 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 05/13/2025 |
103651629 |
11 |
A2 |
P APPROVED |
05/13/2025 |
0097209 PE |
AUNG |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,OSP
|
| 07/12/2023 |
141023906 |
01 |
A2 |
X SIGNED OFF |
02/10/2025 |
0091058 PE |
PATEL |
|
NOT APPLICABLE
|
|
INSTALLATION OF NEW PHOTOVOLTAIC SOLAR PANEL SYSTEM ON SCHOOL BUILDING ROO
|
|
Work on Floor(s): RF
|
| 03/13/2023 |
141022836 |
01 |
A2 |
H P/E IN PROCESS |
03/13/2023 |
0013603 RA |
MEILUS |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 06/11/2023 INSTALLATION OF NEW PHOTOVOLTAIC SOLAR PANEL SYSTE
|
|
Work on Floor(s): RF
|
| 01/20/2023 |
103651629 |
10 |
A2 |
P APPROVED |
01/20/2023 |
0071379 PE |
SHAH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 003
|
| 12/07/2022 |
103651629 |
09 |
A2 |
P APPROVED |
12/07/2022 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,OSP
|
| 10/26/2022 |
141021249 |
01 |
A2 |
H P/E IN PROCESS |
10/26/2022 |
0013603 RA |
MEILUS |
|
NOT APPLICABLE
|
|
ADMIN CLOSED 01/24/2023 INSTALLATION OF NEW PHOTOVOLTAIC SOLAR PANEL SYSTE
|
|
Work on Floor(s): RF
|
| 07/28/2022 |
103651629 |
08 |
A2 |
P APPROVED |
07/28/2022 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,OSP
|
| 01/14/2022 |
103651629 |
07 |
A2 |
P APPROVED |
01/14/2022 |
|
KHALIL |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): BAS,OSP
|
| 08/09/2019 |
103651629 |
06 |
A2 |
P APPROVED |
08/09/2019 |
0025243 RA |
RICARDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): OSP,BAS
|
| 05/15/2019 |
103651834 |
01 |
A3 |
D A/P ENTIRE |
05/15/2019 |
0022384 RA |
TEPLITSK |
|
NOT APPLICABLE
|
|
FILED HEREWITH FIRE PROTECTION PLANS.
|
|
Work on Floor(s): BAS,ROF 001 thru 003
|
| 04/29/2019 |
103651727 |
01 |
A2 |
R PERMIT-ENTIRE |
06/18/2019 |
0069395 PE |
ISLAM |
|
NOT APPLICABLE
|
|
NEW INSTALLATION OF A CO DETECTION SYSTEM FOR BASEMENT AND FIRST FLOOR ARE
|
|
Work on Floor(s): BAS,001
|
| 04/26/2019 |
103651629 |
01 |
A2 |
R PERMIT-ENTIRE |
03/11/2026 |
0071379 PE |
SHAH |
|
NOT APPLICABLE
|
|
REMOVE 2 OIL FIRED BOILERS AND ALL ASSOCIATED PIPING, BREECHING AND CLIMAT
|
|
Work on Floor(s): CEL,ROF,OSP 001 thru 003
|
| 04/26/2019 |
103651629 |
05 |
A2 |
R PERMIT-ENTIRE |
01/31/2020 |
0069395 PE |
ISLAM |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE WITH NEW EXISTING LIGHTING FIXTURES, SWITCHES, WIRING,
|
|
Work on Floor(s): BAS
|
| 04/26/2019 |
103651629 |
04 |
A2 |
R PERMIT-ENTIRE |
01/31/2020 |
0097209 PE |
AUNG |
|
NOT APPLICABLE
|
|
PLUMBING RENOVATIONS FOR BOILER CONVERSION UPGRADE AND WATER SERVICE REPLA
|
|
Work on Floor(s): BAS,OSP
|
| 04/26/2019 |
103651629 |
03 |
A2 |
R PERMIT-ENTIRE |
01/31/2020 |
0025243 RA |
RICARDO |
|
NOT APPLICABLE
|
|
SITE PREPARATION FOR PS 028M, TO BRING IN (2) PACKAGED BOILERS & BURNERS I
|
|
Work on Floor(s): OSP,BAS
|
| 04/26/2019 |
103651629 |
02 |
A2 |
R PERMIT-ENTIRE |
01/31/2020 |
0090880 PE |
LANGLAIS |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE EXISTING CONCRETE EQUIPMENT PADS IN THE BASEMENT FOR BO
|
|
Work on Floor(s): OSP,BAS
|
| 06/06/2017 |
104212424 |
01 |
A3 |
X SIGNED OFF |
05/02/2018 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
FN/PS28M - SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMP
|
|
Work on Floor(s): OSP
|
| 07/12/2016 |
103643791 |
10 |
A2 |
P APPROVED |
07/12/2016 |
|
GO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 05/13/2016 |
103643791 |
09 |
A2 |
P APPROVED |
05/13/2016 |
|
GO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 04/26/2016 |
103643791 |
08 |
A2 |
P APPROVED |
04/26/2016 |
|
GAFFAR |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 04
|
|
Work on Floor(s): ROF,BAS
|
| 02/29/2016 |
103643791 |
07 |
A2 |
P APPROVED |
02/29/2016 |
0071982 PE |
BAEZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 03
|
|
Work on Floor(s): ROF
|
| 02/29/2016 |
103643791 |
06 |
A2 |
P APPROVED |
02/29/2016 |
|
GO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): ROF
|
| 12/03/2013 |
103645281 |
01 |
A3 |
X SIGNED OFF |
08/16/2016 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
PS28M/SF SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPOR
|
|
Work on Floor(s): OSP
|
| 11/27/2013 |
103645263 |
01 |
A3 |
X SIGNED OFF |
08/16/2016 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
PS28M/SH SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPOR
|
|
Work on Floor(s): OSP
|
| 11/27/2013 |
103645254 |
01 |
A3 |
X SIGNED OFF |
08/16/2016 |
0070592 PE |
STILLER |
|
NOT APPLICABLE
|
|
PS28M/FN SUBMITTING ON BEHALF OF CONTRACTOR FOR THE INSTALLATION OF TEMPOR
|
|
Work on Floor(s): OSP,ROF
|
| 11/20/2013 |
140137000 |
01 |
A2 |
X SIGNED OFF |
01/31/2014 |
0091716 PE |
QIU |
|
NOT APPLICABLE
|
|
THIS APPLICATION IS FILLING FOR OBTAINING EQUIPMENT USE PERMIT FOR (2) 12.
|
|
Work on Floor(s): ROF
|
| 04/17/2013 |
103643791 |
05 |
A2 |
X SIGNED OFF |
08/19/2016 |
0069054 PE |
CHAN |
|
NOT APPLICABLE
|
|
PS 28M- PROVIDE NEW 150W WALL PACKS, PROVIDE 2 NUMBER 8 CONDUCTORS TO EXIS
|
|
Work on Floor(s): ROF
|
| 04/17/2013 |
103643791 |
04 |
A2 |
X SIGNED OFF |
08/19/2016 |
0076864 PE |
GAFFAR |
|
NOT APPLICABLE
|
|
REMOVE AND REPLACE ROOF DRAINS, REMOVE AND REPLACE WITH NEW FLASHING AROUN
|
|
Work on Floor(s): ROF,BAS
|
| 04/17/2013 |
103643791 |
03 |
A2 |
X SIGNED OFF |
08/19/2016 |
0071982 PE |
BAEZ |
|
NOT APPLICABLE
|
|
PS 28M- REPLACE EXISTING COMBINATION GYM & AUD EXHAUST WITH NEW, REPLACE
|
|
Work on Floor(s): ROF
|
| 04/17/2013 |
103643791 |
02 |
A2 |
X SIGNED OFF |
08/19/2016 |
0019446 RA |
BEKVALAC |
|
NOT APPLICABLE
|
|
PS 28M- MINOR INTERIOR REPAIRS INCLUDING PLASTER AND PAINTING ON CEILINGS
|
|
Work on Floor(s): ROF
|
| 04/17/2013 |
103643791 |
01 |
A2 |
X SIGNED OFF |
08/19/2016 |
0069970 PE |
GO |
|
NOT APPLICABLE
|
|
PS 28M- ROOF REPLACEMENT, PARAPETS REPLACEMENT,EXTERIOR MASONRY REPAIRS,
|
|
Work on Floor(s): ROF
|
| 02/04/2013 |
120695177 |
03 |
A2 |
P APPROVED |
02/06/2013 |
|
ACKERMAN |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02
|
|
Work on Floor(s): 001,ROF
|
| 08/06/2012 |
121178581 |
01 |
A2 |
J P/E DISAPPROVED |
08/30/2012 |
0080835 PE |
MONTECIL |
|
NOT APPLICABLE
|
|
INSTALLATION OF RETAINING WALL AS PER PLANS FILED HEREWITH. NO CHANGE TO U
|
|
Work on Floor(s): OSP
|
| 05/18/2011 |
120695177 |
02 |
A2 |
X SIGNED OFF |
04/29/2015 |
0071410 PE |
ACKERMAN |
|
NOT APPLICABLE
|
|
MECHANICAL AND PLUMBING MODIFICATIONS ALL AS PER PLANS FILED HEREWITH. NO
|
|
Work on Floor(s): 001,ROF
|
| 05/18/2011 |
120695177 |
01 |
A2 |
X SIGNED OFF |
04/29/2015 |
0017250 RA |
ROSENTHA |
|
NOT APPLICABLE
|
|
REMOVAL AND INSTALLATION OF PARTITIONS, FACADE REPAIR AND RELATED FINISHES
|
|
Work on Floor(s): 001,ROF
|
| 11/26/2010 |
120544054 |
01 |
A2 |
J P/E DISAPPROVED |
11/26/2010 |
0014217 RA |
FRANCO |
|
NOT APPLICABLE
|
|
REMOVE EXISTING EXTERIOR CONCRETE SLAB. INSTALL NEW 1:20 SLOPE CONCRETE SL
|
|
Work on Floor(s): 001
|
| 08/17/2005 |
102145634 |
03 |
PA |
P APPROVED |
08/17/2005 |
0057985 PE |
MALTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 PS28 FIRST FLOOR GYMNASIUM
|
|
Work on Floor(s): 1
|
| 08/17/2005 |
102145643 |
03 |
PA |
P APPROVED |
08/17/2005 |
0057985 PE |
MALTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 03/22/2005 |
102145643 |
02 |
PA |
P APPROVED |
03/22/2005 |
0057985 PE |
MALTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 03/22/2005 |
102145634 |
02 |
PA |
P APPROVED |
03/22/2005 |
0057985 PE |
MALTZ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): 1
|