 |  |  |  |  |  |  |  |  |  |
| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 12/31/2015 |
122568989 |
01 |
A3 |
X SIGNED OFF |
12/12/2019 |
0071719 PE |
UDDIN |
|
NOT APPLICABLE
|
|
INSTALLATION OF 84 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED DURING BUILDING
|
|
Work on Floor(s): OSP
|
| 11/27/2013 |
121793755 |
01 |
A2 |
P APPROVED |
12/24/2013 |
0074266 PE |
WESOLOWS |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 02/05/2014 HEREWITH FILING REMOVAL OF 75 GALLON GAS FIRED HO
|
|
Work on Floor(s): CEL
|
| 06/13/2006 |
104461486 |
01 |
A3 |
X SIGNED OFF |
05/17/2007 |
0020419 RA |
Hulme |
|
NOT APPLICABLE
|
|
INSTALL HEAVY DUTY SIDEWALK SHED FOR A TOTAL OF 85 FT LONG AT 250 WEST 13
|
|
Work on Floor(s): 001
|
| 08/09/2002 |
103234340 |
01 |
A2 |
X SIGNED OFF |
08/08/2003 |
0074266 PE |
WESOLOWS |
|
NOT APPLICABLE
|
|
UPGRADE EXISTING 3,00 GALLON FUEL OIL TA NK WITH RELATED PIPING, LEAK DE
|
|
Work on Floor(s): OG, BAS
|
| 11/28/1997 |
100832636 |
04 |
A2 |
P APPROVED |
12/02/1997 |
0012298 RA |
NESKI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02 PROVIDED MECHANICAL VENTILATION FOR CELL S
|
|
Work on Floor(s): CEL 1 thru 4
|
| 11/12/1997 |
100832636 |
03 |
A2 |
P APPROVED |
12/02/1997 |
0012298 RA |
NESKI |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 02 PROVIDED MECHANICAL VENTILATION FOR CELL S&
|
|
Work on Floor(s): CEL 1 thru 4
|
| 08/03/1994 |
100832636 |
02 |
A2 |
X SIGNED OFF |
07/26/1999 |
0064370 PE |
HERMAN |
|
NOT APPLICABLE
|
|
PROVIDED MECHANICAL VENTILATION FOR CELL S&PRISONERS TOILET.ADDED REDUCE
|
|
Work on Floor(s): CEL 1 thru 4
|
| 08/03/1994 |
100832636 |
01 |
A2 |
X SIGNED OFF |
07/26/1999 |
0012298 RA |
NESKI |
|
NOT APPLICABLE
|
|
ADDED RAMP AND DOOR FOR HANDICAP ACCESSI BILITY.CONVERTED MEN AND WOMEN'
|
|
Work on Floor(s): CEL 1 thru 4
|