| FILE DATE |
JOB # |
DOC # |
JOB TYPE |
JOB STATUS |
STATUS DATE |
LIC # |
APPLICANT |
IN AUDIT |
ZONING APPROVAL |
| 01/29/2020 |
140885497 |
01 |
A2 |
R PERMIT-ENTIRE |
02/28/2020 |
0060930 PE |
SALAMON |
|
NOT APPLICABLE
|
|
FACADE REPAIR
|
|
Work on Floor(s): 001 thru 004
|
| 01/03/2020 |
123865246 |
01 |
A2 |
X SIGNED OFF |
06/14/2022 |
0065403 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
NEW 14 GAGE METAL BREECHING. NEW 10 GAGE STAINLESS STEEL LINER. BOILER/BU
|
|
Work on Floor(s): CEL
|
| 08/17/2012 |
121180097 |
01 |
A2 |
R PERMIT-ENTIRE |
08/23/2012 |
0068464 PE |
RINI III |
|
NOT APPLICABLE
|
|
PROPOSE TO INSTALL SEWAGE EJECTOR ASSEMBLY, SUMP PUMP ASSEMBLY, FLOOR DRAI
|
|
Work on Floor(s): BAS
|
| 07/26/2012 |
121104919 |
02 |
A2 |
P APPROVED |
07/30/2012 |
|
SMITH |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): BAS
|
| 06/07/2012 |
121104919 |
01 |
A2 |
R PERMIT-ENTIRE |
08/06/2012 |
0086542 PE |
SMITH |
|
NOT APPLICABLE
|
|
PROPOSE TO PERFORM INTERIOR NON-STRUCTURAL DEMOLITION,RENOVATION & WATERPR
|
|
Work on Floor(s): BAS
|
| 09/22/2010 |
120432718 |
02 |
A2 |
P APPROVED |
09/28/2010 |
|
CATALDO |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01
|
|
Work on Floor(s): EXT
|
| 09/02/2010 |
120424282 |
02 |
A3 |
P APPROVED |
09/03/2010 |
|
SYED-NAQ |
|
NOT APPLICABLE
|
|
POST APPROVAL AMENDMENT FOR 01 INSTALLATION OF 160 LINEAR FEET OF HEAVY DU
|
|
Work on Floor(s): OSP
|
| 08/23/2010 |
120450109 |
01 |
A3 |
R PERMIT-ENTIRE |
08/24/2010 |
0081461 PE |
RADOMIR |
|
NOT APPLICABLE
|
|
TEMPORARY CONSTRUCTION DEBRIS CHUTE TO BE ERECTED ON WEST FACADE OF THE BU
|
|
Work on Floor(s): EXT
|
| 08/03/2010 |
120432718 |
01 |
A2 |
X SIGNED OFF |
08/05/2011 |
0084457 PE |
CATALDO |
|
NOT APPLICABLE
|
|
EXTERIOR RENOVATIONS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE EGRESS
|
|
Work on Floor(s): EXT
|
| 07/26/2010 |
120424282 |
01 |
A3 |
X SIGNED OFF |
08/05/2011 |
0080123 PE |
SYED-NAQ |
|
NOT APPLICABLE
|
|
INSTALLATION OF 160 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING
|
|
Work on Floor(s): OSP
|
| 07/21/2009 |
120108962 |
01 |
A2 |
X SIGNED OFF |
09/16/2010 |
0016087 RA |
THURN |
|
NOT APPLICABLE
|
|
REMOVE EXISTING MASONRY NON-BEARING PARTITIONS PATCH EXISTING WALLS CEILIN
|
|
Work on Floor(s): 3RD
|
| 12/30/2008 |
110400272 |
01 |
PA |
U COMPLETED |
07/31/2009 |
0012620 RA |
SIKULA |
|
NOT APPLICABLE
|
|
Work on Floor(s): 1ST
|
| 12/10/2008 |
110406132 |
01 |
A2 |
P APPROVED |
09/09/2009 |
0015620 RA |
SIKULA |
|
NOT APPLICABLE
|
|
INSTALLATION OF INTERIOR NON LOAD BEARING PARTITIONS AND RELATED FINISHES
|
|
Work on Floor(s): 001,002
|
| 10/03/2007 |
104914274 |
01 |
A3 |
P APPROVED |
10/03/2007 |
0065430 PE |
HICKEY |
|
NOT APPLICABLE
|
|
JOB WITHDRAWN 12/23/2007 INSTALLATION OF A HEAVY DUTY SHED 180' DURING EME
|
|
Work on Floor(s): 001
|
| 09/13/2007 |
104900582 |
01 |
A2 |
R PERMIT-ENTIRE |
09/13/2007 |
0059063 PE |
Becker |
|
NOT APPLICABLE
|
|
Installing scaffold for facade repair and pointing at front and side wall
|
|
Work on Floor(s): 001
|
| 10/18/1999 |
102431398 |
01 |
A2 |
R PERMIT-ENTIRE |
10/27/1999 |
0047135 PE |
GERMAIN |
|
NOT APPLICABLE
|
|
REPLACE (1) NEW L.P. BOILER AND (1) NEW GAS BURNER. RECONNECT TO
|
|
Work on Floor(s): CEL
|