. NO CHANGE TO
|
|
Work on Floor(s): 005
|
| 09/09/2013 |
121772670 |
01 |
A3 |
X SIGNED OFF |
01/22/2016 |
0088950 PE |
ACAR |
|
NOT APPLICABLE
|
|
INSTALLATION OF A SCAFFOLD @ ROOF LEVEL TO OUTLINE A PROPOSED NEW STRUCTUR
|
|
Work on Floor(s): ROF
|
| 08/20/2013 |
121754636 |
01 |
A2 |
P APPROVED |
08/21/2013 |
0016325 RA |
BAKSA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/05/2015 INTERIOR RENOVATION TO PARTIAL FIRST FLOOR. NO CH
|
|
Work on Floor(s): 001
|
| 08/05/2013 |
121737852 |
01 |
A2 |
R PERMIT-ENTIRE |
05/14/2014 |
0060340 PE |
JIJINA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 05/26/2016 STRUCTURAL WORK IN CONJUNCTION WITH NEW ROOFTOP A
|
|
Work on Floor(s): 005,006,ROF
|
| 07/11/2013 |
121710951 |
01 |
A2 |
P APPROVED |
02/13/2014 |
0065035 PE |
ENG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/05/2015 MECHANICAL WORK IN CONJUNCTION WITH NEW ROOFTOP A
|
|
Work on Floor(s): 005,006,ROF
|
| 07/11/2013 |
121710960 |
01 |
A2 |
P APPROVED |
01/21/2014 |
0065035 PE |
ENG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/05/2015 SPRINKLER WORK IN CONJUNCTION WITH NEW ROOFTOP AD
|
|
Work on Floor(s): 005,006
|
| 07/11/2013 |
121710979 |
01 |
A2 |
P APPROVED |
01/21/2014 |
0065035 PE |
ENG |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/05/2015 PLUMBING WORK IN CONJUNCTION WITH NEW ROOFTOP ADD
|
|
Work on Floor(s): 005,006,ROF
|
| 06/20/2013 |
121689324 |
01 |
A1 |
P APPROVED |
01/31/2014 |
0016325 RA |
BAKSA |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/05/2015 NEW ROOFTOP ADDITION AND INTERIOR RENOVATION OF 5
|
|
Work on Floor(s): 005,006,ROF
|
| 04/19/2013 |
121595087 |
01 |
SC |
U COMPLETED |
12/12/2013 |
0016325 RA |
BAKSA |
|
NOT APPLICABLE
|
|
NEW CONDO SUBDIVISION. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
|
|
Work on Floor(s): SUB,CEL,ROF 001 thru 005
|
| 03/19/2013 |
121559223 |
01 |
A3 |
X SIGNED OFF |
01/22/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF 43 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING
|
|
Work on Floor(s): OSP
|
| 03/19/2013 |
121559214 |
01 |
A3 |
X SIGNED OFF |
01/22/2016 |
0083278 PE |
HOQUE |
|
NOT APPLICABLE
|
|
INSTALLATION OF SCAFFOLD AS PER DRAWINGS. SCAFFOLD SHALL COMPLY WITH CHAPT
|
|
Work on Floor(s): OSP
|
| 11/22/2010 |
120147750 |
04 |
A2 |
P APPROVED |
11/24/2010 |
|
PEACHY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 10/19/2010 |
120147750 |
03 |
A2 |
P APPROVED |
11/17/2010 |
|
PEACHY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
|
120428313 |
01 |
A2 |
A PRE-FILED |
07/30/2010 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 11/05/2015 PROVIDE NEW ACCESSORY STAIR TO ROOF AND ROOFDECK.
|
|
Work on Floor(s): 005,MEZ,ROF
|
| 06/29/2010 |
120147750 |
02 |
A2 |
P APPROVED |
07/01/2010 |
|
PEACHY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 002
|
| 02/18/2010 |
120147750 |
01 |
A2 |
X SIGNED OFF |
07/25/2011 |
0013798 RA |
PEACHY |
|
NOT APPLICABLE
|
|
PERFORM CHANGES TO APARTMENT #2. REMOVE AND ERECT PORTIONS OF PARTITIONS A
|
|
Work on Floor(s): 002
|
| 10/31/2008 |
104018885 |
09 |
A1 |
P APPROVED |
11/14/2008 |
|
PEACHY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 005
|
| 06/11/2008 |
104018885 |
08 |
A1 |
P APPROVED |
06/26/2008 |
|
PEACHY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 LEGALIZE IMD UNITS.
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 005
|
| 05/20/2008 |
104018885 |
07 |
A1 |
P APPROVED |
06/04/2008 |
|
PEACHY |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): SUB,CEL,MEZ 001 thru 005
|